Block 1366, lot 003
111 06th Ave
- City’s use
- Single Family Residential
- Built
- 1904
- Stories
- 2
- Units
- 1
- Rooms
- 4 bedrooms, 3 bathrooms
- Building
- 2,560 sq ft
- Lot
- 2,874 sq ft
- Zoning
- RH2
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
18 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 28, 2020 | Completed final sign-off Sep 2021 | 111 06th Av | Marroquin's Roofing | reroofing. remove composition/repair/reroof with water proof barrier & comp shingles. remove/replace (e) gutters & downspoutsDetails
reroofing. remove composition/repair/reroof with water proof barrier & comp shingles. remove/replace (e) gutters & downspouts | $17,000 |
| Sep 11, 2020 | Never finaled filed Sep 2020, never issued | 111 06th Av | Alward Const. Co Inc A Ca Corp | enclose entry porch. porch to remain unconditioned. (refer to permit # 2019-1203-8528 for previously approved work.)Details
enclose entry porch. porch to remain unconditioned. (refer to permit # 2019-1203-8528 for previously approved work.) | $5,000 |
| Sep 10, 2020 | Completed final sign-off Oct 2021 | 111 06th Av | Alward Const. Co Inc A Ca Corp | new rear deck & stair with 1-hr fire rated property line wall. (refer to permit # 2019-1203-8528 for previously approved work.)Details
new rear deck & stair with 1-hr fire rated property line wall. (refer to permit # 2019-1203-8528 for previously approved work.) | $10,000 |
| Aug 4, 2020 | Never finaled issued Aug 2020, no final | 111 06th Av | street spaceDetails
street space | ||
| Aug 4, 2020 | Never finaled filed Aug 2020, never issued | 111 06th Av | street space | ||
| Mar 9, 2020 | Completed final sign-off Nov 2021 | 111 06th Av | Alward Const. Co Inc A Ca Corp | revision to permit 201912038528: additional demo at rear facade to be replaced in kindDetails
revision to permit 201912038528: additional demo at rear facade to be replaced in kind | |
| Dec 23, 2019 | Never finaled issued Dec 2019, no final | 111 06th Av | street spaceDetails
street space | ||
| Dec 3, 2019 | Completed final sign-off Nov 2021 | 111 06th Av | Alward Const. Co Inc A Ca Corp | reconfigure of space on all floors. laundry room added to ground floor. infill under existing kitchen @ rear. chimney removed @ 1st and 2nd floor. rear bedrooms joined to make master bedroom and bath. infill existing lightwell. remodel kitchen, dining room, family room, & bath. new windows sidingDetails
reconfigure of space on all floors. laundry room added to ground floor. infill under existing kitchen @ rear. chimney removed @ 1st and 2nd floor. rear bedrooms joined to make master bedroom and bath. infill existing lightwell. remodel kitchen, dining room, family room, & bath. new windows siding | $60,000 |
| Oct 8, 2019 | Never finaled issued Oct 2019, no final | 111 06th Av | street spaceDetails
street space | ||
| Oct 27, 2017 | Expired or cancelled withdrawn Dec 2019 | 111 06th Av | 1)infill under extg kitchen, reconfiguration of interior space to include 1 bedroom and 1 bath. 2)reconfiguration of interior spaces. 3)minor interior remodel. 4)new dormer and new deck. 5. infill at level 3 bathroom 6. paintDetails
1)infill under extg kitchen, reconfiguration of interior space to include 1 bedroom and 1 bath. 2)reconfiguration of interior spaces. 3)minor interior remodel. 4)new dormer and new deck. 5. infill at level 3 bathroom 6. paint | $250,000 | |
| Mar 31, 2009 | Never finaled issued Mar 2009, no final | 111 06th Av | street space onlyDetails
street space only | ||
| Mar 17, 2009 | Completed final sign-off Apr 2009 | 111 06th Av | 21st Century Home Improvt | remodel bathroom on 3rd floor: install new fixtures & medicine cabinet, remove closet wall section inside bathroom & install exhaust fan.Details
remodel bathroom on 3rd floor: install new fixtures & medicine cabinet, remove closet wall section inside bathroom & install exhaust fan. | $10,000 |
| Sep 22, 2008 | Completed final sign-off Oct 2008 | 111 06th Av | 21st Century Home Improvt | supply & install vinyl siding to rear wall of home only. in kind. no structural changes. not visible from street.Details
supply & install vinyl siding to rear wall of home only. in kind. no structural changes. not visible from street. | $12,000 |
| Aug 21, 2008 | Completed final sign-off Sep 2008 | 111 06th Av | 21st Century Home Improvt | install additional 2x10 wd joist at kitchen floor to level kitchen floor. replace existing top set footings with new concrete footings. repair and replace stairs at rear in kind with new pressure treated material. raise handrail and repair deck.Details
install additional 2x10 wd joist at kitchen floor to level kitchen floor. replace existing top set footings with new concrete footings. repair and replace stairs at rear in kind with new pressure treated material. raise handrail and repair deck. | $15,000 |
| Aug 19, 2008 | Completed final sign-off Sep 2008 | 111 06th Av | 21st Century Home Improvt | foundation bolt & plywood in garage & install 1/2 plywood. no structural changes. volintary min 5/8 bolts 4' on center 2 bolts per pic of mud sill. min 2x2 sq washer 7" min embedment of bolts. entire peremeter of garage.Details
foundation bolt & plywood in garage & install 1/2 plywood. no structural changes. volintary min 5/8 bolts 4' on center 2 bolts per pic of mud sill. min 2x2 sq washer 7" min embedment of bolts. entire peremeter of garage. | $4,000 |
| Jul 30, 2008 | Completed final sign-off Sep 2008 | 111 06th Av | 21st Century Home Improvt | construct full bathroom in garage, construct sewing room in garage, remove fireplace chimney in garageDetails
construct full bathroom in garage, construct sewing room in garage, remove fireplace chimney in garage | $12,000 |
| Jul 22, 2008 | Completed final sign-off Sep 2008 | 111 06th Av | 21st Century Home Improvt | remodel kitchen in kind. no structural changes. repair front & back stairs (less than 50%) with new wood in kind. 9 steps changed in the back stairs & 4 steps in the front. redwood material phall be used.Details
remodel kitchen in kind. no structural changes. repair front & back stairs (less than 50%) with new wood in kind. 9 steps changed in the back stairs & 4 steps in the front. redwood material phall be used. | $20,000 |
| Sep 1, 2004 | Never finaled issued Sep 2004, no final | 111 06th Av | street space permitDetails
street space permit |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- 21st Century Home Improvt (6), Alward Const. Co Inc A Ca Corp (4), Marroquin's Roofing
- Architects
- Eric H. Hartz (3)
- Engineers
- Richard Tom Tormey (2)
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover single-family homes like this one.