Block 1152, lot 058
1995 Turk St
- City’s use
- Single Family Residential
- Built
- 1927
- Rooms
- 1 bathroom
- Building
- 1,050 sq ft
- Zoning
- NA
- Construction type
- NA
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
5 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Oct 12, 2017 | Completed final sign-off Jan 2018 | 1995 Turk St | in kind replacement of wood roof deck. new steel guardrail. n/a maherDetails
in kind replacement of wood roof deck. new steel guardrail. n/a maher | $8,500 | |
| Feb 11, 2015 | Never finaled issued Feb 2015, no final | 1995 Turk St | Schmitt Heating Co Inc | #3: replace existing flexible ductwork in attic with new flexibe ducting. seismic support in attic. replace existing furnace with new in mechanical closet above rear stairs.Details
#3: replace existing flexible ductwork in attic with new flexibe ducting. seismic support in attic. replace existing furnace with new in mechanical closet above rear stairs. | $7,620 |
| Jun 13, 2014 | Expired or cancelled withdrawn Jul 2017 | 1995 Turk St | work @ unit# 3. demo (e) bedroom. (n) structure, roof, windows, floor for proposed (n) master bedroom suite. (n) electrical & plumbing required. repair (e) deck & roofing where (e) structure is demolished. (e) stair to remain, (e) wall @ stair to be rebuilt to accommodate (e) structure. maher - n/a.Details
work @ unit# 3. demo (e) bedroom. (n) structure, roof, windows, floor for proposed (n) master bedroom suite. (n) electrical & plumbing required. repair (e) deck & roofing where (e) structure is demolished. (e) stair to remain, (e) wall @ stair to be rebuilt to accommodate (e) structure. maher - n/a. | $40,000 | |
| Feb 27, 2013 | Never finaled issued May 2013, no final | 1995 Turk St | convert sunroom to bedroom on roof which is the second level of unit #3. no work to be done.Details
convert sunroom to bedroom on roof which is the second level of unit #3. no work to be done. | ||
| May 15, 2012 | Completed final sign-off May 2012 | 1995 Turk St | Occidental Express | unit #3-relocating entry door (interior) to unitDetails
unit #3-relocating entry door (interior) to unit | $2,500 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Occidental Express, Schmitt Heating Co Inc
- Architects
- Darshan Amrit
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.