Block 1368, lot 054
124 09th Ave
- City’s use
- Single Family Residential
- Built
- 1923
- Stories
- 3
- Units
- 1
- Rooms
- 4 bedrooms, 4 bathrooms
- Building
- 2,872 sq ft
- Zoning
- RH2
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
7 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jul 10, 2020 | Never finaled issued Jul 2020, no final | 124 09th Av | Okell's Fireplace | removal of 2 (e) terra cotta chimney tiles and replace with listed metalbestos class a chimney systems. these are repairs not reconstructions. all work internal, no external work seen from streetDetails
removal of 2 (e) terra cotta chimney tiles and replace with listed metalbestos class a chimney systems. these are repairs not reconstructions. all work internal, no external work seen from street | $15,000 |
| Feb 24, 2016 | Expired or cancelled expired Nov 2017 | 124 09th Av | Eastwood Development Incorporated | remodel existing master bathroom/closet. remodle (e) powder room & add shower located on the 3rd floor.Details
remodel existing master bathroom/closet. remodle (e) powder room & add shower located on the 3rd floor. | $18,000 |
| Feb 16, 2016 | Completed final sign-off Jun 2016 | 124 09th Av | Eastwood Development Incorporated | replace 3 front windows in kind - existing casements / wood - window dry rot repair.Details
replace 3 front windows in kind - existing casements / wood - window dry rot repair. | $2,000 |
| May 20, 2008 | Completed final sign-off May 2008 | 124 09th Av | North Point Construction | renew pa# 2006/02/28/5546 for final inspection only.Details
renew pa# 2006/02/28/5546 for final inspection only. | |
| Feb 28, 2006 | Never finaled issued Feb 2006, no final | 124 09th Av | street spaceDetails
street space | ||
| Feb 28, 2006 | Expired or cancelled expired May 2008 | 124 09th Av | North Point Construction | kitchen alteration, new cabinets,appliances,fixtures and finishes.new wood windows at existing exterior openings.new kitchen lighting to comply with t-24 energy requirements. u factor .67 min.Details
kitchen alteration, new cabinets,appliances,fixtures and finishes.new wood windows at existing exterior openings.new kitchen lighting to comply with t-24 energy requirements. u factor .67 min. | $120,000 |
| Jul 25, 2000 | Completed final sign-off Nov 2000 | 124 09th Av | Christopher Grey Construction | remove & replace tile, plumbing fixtures, sheetrock & floor in upstairs bath-add powder rom in downsDetails
remove & replace tile, plumbing fixtures, sheetrock & floor in upstairs bath-add powder rom in downs | $22,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Eastwood Development Incorporated (2), North Point Construction (2), Christopher Grey Construction, Okell's Fireplace
- Architects
- Curtis Hollenbeck
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.