Block 1154, lot 006C
1616 Golden Gate Ave
- City’s use
- Multi-Family Residential
- Built
- 1927
- Stories
- 3
- Units
- 12
- Rooms
- 12 bathrooms
- Building
- 11,124 sq ft
- Lot
- 6,246 sq ft
- Zoning
- RM1
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
10 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Feb 10, 2023 | Completed final sign-off Mar 2023 | 1616 Golden Gate Av | Poly-On Security System Inc. | upgrade the (e) fire alarm system with (1)addressible fire alarm unit, (1)wireless communicator next to facu, (4)addressibel manual pull station, (8)addressible smoke det, (4)horn strobes, (24)low frequency horns at all residential sleeping areas to comply with sfcc sec 1103.7.6.1Details
upgrade the (e) fire alarm system with (1)addressible fire alarm unit, (1)wireless communicator next to facu, (4)addressibel manual pull station, (8)addressible smoke det, (4)horn strobes, (24)low frequency horns at all residential sleeping areas to comply with sfcc sec 1103.7.6.1 | $21,000 |
| Jan 24, 2018 | Never finaled issued Jan 2018, no final | 1616 Golden Gate Av | street spaceDetails
street space | ||
| Dec 1, 2017 | Completed final sign-off Dec 2018 | 1616 Golden Gate Av | Beale Builders & Construction | revision to pa 2017-0908-7403 adjustment to engineered drawings to provide adequate shear wallDetails
revision to pa 2017-0908-7403 adjustment to engineered drawings to provide adequate shear wall | $4,500 |
| Sep 8, 2017 | Completed final sign-off Nov 2018 | 1616 Golden Gate Av | Beale Builders & Construction | soft story compliance to wood frames bldg retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4. n/a maher ordinanceDetails
soft story compliance to wood frames bldg retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4. n/a maher ordinance | $100,000 |
| Sep 17, 2012 | Completed final sign-off Nov 2012 | 1616 Golden Gate Av | obtain final inspection for work approved under pa# 2010-0423-0942. all work completeDetails
obtain final inspection for work approved under pa# 2010-0423-0942. all work complete | ||
| Apr 23, 2010 | Completed final sign-off Nov 2012 | 1616 Golden Gate Av | partial lateral load bracing of garage 1st. flr. level plywd. shearwalls, bolting of perimeter & interior bearing walls w/ 5/8" dia. threaded bars set in epoxy w/ 32"o.c. construction of reinforce concrete grade beams across st. wall door openings & across driveways.Details
partial lateral load bracing of garage 1st. flr. level plywd. shearwalls, bolting of perimeter & interior bearing walls w/ 5/8" dia. threaded bars set in epoxy w/ 32"o.c. construction of reinforce concrete grade beams across st. wall door openings & across driveways. | $40,000 | |
| Jun 30, 2009 | Completed final sign-off Oct 2009 | 1616 Golden Gate Av | Eagle Ridge Construction And Roofing, Pankow Special Projects Lp | comply with nov 200907521, replace treads & 1 stringer at staircase less than 50%. repair windows sash cords, provide smoke enclosures door closess. item # 1,2,4,5,6,7,8, # 3 under separate permit.repair fire escape drop ladder to working order. repair fire proofing, remove fire escape obstruction.Details
comply with nov 200907521, replace treads & 1 stringer at staircase less than 50%. repair windows sash cords, provide smoke enclosures door closess. item # 1,2,4,5,6,7,8, # 3 under separate permit.repair fire escape drop ladder to working order. repair fire proofing, remove fire escape obstruction. | $8,000 |
| Mar 4, 2008 | Never finaled issued Mar 2008, no final | 1616 Golden Gate Av | California Constrution Co | reroofingDetails
reroofing | $16,875 |
| Oct 23, 2007 | Expired or cancelled expired Aug 2009 | 1616 Golden Gate Av | Cardona Construction | work on unit#5. kitchen upgrade cabinets , sink, countertop, flooring. bathroom upgrade tub tile flooring and minor drywall repair. no structural work.Details
work on unit#5. kitchen upgrade cabinets , sink, countertop, flooring. bathroom upgrade tub tile flooring and minor drywall repair. no structural work. | $14,000 |
| May 30, 2007 | Completed final sign-off Aug 2007 | 1616 Golden Gate Av | Cardona Construction | upgrade kitchen with new cabinets&counters in apt #1,7,10,11,12. at least 50% lighting wattage must be fluorescent. bathroom upgrade-new fixtures, new tile, minor repairs, fluorescent or controlled by motion sensor (lighting).Details
upgrade kitchen with new cabinets&counters in apt #1,7,10,11,12. at least 50% lighting wattage must be fluorescent. bathroom upgrade-new fixtures, new tile, minor repairs, fluorescent or controlled by motion sensor (lighting). | $50,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Beale Builders & Construction (2), Cardona Construction (2), California Constrution Co, Eagle Ridge Construction And Roofing, Pankow Special Projects Lp, Poly-On Security System Inc.
- Engineers
- Timothy M. O'sullivan
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.