Block 1201, lot 041
625 Divisadero St
- City’s use
- Single Family Residential
- Built
- 1907
- Stories
- 1
- Units
- 1
- Rooms
- 1 bedroom, 1 bathroom
- Building
- 413 sq ft
- Zoning
- NC2
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
6 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Apr 18, 2023 | Never finaled filed Apr 2023, never issued | 625 Divisadero St | C & E Electric & Fire Alarm Services | voluntary system replacement & mandatory lf horns upgrade to meet sffc 2022 sec 1103.7.6.1Details
voluntary system replacement & mandatory lf horns upgrade to meet sffc 2022 sec 1103.7.6.1 | $29,800 |
| May 26, 2016 | Completed final sign-off Jun 2016 | 625 Divisadero St | A J O Group Inc | revision to pa 2016-0108-6656 - change shear wall design in back wall & moment frame beam to column connection. soft story retrofit per sfbc chapter 34b engineering criteria - 2012 iebc appendix a4Details
revision to pa 2016-0108-6656 - change shear wall design in back wall & moment frame beam to column connection. soft story retrofit per sfbc chapter 34b engineering criteria - 2012 iebc appendix a4 | |
| May 26, 2016 | Completed final sign-off Jun 2016 | 625 Divisadero St | A J O Group Inc | revision to pa 2016-0114-7107 - commercial/market change shear wall design in back wall & moment frame beam to column connection. soft story retrofit per sfbc chapter 34b engineering criteria - 2012 iebc appendix a4Details
revision to pa 2016-0114-7107 - commercial/market change shear wall design in back wall & moment frame beam to column connection. soft story retrofit per sfbc chapter 34b engineering criteria - 2012 iebc appendix a4 | |
| Apr 22, 2016 | Never finaled issued Apr 2016, no final | 625 Divisadero St | street space - common areaDetails
street space - common area | ||
| Jan 14, 2016 | Completed final sign-off Jun 2016 | 625 Divisadero St | A J O Group Inc | commercial- comply with s.f. wood frame seismic retrofit program(soft story) sfbc chapter 34b, per 2012 iebc appendix a-4. commercial/market.Details
commercial- comply with s.f. wood frame seismic retrofit program(soft story) sfbc chapter 34b, per 2012 iebc appendix a-4. commercial/market. | $32,500 |
| Jan 8, 2016 | Completed final sign-off Jun 2016 | 625 Divisadero St | A J O Group Inc | residential- to comply with s.f. wood frame seismic retrofit program soft story sfbc chapter 34b, per 2012 iebc appendix a-4.Details
residential- to comply with s.f. wood frame seismic retrofit program soft story sfbc chapter 34b, per 2012 iebc appendix a-4. | $65,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- A J O Group Inc (4), C & E Electric & Fire Alarm Services
- Engineers
- Giuseppe Sircana (4)
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.