Block 1176, lot 007
1618 Fulton St
The city’s assessor roll has no record for this parcel.
Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
9 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jun 18, 2009 | Completed final sign-off Jul 2009 | 1618 Fulton St | Sears Home Improvemt Prod, | replace 9 windows into existing openings. not visable from the street. no structural changes. u factore .67 max.Details
replace 9 windows into existing openings. not visable from the street. no structural changes. u factore .67 max. | $9,407 |
| Mar 9, 2009 | Completed final sign-off Dec 2009 | 1614 Fulton St | Dominguez Roofing | reroofingDetails
reroofing | $6,000 |
| Mar 9, 2009 | Completed final sign-off Mar 2009 | 1614 Fulton St | Dominguez Roofing | remove ashphalt shingles and install 1/2 inch plywood over skip sheating using 8d nails at 10 inch on field and 6 inch on edgeDetails
remove ashphalt shingles and install 1/2 inch plywood over skip sheating using 8d nails at 10 inch on field and 6 inch on edge | $10,000 |
| Aug 20, 2008 | Completed final sign-off Sep 2008 | 1614 Fulton St | Post And Beam | to comply with 3r report #3r-5247 ref. to appl#200806134382Details
to comply with 3r report #3r-5247 ref. to appl#200806134382 | |
| Jun 13, 2008 | Completed final sign-off Jul 2008 | 1614 Fulton St | Post And Beam | remove existing plaster. install 5/8 dry wall type x & fire taping on garage level ceiling.Details
remove existing plaster. install 5/8 dry wall type x & fire taping on garage level ceiling. | $3,500 |
| Apr 7, 2006 | Completed final sign-off May 2006 | 1614 Fulton St | Terry Mc Daniel Construction | remove and replace entry stairs at front of house. upgrade to current code - refer to applic. #2006/02/22/5152Details
remove and replace entry stairs at front of house. upgrade to current code - refer to applic. #2006/02/22/5152 | $12,000 |
| Feb 22, 2006 | Completed final sign-off Apr 2006 | 1614 Fulton St | Terry Mc Daniel Construction | an area of approx 15x2 of pitched roof to be resheathed and reroofed. comply with nov 200667261. exploratory permit to accertaoin scope of work for stairsDetails
an area of approx 15x2 of pitched roof to be resheathed and reroofed. comply with nov 200667261. exploratory permit to accertaoin scope of work for stairs | $1,500 |
| Jun 30, 2005 | Never finaled issued Jun 2005, no final | 1614 Fulton St | street space permitDetails
street space permit | ||
| Jan 20, 2005 | Completed final sign-off Apr 2006 | 1614 Fulton St | interior remodel of (e) kitchens (2), bath (3). new door at bedroom.new near door of stair (e) newDetails
interior remodel of (e) kitchens (2), bath (3). new door at bedroom.new near door of stair (e) new | $38,500 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Dominguez Roofing (2), Post And Beam (2), Terry Mc Daniel Construction (2), Sears Home Improvemt Prod,
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.