Block 1302, lot 003

28 25th Ave

City’s use
Single Family Residential
Built
1914
Stories
3
Units
1
Rooms
4 bedrooms, 4 bathrooms
Building
5,711 sq ft
Lot
12,432 sq ft
Zoning
RH1D
Construction type
D

From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map

Permits filed here

11 permits filed for this property since 2000.

CompletedIn progressNever finaledExpired or cancelled
FiledOutcomeAddressContractorWork described on the permitDeclared cost
Jul 11, 2023Completed
final sign-off Sep 2023
28 25th AvSaarman Construction,Ltd.building a retaining wall on our side of the property and new fence along the property line to match the location of the exising damage fence.
Details
Permit
202307111886
Status
complete
Filed
Jul 11, 2023
Permit issued
Aug 2, 2023
Final sign-off
Sep 6, 2023
Declared cost
$58,177
Address
28 25th Av

building a retaining wall on our side of the property and new fence along the property line to match the location of the exising damage fence.

Open the permit page

$58,177
Aug 19, 2022Completed
final sign-off Jun 2023
28 25th AvSaarman Construction,Ltd.replace (e) window sashes and door leafs with new. minor stucco repairs associted with sash and leaf replacement. stucco repairs will match existing. 62 windows sashes, 43 window units, 24 door leafs.
Details
Permit
202208190921
Status
complete
Filed
Aug 19, 2022
Permit issued
Aug 22, 2022
Final sign-off
Jun 9, 2023
Declared cost
$577,056
Address
28 25th Av

replace (e) window sashes and door leafs with new. minor stucco repairs associted with sash and leaf replacement. stucco repairs will match existing. 62 windows sashes, 43 window units, 24 door leafs.

Open the permit page

$577,056
Apr 15, 2019Completed
final sign-off Dec 2019
28 25th Avto obtain final inspection for work approved under pa#201604144763, 201504133457 & 201401226767. all work is complete.
Details
Permit
201904158026
Status
complete
Filed
Apr 15, 2019
Permit issued
May 29, 2019
Final sign-off
Dec 12, 2019
Address
28 25th Av

to obtain final inspection for work approved under pa#201604144763, 201504133457 & 201401226767. all work is complete.

Open the permit page

Nov 22, 2017Never finaled
issued Nov 2017, no final
28 25th Avstreet space
Details
Permit
M858327
Status
issued
Filed
Nov 22, 2017
Permit issued
Nov 22, 2017
Address
28 25th Av

street space

Open the permit page

Jul 5, 2017Never finaled
issued Jul 2017, no final
28 25th Avstreet space
Details
Permit
M804567
Status
issued
Filed
Jul 5, 2017
Permit issued
Jul 5, 2017
Address
28 25th Av

street space

Open the permit page

Apr 14, 2016Never finaled
issued Apr 2016, no final
28 25th AvKelly Pacific Constr.,Co.revision to ref pa 2015 0413 3457: addition of full bathroom 2nd flr. convert closet into full bath, second floor, sheet a2.2.
Details
Permit
201604144763
Status
issued
Filed
Apr 14, 2016
Permit issued
Apr 19, 2016
Declared cost
$10,000
Address
28 25th Av

revision to ref pa 2015 0413 3457: addition of full bathroom 2nd flr. convert closet into full bath, second floor, sheet a2.2.

Open the permit page

$10,000
Aug 3, 2015Never finaled
issued Aug 2015, no final
28 25th AvKelly Pacific Constr.,Co.street space
Details
Permit
M610047
Status
issued
Filed
Aug 3, 2015
Permit issued
Aug 3, 2015
Address
28 25th Av

street space

Open the permit page

Apr 13, 2015Never finaled
issued Apr 2015, no final
28 25th AvKelly Pacific Constr.,Co.alteration of rear detached garage per plan. ref pa# 2014/01/22/6767-r. ** maher: compliance with ordinance no# 155-13 not required **
Details
Permit
201504133457
Status
issued
Filed
Apr 13, 2015
Permit issued
Apr 13, 2015
Address
28 25th Av

alteration of rear detached garage per plan. ref pa# 2014/01/22/6767-r. ** maher: compliance with ordinance no# 155-13 not required **

Open the permit page

Jan 22, 2014Never finaled
issued Apr 2015, no final
28 25th AvKelly Pacific Constr.,Co.complete rehab of (e) structure. new foundation, electrical, plumbing, heating, sheet rock, stucco, all finishes, windows, complet remodel. maher: compliance with ordinance# 155-13 not required. excavation < 50 cu.yd.
Details
Permit
201401226767
Status
issued
Filed
Jan 22, 2014
Permit issued
Apr 13, 2015
Declared cost
$1,850,000
Address
28 25th Av

complete rehab of (e) structure. new foundation, electrical, plumbing, heating, sheet rock, stucco, all finishes, windows, complet remodel. maher: compliance with ordinance# 155-13 not required. excavation < 50 cu.yd.

Open the permit page

$1,850,000
May 21, 2010Completed
final sign-off Jul 2010
28 25th AvDissmeyer Corp, Dba Acme Roofing Coreroofing
Details
Permit
201005212934
Status
complete
Filed
May 21, 2010
Permit issued
May 21, 2010
Final sign-off
Jul 26, 2010
Declared cost
$16,276
Address
28 25th Av

reroofing

Open the permit page

$16,276
Mar 14, 2002Completed
final sign-off Apr 2002
28 25th AvEitel Constructionremove & replace decayed slats m outside deck. rewood 2x4's
Details
Permit
200203141373
Status
complete
Filed
Mar 14, 2002
Permit issued
Mar 14, 2002
Final sign-off
Apr 22, 2002
Declared cost
$3,000
Address
28 25th Av

remove & replace decayed slats m outside deck. rewood 2x4's

Open the permit page

$3,000

Who worked here

Everyone with a license on these permits, by role, with how many permits each is on.

Contractors
Kelly Pacific Constr.,Co. (4), Saarman Construction,Ltd. (2), Dissmeyer Corp, Dba Acme Roofing Co, Eitel Construction
Architects
Stephen Willrich