Block 1302, lot 019
110 El Camino Del Mar
- City’s use
- Single Family Residential
- Built
- 1947
- Stories
- 1
- Units
- 1
- Rooms
- 3 bedrooms, 3 bathrooms
- Building
- 2,013 sq ft
- Lot
- 11,255 sq ft
- Zoning
- RH1D
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
4 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Feb 17, 2021 | Never finaled issued Feb 2023, no final | 110 El Camino Del Mar | remove (e) entry stairway & relocate main entry at g/f. remodel (e) entry door and landing to create (n) access to (n) sundeck. patio addition at 2/f. under (n) sundeck, build (n) garden room. relocate (e) upper level kitchen & dining to lower. remodel (e) garage. interior work. new bay windowDetails
remove (e) entry stairway & relocate main entry at g/f. remodel (e) entry door and landing to create (n) access to (n) sundeck. patio addition at 2/f. under (n) sundeck, build (n) garden room. relocate (e) upper level kitchen & dining to lower. remodel (e) garage. interior work. new bay window | $350,000 | |
| Jul 29, 2009 | Completed final sign-off Sep 2009 | 110 El Camino Del Mar | Jjj & K Inc./Dba: Alexander Company | replace 2 windows and 2 doors size for size not visible from the street 2 doors with anderson door and 2 windows with tru frame with "u" value more or less .67Details
replace 2 windows and 2 doors size for size not visible from the street 2 doors with anderson door and 2 windows with tru frame with "u" value more or less .67 | $10,889 |
| Jun 28, 2005 | Completed final sign-off Dec 2005 | 110 El Camino Del Mar | Ken Topping Home Imprmnts | kitchen remodel.no structural work or walls moved.replace cabinets,sink,dishwasher,faucet,gas rangeDetails
kitchen remodel.no structural work or walls moved.replace cabinets,sink,dishwasher,faucet,gas range | $15,000 |
| Oct 10, 2000 | Completed final sign-off Dec 2000 | 110 El Camino Del Mar | John Barna | repair leaking entry stairs,replace wood ramping,isntall new plywood ramps & landing ,repair sidingDetails
repair leaking entry stairs,replace wood ramping,isntall new plywood ramps & landing ,repair siding | $15,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Jjj & K Inc./Dba: Alexander Company, John Barna, Ken Topping Home Imprmnts
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover single-family homes like this one.