Block 1368, lot 032
156 09th Ave
- City’s use
- Multi-Family Residential
- Built
- 1965
- Stories
- 3
- Units
- 15
- Rooms
- 15 bathrooms
- Building
- 12,711 sq ft
- Lot
- 6,000 sq ft
- Zoning
- RH2
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
8 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 7, 2023 | Completed final sign-off Sep 2023 | 156 09th Av | Poly-On Security System Inc. | upgrade existing fire alarm system by replacing it with 1-addressible fire alarm unit 1-wireless communicator next to facu 9- addressible smoke detectors, 4-addressible manul pull station, 7-horn strobes, 30-low frequency horns at all residential sleeping areas to comple w/sffc section 1103.7.6.1Details
upgrade existing fire alarm system by replacing it with 1-addressible fire alarm unit 1-wireless communicator next to facu 9- addressible smoke detectors, 4-addressible manul pull station, 7-horn strobes, 30-low frequency horns at all residential sleeping areas to comple w/sffc section 1103.7.6.1 | $19,000 |
| Aug 29, 2018 | Completed final sign-off Dec 2018 | 156 09th Av | U S Prime Contractor Inc | detail change to approved pa 2018-0814-7327 relocation of steel frame 1. ref pa 2018-0510-8847 (soft story)Details
detail change to approved pa 2018-0814-7327 relocation of steel frame 1. ref pa 2018-0510-8847 (soft story) | |
| Aug 23, 2018 | Never finaled issued Aug 2018, no final | 156 09th Av | street spaceDetails
street space | ||
| Aug 14, 2018 | Completed final sign-off Dec 2018 | 156 09th Av | U S Prime Contractor Inc | detail change to 201805108847. steel frame #2 changed because of (e) beamDetails
detail change to 201805108847. steel frame #2 changed because of (e) beam | |
| Jul 6, 2018 | Never finaled issued Jul 2018, no final | 156 09th Av | street spaceDetails
street space | ||
| May 10, 2018 | Completed final sign-off Dec 2018 | 156 09th Av | U S Prime Contractor Inc | soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4Details
soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4 | $130,000 |
| Jul 1, 2014 | Never finaled issued Jul 2014, no final | 156 09th Av | street space & sidewalk permitDetails
street space & sidewalk permit | ||
| Mar 4, 2014 | Completed final sign-off Apr 2014 | 156 09th Av | Cas Construction | unit #101: remodel kitchen and bathroom, replace cabinets and floorings, replace fixtures in kind, no structural work, no change in configurationDetails
unit #101: remodel kitchen and bathroom, replace cabinets and floorings, replace fixtures in kind, no structural work, no change in configuration | $21,000 |
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.