Block 1375, lot 039
148 16th Ave
- City’s use
- Multi-Family Residential
- Built
- 2003
- Stories
- 4
- Units
- 2
- Rooms
- 4 bathrooms
- Building
- 3,280 sq ft
- Lot
- 3,184 sq ft
- Zoning
- RH2
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
10 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Oct 4, 2024 | Completed final sign-off May 2025 | 148 16th Av | Turley Construction | to comply with nov# 202426673: repair (e) 1-story, non-habitable shed in kind at rear of property. replace wall and roof framing due to dryrot in back yard. revision to pa#2024-0801-7713.Details
to comply with nov# 202426673: repair (e) 1-story, non-habitable shed in kind at rear of property. replace wall and roof framing due to dryrot in back yard. revision to pa#2024-0801-7713. | $5,000 |
| Aug 1, 2024 | Completed final sign-off May 2025 | 148 16th Av | Turley Construction | replace dry rot sidingDetails
replace dry rot siding | $25,000 |
| May 6, 2024 | Completed final sign-off May 2025 | 148 16th Av | Turley Construction | replace 8 windows like for like. (3) windows are visible from the street. all windows to be alum-clad wood.Details
replace 8 windows like for like. (3) windows are visible from the street. all windows to be alum-clad wood. | $9,000 |
| Apr 20, 2018 | Completed final sign-off Mar 2019 | 148 16th Av | Turley Construction | replace 2 windows in-kind wood for wood 1 casment 1 picture window.Details
replace 2 windows in-kind wood for wood 1 casment 1 picture window. | $5,000 |
| Jun 27, 2014 | Never finaled issued Jun 2014, no final | 148 16th Av | street spaceDetails
street space | ||
| Jun 24, 2010 | Completed final sign-off Aug 2010 | 148 16th Av | Ashbury Gen Constructing & Eng | bathroom remodel on the 3rd floor. no wall removal.Details
bathroom remodel on the 3rd floor. no wall removal. | $15,000 |
| Nov 7, 2002 | Completed final sign-off Apr 2003 | 146 16th Av | Jupiter Enterprises Inc | revise 2002/10/30/0334 to chg 2" fire service to 2" combo meter.no fdc&add connection to check valveDetails
revise 2002/10/30/0334 to chg 2" fire service to 2" combo meter.no fdc&add connection to check valve | |
| Oct 30, 2002 | Completed final sign-off Apr 2003 | 146 16th Av | Jupiter Enterprises Inc | install fire sprinkler system throughout as per plansDetails
install fire sprinkler system throughout as per plans | $10,000 |
| Sep 9, 2002 | Completed final sign-off Apr 2003 | 146 16th Av | revision to exist permit 200012147978 clarify story height at e lndry,nov 200233029 w/addtnl framingDetails
revision to exist permit 200012147978 clarify story height at e lndry,nov 200233029 w/addtnl framing | $1,000 | |
| Dec 14, 2000 | Completed final sign-off Mar 2003 | 146 16th Av | horizontal & vertical addition (site permit sect 311)Details
horizontal & vertical addition (site permit sect 311) | $120,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Turley Construction (4), Jupiter Enterprises Inc (2), Ashbury Gen Constructing & Eng
- Engineers
- Jeff Chow
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover two-family buildings like this one.