Block 1349, lot 006
10 10th Ave
- City’s use
- Multi-Family Residential
- Built
- 1924
- Stories
- 3
- Units
- 6
- Rooms
- 9 bedrooms, 6 bathrooms
- Building
- 7,335 sq ft
- Lot
- 2,879 sq ft
- Zoning
- RM1
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
9 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Nov 21, 2025 | Completed final sign-off Feb 2026 | 10 10th Av | Abstract Windows Inc. | replace 24 windows like for like the same size (e) openings location all windows are facing the street. the new window will be fiberglass pocket fit installation (street visible)Details
replace 24 windows like for like the same size (e) openings location all windows are facing the street. the new window will be fiberglass pocket fit installation (street visible) | $48,487 |
| Dec 16, 2020 | Completed final sign-off Mar 2021 | 10 10th Av | San Francisco Fire Protection | the water flow and tamper switch were removed because it's a non sprinklered building. ref 2019-1002-3306.Details
the water flow and tamper switch were removed because it's a non sprinklered building. ref 2019-1002-3306. | |
| Sep 9, 2020 | Completed final sign-off Mar 2021 | 10 10th Av | San Francisco Fire Protection | revision to pa# 201910023306. replacement & 2021 mandate installation in full sprinkler bldg, install new ifp-75 manual pull station, smoke detector, low frequency sounders, horn strobes and monitor modules for water flow and tamper switch.Details
revision to pa# 201910023306. replacement & 2021 mandate installation in full sprinkler bldg, install new ifp-75 manual pull station, smoke detector, low frequency sounders, horn strobes and monitor modules for water flow and tamper switch. | |
| Oct 2, 2019 | Completed final sign-off Mar 2021 | 10 10th Av | San Francisco Fire Protection | replacement & 2021 mandate installation of new fire alarm in fully sprinklered bldg. install of new ifp-75, aes 7707 pull station, smoke detector, low frequency, horn strobe and monitor modulesDetails
replacement & 2021 mandate installation of new fire alarm in fully sprinklered bldg. install of new ifp-75, aes 7707 pull station, smoke detector, low frequency, horn strobe and monitor modules | $24,900 |
| Jun 1, 2018 | Never finaled issued Jun 2018, no final | 10 10th Av | street spaceDetails
street space | ||
| Oct 12, 2017 | Never finaled issued Oct 2017, no final | 10 10th Av | street spaceDetails
street space | ||
| Aug 22, 2016 | Never finaled issued Aug 2016, no final | 10 10th Av | street space permit - renewal of permit m692247Details
street space permit - renewal of permit m692247 | ||
| May 18, 2016 | Never finaled issued May 2016, no final | 10 10th Av | street space permitDetails
street space permit | ||
| Apr 15, 2016 | Completed final sign-off Feb 2017 | 10 10th Av | Champion Construction Inc. | soft story retrofit per sfbc chapter 34b engineering criteria 2012 iebc appendix a-4. new footings & shearwall. maher naDetails
soft story retrofit per sfbc chapter 34b engineering criteria 2012 iebc appendix a-4. new footings & shearwall. maher na | $70,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- San Francisco Fire Protection (3), Abstract Windows Inc., Champion Construction Inc.
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.