Block 1169, lot 001
369 Stanyan St
- City’s use
- Multi-Family Residential
- Built
- 1954
- Stories
- 2
- Units
- 8
- Rooms
- 8 bathrooms
- Building
- 2,704 sq ft
- Lot
- 3,275 sq ft
- Zoning
- RH3
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
10 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 29, 2022 | Completed final sign-off Sep 2022 | 369 Stanyan St | Occidental Express | to obtain final inspection for work approved under permit 201608296247. all work is complete.Details
to obtain final inspection for work approved under permit 201608296247. all work is complete. | |
| Jun 2, 2017 | Never finaled issued Jun 2017, no final | 369 Stanyan St | street space & sidewalk repairDetails
street space & sidewalk repair | ||
| Aug 29, 2016 | Never finaled issued Dec 2016, no final | 369 Stanyan St | Aidan Mc Cracken Const Inc. | soft story compliance retrofit per sfbc chap 34b at basement level only; 2012 iebc appendix a-4Details
soft story compliance retrofit per sfbc chap 34b at basement level only; 2012 iebc appendix a-4 | $50,000 |
| Aug 22, 2011 | Completed final sign-off Dec 2011 | 369 Stanyan St | Blue Fox Construction | replace (16) wood windows in kinds, (8) 6x4 sliders, and (8) 4x3 with fiberglass sliders. u -factor is 0.40. no structural work, replace in kind.Details
replace (16) wood windows in kinds, (8) 6x4 sliders, and (8) 4x3 with fiberglass sliders. u -factor is 0.40. no structural work, replace in kind. | $5,000 |
| Nov 15, 2010 | Completed final sign-off Dec 2010 | 369 Stanyan St | Jun Meng Li | unit #1: remove old floor tile and wall bathroom tile and replace, not adding or moving a wall no structural work, no new lightingDetails
unit #1: remove old floor tile and wall bathroom tile and replace, not adding or moving a wall no structural work, no new lighting | $3,700 |
| Jan 29, 2010 | Completed final sign-off Mar 2010 | 369 Stanyan St | Jun Meng Li | unit #2-remove floor and shower tile & replace tile and tub only, no other work.Details
unit #2-remove floor and shower tile & replace tile and tub only, no other work. | $3,000 |
| Aug 17, 2009 | Completed final sign-off Sep 2009 | 369 Stanyan St | Gomez Iron Works | replace wood utility ladder to roof with metal ladderDetails
replace wood utility ladder to roof with metal ladder | $500 |
| Jan 14, 2009 | Completed final sign-off Feb 2009 | 369 Stanyan St | unit #6: replace floor tile and bathtub floor tile and tile around the tubDetails
unit #6: replace floor tile and bathtub floor tile and tile around the tub | $3,000 | |
| May 12, 2008 | Completed final sign-off Jun 2008 | 369 Stanyan St | apt 5 - replace old bathtub and cracked tile floor.Details
apt 5 - replace old bathtub and cracked tile floor. | $3,500 | |
| Sep 2, 2003 | Expired or cancelled expired Oct 2004 | 369 Stanyan St | replace or repair 2 posts with dryrotDetails
replace or repair 2 posts with dryrot | $100 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Jun Meng Li (2), Aidan Mc Cracken Const Inc., Blue Fox Construction, Gomez Iron Works, Occidental Express
- Engineers
- Tim O'sullivan
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.