Block 1181, lot 025
1231 Fulton St
- City’s use
- Multi-Family Residential
- Built
- 1906
- Stories
- 3
- Units
- 6
- Rooms
- 12 bedrooms, 6 bathrooms
- Building
- 6,414 sq ft
- Lot
- 5,156 sq ft
- Zoning
- RH3
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
8 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Oct 31, 2023 | In progress issued Nov 2023 | 1231 Fulton St | Magnum Construction Group Inc | upgrade existing fire alarm system to comply with sffc section 1103.7.6.1. add 22 lf sounders. install mini module for fire sprinkler monitoring, 1 flow and tamper. ref sprinkler 202206136192.Details
upgrade existing fire alarm system to comply with sffc section 1103.7.6.1. add 22 lf sounders. install mini module for fire sprinkler monitoring, 1 flow and tamper. ref sprinkler 202206136192. | $20,000 |
| Jun 13, 2022 | Completed final sign-off May 2023 | 1231 Fulton St | Magnum Construction Group Inc | install new fire sprinkler system per nfpa 13 for basement floor adu (2) only including 2" underground fire service. total 26 heads ref pa 2017-0310-1247.Details
install new fire sprinkler system per nfpa 13 for basement floor adu (2) only including 2" underground fire service. total 26 heads ref pa 2017-0310-1247. | $21,000 |
| Jun 12, 2018 | Never finaled filed Jun 2018, never issued | 1231 Fulton St | C T Construction & Plumb | replace stucco front of building dry walls. maher n/a.Details
replace stucco front of building dry walls. maher n/a. | $3,000 |
| Nov 6, 2017 | Never finaled issued Nov 2017, no final | 1231 Fulton St | street spaceDetails
street space | ||
| Mar 10, 2017 | Never finaled issued Sep 2019, no final | 1231 Fulton St | C T Construction & Plumb | basement: convert (e) space to have 2 new accessory dwelling units per add unit ord #162-16. ref# 2017/0228/0267.Details
basement: convert (e) space to have 2 new accessory dwelling units per add unit ord #162-16. ref# 2017/0228/0267. | $80,000 |
| Feb 28, 2017 | Completed final sign-off Apr 2024 | 1231 Fulton St | C T Construction & Plumb | soft story seismic retorfit per sfbc chapter 34b, 2012 iebc appendix a-4. n/a maher ordinanceDetails
soft story seismic retorfit per sfbc chapter 34b, 2012 iebc appendix a-4. n/a maher ordinance | $40,000 |
| Jan 9, 2015 | Never finaled issued Jan 2015, no final | 1231 Fulton St | street spaceDetails
street space | ||
| Sep 22, 2006 | Never finaled issued Sep 2006, no final | 1231 Fulton St | street space & sidewalkDetails
street space & sidewalk |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- C T Construction & Plumb (3), Magnum Construction Group Inc (2)
- Designers
- Jobeen Tsang (2)
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.