Block 1158, lot 003
747 Baker St
- City’s use
- Multi-Family Residential
- Built
- 1904
- Stories
- 3
- Units
- 3
- Rooms
- 3 bathrooms
- Building
- 5,530 sq ft
- Lot
- 2,422 sq ft
- Zoning
- RH3
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
8 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 13, 2023 | Completed final sign-off Dec 2023 | 747 Baker St | San Miguel Construction | replace existing kitchen cabinets, stove, add dishwasher, hood, new sink faucet, minor electrical to provided min legal elec circuits. replace (e) kitchen, lights with new hi efficiency lights, minor plumbing to atach new sink, drain & dw.Details
replace existing kitchen cabinets, stove, add dishwasher, hood, new sink faucet, minor electrical to provided min legal elec circuits. replace (e) kitchen, lights with new hi efficiency lights, minor plumbing to atach new sink, drain & dw. | $20,000 |
| Mar 9, 2017 | Completed final sign-off Jul 2017 | 747 Baker St | Calsystem Restoration Services Inc | repair and replace 280 sf. exterior framing, siding, and one window at the rear. not visible from the public view. u factor or better 0.32. remove one door to install new flashing and reinstall back.Details
repair and replace 280 sf. exterior framing, siding, and one window at the rear. not visible from the public view. u factor or better 0.32. remove one door to install new flashing and reinstall back. | $20,000 |
| Jan 26, 2017 | Completed final sign-off Jul 2017 | 747 Baker St | Roofing Logistics | remove existing shingles. install certainteed landmard shingles. install 60 mill tpo gray.Details
remove existing shingles. install certainteed landmard shingles. install 60 mill tpo gray. | $18,200 |
| Mar 11, 2013 | Completed final sign-off Feb 2014 | 743 Baker St | Bachelder And Associates | repair dry rot on rear decks & stairways - less thatn 50% replacement. (exist. deck approx 6'x 12" - 0" footprint)Details
repair dry rot on rear decks & stairways - less thatn 50% replacement. (exist. deck approx 6'x 12" - 0" footprint) | $7,500 |
| Nov 15, 2011 | Completed final sign-off Jan 2012 | 745 Baker St | J G Construction Partnership | 200 linear feet. siding light well area. not visible from street.Details
200 linear feet. siding light well area. not visible from street. | $1,000 |
| Jul 22, 2011 | Completed final sign-off Sep 2011 | 745 Baker St | J G Construction Partnership | revision to application 201107150361. 1-(n) window installation to restroom @ side & new 1/2" sheetrock to hallway, area of 1,000 sq.ft.Details
revision to application 201107150361. 1-(n) window installation to restroom @ side & new 1/2" sheetrock to hallway, area of 1,000 sq.ft. | $3,000 |
| Jul 15, 2011 | Completed final sign-off Sep 2011 | 743 Baker St | J G Construction Partnership | install 49 ft (sq ft of floor tile to the restroom. install 90 sq ft of new wall tile. remove 200 sq ft of sheet rock to bathroom ceiling & west and north wall. only on 745 baker street unit. 1 restroom remodel, all work in one bathroom. new lighting to be comply with cec 150(k). no change toDetails
install 49 ft (sq ft of floor tile to the restroom. install 90 sq ft of new wall tile. remove 200 sq ft of sheet rock to bathroom ceiling & west and north wall. only on 745 baker street unit. 1 restroom remodel, all work in one bathroom. new lighting to be comply with cec 150(k). no change to | $2,000 |
| Dec 19, 2008 | Completed final sign-off Feb 2009 | 743 Baker St | Kelton Construction | upgrade basement center beam support system with new concrete footings and replacement of one beam. extg post locations to remainDetails
upgrade basement center beam support system with new concrete footings and replacement of one beam. extg post locations to remain | $15,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- J G Construction Partnership (3), Bachelder And Associates, Calsystem Restoration Services Inc, Kelton Construction, Roofing Logistics, San Miguel Construction
- Architects
- Timothy Rempel
- Engineers
- Shaun Moynahan