Block 1385, lot 001
2401 Lake St
- City’s use
- Multi-Family Residential
- Built
- 1952
- Stories
- 3
- Units
- 12
- Rooms
- 12 bathrooms
- Building
- 7,935 sq ft
- Lot
- 3,371 sq ft
- Zoning
- RM1
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
11 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 29, 2023 | Never finaled filed Aug 2023, never issued | 2401 Lake St | in kind replacement of all windows. same material - wood aluminum clad and same operation within the openings.Details
in kind replacement of all windows. same material - wood aluminum clad and same operation within the openings. | $90,000 | |
| Jun 8, 2022 | Never finaled issued Jun 2022, no final | 2401 Lake St | M P Roofing Inc | reroofingDetails
reroofing | $20,000 |
| Sep 14, 2020 | Never finaled issued Oct 2020, no final | 2401 Lake St | San Francisco Fire Protection | like for like fire alarm replacement.replacing facp smoke, manual pull exisitng bells will be used as originally installed. monitoring modules (new) will be installed to tie in waterflow and sprinkler system. new horn/strobe and low preq. sounders to comply with 1103.7.6.1Details
like for like fire alarm replacement.replacing facp smoke, manual pull exisitng bells will be used as originally installed. monitoring modules (new) will be installed to tie in waterflow and sprinkler system. new horn/strobe and low preq. sounders to comply with 1103.7.6.1 | $9,000 |
| Apr 29, 2020 | Expired or cancelled cancelled Jul 2023 | 2401 Lake St | San Francisco Fire Protection | like for like fire alarm replacement. replacing facp, smoke detectors and manual pull. extg bells will be used as originally installed. new monitoring modules will be installed to tie in extg waterflow & tamper swich. this upgrade is to prepare the system to comply to 1103.7.6.1 prior to 2021Details
like for like fire alarm replacement. replacing facp, smoke detectors and manual pull. extg bells will be used as originally installed. new monitoring modules will be installed to tie in extg waterflow & tamper swich. this upgrade is to prepare the system to comply to 1103.7.6.1 prior to 2021 | $9,000 |
| Feb 14, 2020 | Never finaled issued Feb 2020, no final | 2401 Lake St | streetspaceDetails
streetspace | ||
| Dec 4, 2019 | Never finaled issued Dec 2019, no final | 2401 Lake St | street spaceDetails
street space | ||
| Sep 30, 2019 | Completed final sign-off Mar 2020 | 2401 Lake St | Maven Maintenance Inc | units 3 & 6: replace bathroom vanity, tub and toilet. upgrade electrical in bathroom, kitchen. replace kitchen cabinets in kind. install new electric subpanel. install new lights.Details
units 3 & 6: replace bathroom vanity, tub and toilet. upgrade electrical in bathroom, kitchen. replace kitchen cabinets in kind. install new electric subpanel. install new lights. | $15,000 |
| Jul 18, 2019 | Completed final sign-off Jan 2020 | 2401 Lake St | Maven Maintenance Inc | uniti 10: replace bathroom vanity/tub/toilet, upgrade electrical in bathroom/kitchen, replace kitchen cabinets in-kind, install new electric subpanel/lights. to compmly with cec 150.0(k) 3 & cec 150.0(k)Details
uniti 10: replace bathroom vanity/tub/toilet, upgrade electrical in bathroom/kitchen, replace kitchen cabinets in-kind, install new electric subpanel/lights. to compmly with cec 150.0(k) 3 & cec 150.0(k) | $10,000 |
| Jul 18, 2019 | Completed final sign-off Jan 2020 | 2401 Lake St | Maven Maintenance Inc | uniti 2: replace bathroom vanity/tub/toilet, upgrade electrical in bathroom/kitchen, replace kitchen cabinets in-kind, install new electric subpanel/lights. to compmly with cec 150.0(k) 3 & cec 150.0(k)Details
uniti 2: replace bathroom vanity/tub/toilet, upgrade electrical in bathroom/kitchen, replace kitchen cabinets in-kind, install new electric subpanel/lights. to compmly with cec 150.0(k) 3 & cec 150.0(k) | $10,000 |
| Jul 18, 2019 | Completed final sign-off Jan 2020 | 2401 Lake St | Maven Maintenance Inc | uniti 12: replace bathroom vanity/tub/toilet, upgrade electrical in bathroom/kitchen, replace kitchen cabinets in-kind, install new electric subpanel/lights. to compmly with cec 150.0(k) 3 & cec 150.0(k)Details
uniti 12: replace bathroom vanity/tub/toilet, upgrade electrical in bathroom/kitchen, replace kitchen cabinets in-kind, install new electric subpanel/lights. to compmly with cec 150.0(k) 3 & cec 150.0(k) | $10,000 |
| Jul 9, 2019 | Completed final sign-off May 2021 | 2401 Lake St | Maven Maintenance Inc | complete various repairs in apartments (unit 1,8&9), storage area, garage and common areas. to comply with and nov's 200865213, 201283953, 201930081, 201931381, 201935001Details
complete various repairs in apartments (unit 1,8&9), storage area, garage and common areas. to comply with and nov's 200865213, 201283953, 201930081, 201931381, 201935001 | $25,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Maven Maintenance Inc (5), San Francisco Fire Protection (2), M P Roofing Inc
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.