Block 1186, lot 018
1799 Fulton St
- City’s use
- Multi-Family Residential
- Built
- 1924
- Stories
- 2
- Units
- 2
- Rooms
- 2 bathrooms
- Building
- 2,576 sq ft
- Lot
- 1,400 sq ft
- Zoning
- NC1
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
8 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jun 8, 2026 | In progress issued Jun 2026 | 1799 Fulton St | Flower Design&Build Co | interior tenant improvement of an (e) 1st floor coffee shop tenant space for new coffee shop tenant "cafe barista" (previously starbucks, vacant now). scope to include renovationof service area, equipment and furniture. (e) accessible restrooms to remain. no change to exterior.Details
interior tenant improvement of an (e) 1st floor coffee shop tenant space for new coffee shop tenant "cafe barista" (previously starbucks, vacant now). scope to include renovationof service area, equipment and furniture. (e) accessible restrooms to remain. no change to exterior. | $150,000 |
| Aug 5, 2019 | Expired or cancelled cancelled Jan 2026 | 1799 Fulton St | provide and install new nitrogen infused coffee dispenser// nitrogen in this project is equal to 18 gallons, 6 kegs of 3 gallons each, per cfc table 105.6.11 this does not require an operational permitDetails
provide and install new nitrogen infused coffee dispenser// nitrogen in this project is equal to 18 gallons, 6 kegs of 3 gallons each, per cfc table 105.6.11 this does not require an operational permit | $8,500 | |
| Mar 7, 2013 | Never finaled issued Mar 2013, no final | 1799 Fulton St | Superior Electrical Advertising Inc | install (1) illuminated projecting sign for "starbucks".Details
install (1) illuminated projecting sign for "starbucks". | $3,000 |
| Feb 22, 2013 | Completed final sign-off Mar 2013 | 608 Masonic Av | S F Garage Company Inc. | to comply w/ physical inspection. report # cc-7187.Details
to comply w/ physical inspection. report # cc-7187. | $1,000 |
| Nov 29, 2012 | Never finaled issued Nov 2012, no final | 1799 Fulton St | street spaceDetails
street space | ||
| Oct 2, 2012 | Completed final sign-off Dec 2012 | 1799 Fulton St | Kdc Construction | interior and exterior non structural tenant improvement to existing coffee shop. interior work to include new paritions, finishes, and equipment. exterior work to include replace and add planters and seating.Details
interior and exterior non structural tenant improvement to existing coffee shop. interior work to include new paritions, finishes, and equipment. exterior work to include replace and add planters and seating. | $204,000 |
| Aug 10, 2007 | Never finaled issued Aug 2007, no final | 1799 Fulton St | remodel (e) starbucks retail coffee, replace cabinet, casework and new soffit, minor interior changesDetails
remodel (e) starbucks retail coffee, replace cabinet, casework and new soffit, minor interior changes | $20,000 | |
| Oct 22, 2004 | Completed final sign-off Dec 2004 | 1799 Fulton St | Bel Aire Engineering, Inc | repair canopy / gutters & 8 panels. repaint. no changes in demensions or color.Details
repair canopy / gutters & 8 panels. repaint. no changes in demensions or color. | $3,800 |
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover two-family buildings like this one.