Block 1260, lot 062
122 Divisadero St
- City’s use
- Single Family Residential
- Built
- 1900
- Units
- 1
- Rooms
- 1 bathroom
- Building
- 1,122 sq ft
- Lot
- 2,912 sq ft
- Zoning
- RH3
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
10 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jul 30, 2021 | Completed final sign-off Jan 2022 | 122 Divisadero St | Crana Windows & Doors Dba Kevin Mc Laugh | replacement of 3 wood casement sashes at front and one fiberglass at rear. wood for wood, true decided lite, visible from street.Details
replacement of 3 wood casement sashes at front and one fiberglass at rear. wood for wood, true decided lite, visible from street. | $4,200 |
| Mar 4, 2020 | Never finaled issued Feb 2021, no final | 122 Divisadero St | Crana Windows & Doors Dba Kevin Mc Laugh | replace (1) window at rear, same size and opening. remove aluminum window. install fiberglass. not visible from streetDetails
replace (1) window at rear, same size and opening. remove aluminum window. install fiberglass. not visible from street | $5,000 |
| Aug 10, 2018 | Never finaled issued Aug 2018, no final | 122 Divisadero St | Roofing Logistics | siding & 3 window repair/replace in kind. not visible from st. max ufactor .32. remove 400 sqft of siding & 3 between roof to install new roof system - mechanically attach 250 sqft of 1/4" densdeck primed. install 400 sq ft of new siding underlayment and grace ice and water shield around windows.Details
siding & 3 window repair/replace in kind. not visible from st. max ufactor .32. remove 400 sqft of siding & 3 between roof to install new roof system - mechanically attach 250 sqft of 1/4" densdeck primed. install 400 sq ft of new siding underlayment and grace ice and water shield around windows. | $4,000 |
| Aug 10, 2018 | Completed final sign-off Jun 2020 | 122 Divisadero St | Roofing Logistics | reroofingDetails
reroofing | $26,300 |
| Sep 26, 2012 | Completed final sign-off Oct 2012 | 120 Divisadero St | Excelsior Roofing Company | reroofingDetails
reroofing | $17,600 |
| Mar 18, 2010 | Completed final sign-off Jul 2010 | 120 Divisadero St | remodel finishes in (e) bathroom including replacement of tile, vanity & plumbing fixtures. high efficacy lighting or occupancy sensor control, no change to exhaust systemDetails
remodel finishes in (e) bathroom including replacement of tile, vanity & plumbing fixtures. high efficacy lighting or occupancy sensor control, no change to exhaust system | $15,000 | |
| Jul 28, 2009 | Never finaled issued Jul 2009, no final | 120 Divisadero St | Pfautz Design And Construction | rev. to pa# 2009.02.13.2080. changes to struc, drawings only. augment (e) floor framiong above living rm. change post at stair from 6'6" to 4'4". new 4 x 8 header over rear doors. new floor to deck connection along grid 4 at 2nd fl.Details
rev. to pa# 2009.02.13.2080. changes to struc, drawings only. augment (e) floor framiong above living rm. change post at stair from 6'6" to 4'4". new 4 x 8 header over rear doors. new floor to deck connection along grid 4 at 2nd fl. | $2,500 |
| Jun 16, 2009 | Never finaled issued Jun 2009, no final | 120 Divisadero St | street space permit (bldg. permit app # 200902132080)Details
street space permit (bldg. permit app # 200902132080) | ||
| Feb 13, 2009 | Completed final sign-off Feb 2010 | 120 Divisadero St | replace/reconfiguration of door/windows facing rear deck. interior remodel (new lighting,doorways, stair railing, flooring, some sheetrock repair, etc) new exterior lighting at deck. remove portion of wall at kitchen and part of wall enclosing stair. all work within unit 120 divisadero.Details
replace/reconfiguration of door/windows facing rear deck. interior remodel (new lighting,doorways, stair railing, flooring, some sheetrock repair, etc) new exterior lighting at deck. remove portion of wall at kitchen and part of wall enclosing stair. all work within unit 120 divisadero. | $70,000 | |
| Apr 11, 2003 | Never finaled issued Apr 2003, no final | 120 Divisadero St | Lind Construction | bathroom renovation in kindDetails
bathroom renovation in kind | $20,000 |
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.