Block 1389, lot 015
295 29th Ave
- City’s use
- Single Family Residential
- Built
- 1920
- Stories
- 2
- Units
- 1
- Rooms
- 2 bathrooms
- Building
- 2,360 sq ft
- Lot
- 3,837 sq ft
- Zoning
- RH1
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
8 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 11, 2020 | Completed final sign-off Nov 2020 | 295 29th Av | Teevan Company | repair stucco and dry rot at exterior parapet wall at second floor deck above first floor windows. remove and reinsatall existing glass and cap. all work it is visible to the street.Details
repair stucco and dry rot at exterior parapet wall at second floor deck above first floor windows. remove and reinsatall existing glass and cap. all work it is visible to the street. | $12,000 |
| May 23, 2019 | Completed final sign-off May 2019 | 295 29th Av | Advantage Roofing (See Notes) | re-roofingDetails
re-roofing | $9,000 |
| Nov 2, 2016 | Never finaled issued Nov 2016, no final | 295 29th Av | street space & sidewalk repairDetails
street space & sidewalk repair | ||
| Dec 2, 2015 | Never finaled issued Feb 2016, no final | 295 29th Av | street spaceDetails
street space | ||
| May 1, 2014 | Expired or cancelled expired Nov 2016 | 295 29th Av | Bay Area Builders | repair dry rot around exterior trim/window and stucco repair visible to the street, area of repair is approx 100 sq.ft. all replacement is in like kind.compliance with ord 155-13 not required.Details
repair dry rot around exterior trim/window and stucco repair visible to the street, area of repair is approx 100 sq.ft. all replacement is in like kind.compliance with ord 155-13 not required. | $1,000 |
| Mar 1, 2010 | Completed final sign-off Mar 2011 | 295 29th Av | On Center Construction Inc. | revision to pa# n2009.12.10.3028 and 2009.11.30.2240. kitchen wall revision and upstairs bathroom wall revisionDetails
revision to pa# n2009.12.10.3028 and 2009.11.30.2240. kitchen wall revision and upstairs bathroom wall revision | $2,000 |
| Dec 10, 2009 | Completed final sign-off Mar 2011 | 295 29th Av | On Center Construction Inc. | remove 8 ' wall between estg kichen and dining room. remove extg wall at rear utility and sitting room to make one large family room.Details
remove 8 ' wall between estg kichen and dining room. remove extg wall at rear utility and sitting room to make one large family room. | $7,000 |
| Nov 30, 2009 | Completed final sign-off Mar 2011 | 295 29th Av | On Center Construction Inc. | replace all windows, aluminum & wood in kind total of 27. remodel 2 full bathrooms and 1/2 bath. fix rot on (e). replacement of ductwork for new furnace, replace water heater. kitchen remodel. no structural work.new lighting. u<0.67 provide h.e.lights per t.24 new furnaceDetails
replace all windows, aluminum & wood in kind total of 27. remodel 2 full bathrooms and 1/2 bath. fix rot on (e). replacement of ductwork for new furnace, replace water heater. kitchen remodel. no structural work.new lighting. u<0.67 provide h.e.lights per t.24 new furnace | $33,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- On Center Construction Inc. (3), Advantage Roofing (See Notes), Bay Area Builders, Teevan Company
- Engineers
- Chandra Chaudhury
- Authorized agent-otherss
- Mihai Nedelcu
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover single-family homes like this one.