Block 1237, lot 032
1029 Page St
- City’s use
- Single Family Residential
- Built
- 1900
- Stories
- 2
- Units
- 1
- Rooms
- 5 bedrooms, 4 bathrooms
- Building
- 3,490 sq ft
- Lot
- 1,546 sq ft
- Zoning
- RM1
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
12 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| May 10, 2022 | Completed final sign-off Aug 2023 | 1029 Page St | Spectrum Development Co. | kitchen remodel and bathroom addition. kitchen remodel includes new finishes, fixtures, cabinets in existing layout. replacement of 3 kitchen windows in kind. addition of new bathroom in 3/f closet and sink area.Details
kitchen remodel and bathroom addition. kitchen remodel includes new finishes, fixtures, cabinets in existing layout. replacement of 3 kitchen windows in kind. addition of new bathroom in 3/f closet and sink area. | $50,000 |
| Dec 27, 2016 | Never finaled issued Dec 2016, no final | 1029 Page St | per pa #201501276826, add address to block 12347, lot 032 to legalization unit as; 1029 page streetDetails
per pa #201501276826, add address to block 12347, lot 032 to legalization unit as; 1029 page street | ||
| Dec 7, 2015 | Never finaled issued Dec 2015, no final | 1029 Page St | street spaceDetails
street space | ||
| Jan 27, 2015 | Completed final sign-off Jun 2016 | 1029 Page St | Spectrum Development Co. | to legalize & improve (e)apartment on ground floor of (e)residence, improved apartment to provide 2 br,2bath,&laundry.modifications incl: fnd replacement & 1' of excavation,elec & plmbg upgrades,hvac,& strctl strengthening.alter include (n)windows & doors in grnd level apt.removal of brick fireplaceDetails
to legalize & improve (e)apartment on ground floor of (e)residence, improved apartment to provide 2 br,2bath,&laundry.modifications incl: fnd replacement & 1' of excavation,elec & plmbg upgrades,hvac,& strctl strengthening.alter include (n)windows & doors in grnd level apt.removal of brick fireplace | $140,000 |
| Jun 29, 2011 | Never finaled issued Jun 2011, no final | 1029 Page St | street spaceDetails
street space | ||
| Mar 3, 2011 | Never finaled issued Mar 2011, no final | 1029 Page St | street space permitDetails
street space permit | ||
| Mar 3, 2011 | Completed final sign-off Oct 2011 | 1029 Page St | need to move laundry area to closet on top (3rd) floor. existing laundry area is going to be unusable during construction in basement. provide hook ups and vents for hallway closet on top floor.Details
need to move laundry area to closet on top (3rd) floor. existing laundry area is going to be unusable during construction in basement. provide hook ups and vents for hallway closet on top floor. | ||
| Dec 2, 2010 | Completed final sign-off Oct 2011 | 1029 Page St | to complete work and obtain final inspection for work approved under pa 200807025845Details
to complete work and obtain final inspection for work approved under pa 200807025845 | $50,000 | |
| Jul 2, 2008 | Completed final sign-off Oct 2011 | 1029 Page St | remove exterior stairs to rear yard and installation of new interior stairs to basement. removal of toilet & sink on 2nd flr utility rm,laundry,shower on 1st flr to accomodate new stairs. partial foundation replacment in rear of building. remove e door/windowsDetails
remove exterior stairs to rear yard and installation of new interior stairs to basement. removal of toilet & sink on 2nd flr utility rm,laundry,shower on 1st flr to accomodate new stairs. partial foundation replacment in rear of building. remove e door/windows | $50,000 | |
| Jun 30, 2006 | Completed final sign-off Oct 2006 | 1029 Page St | we are replacing cabinets, kitchen sink, painting the kitchen, new electrical outlets, lamps, installing a dishwasher and garbage disposal-non structural.Details
we are replacing cabinets, kitchen sink, painting the kitchen, new electrical outlets, lamps, installing a dishwasher and garbage disposal-non structural. | $27,000 | |
| May 18, 2005 | Completed final sign-off Jul 2005 | 1029 Page St | A Supreme Roofing | reroofingDetails
reroofing | $10,000 |
| May 18, 2005 | Expired or cancelled cancelled Nov 2024 | 1029 Page St | A Supreme Roofing | reroofingDetails
reroofing | $10,000 |
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover single-family homes like this one.