Block 1150, lot 024
924 Central Av
The city’s assessor roll has no record for this parcel.
Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
9 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 7, 2012 | Never finaled issued Sep 2012, no final | 924 Central Av | street spaceDetails
street space | ||
| Jun 22, 2012 | Completed final sign-off Oct 2012 | 924 Central Av | vaulted roof by raising ceiling joist at rear of building. window infill and 1st fl infill for shear wall. add foundation for shear wall.Details
vaulted roof by raising ceiling joist at rear of building. window infill and 1st fl infill for shear wall. add foundation for shear wall. | $12,800 | |
| Feb 29, 2012 | Completed final sign-off Jun 2012 | 926 Central Av | 2 new baths. build 1 new wet wall with 2 new sinks, 2 showers, 2 toilets, 2 vanities. window replacement in-kind.Details
2 new baths. build 1 new wet wall with 2 new sinks, 2 showers, 2 toilets, 2 vanities. window replacement in-kind. | $17,500 | |
| May 27, 2011 | Completed final sign-off Mar 2012 | 926 Central Av | shore up foundation under rear section of the house. window infill and tie downsDetails
shore up foundation under rear section of the house. window infill and tie downs | $5,700 | |
| Nov 1, 2010 | Completed final sign-off Nov 2010 | 926 Central Av | to comply with physical inspection report #cc-5834.Details
to comply with physical inspection report #cc-5834. | $4,700 | |
| Jan 30, 2008 | Completed final sign-off Jun 2008 | 924 Central Av | Cas Construction | work only on #926 central ave .above the garage, the floor joist are supported on wood transvere beams. the wood beams are being replaced with steel beams and new support columns and footings. seismic upgrade to the garage level onlyDetails
work only on #926 central ave .above the garage, the floor joist are supported on wood transvere beams. the wood beams are being replaced with steel beams and new support columns and footings. seismic upgrade to the garage level only | $6,500 |
| Dec 11, 2007 | Expired or cancelled cancelled Jan 2026 | 924 Central Av | install steel support beams & footings in the garage to replace existing wood beams. anchor bolt foundation, install plywood (1/2") shearwall.Details
install steel support beams & footings in the garage to replace existing wood beams. anchor bolt foundation, install plywood (1/2") shearwall. | $4,000 | |
| Sep 6, 2007 | Never finaled issued Oct 2007, no final | 924 Central Av | administrative permit only. to show unit count as a two (2) units building.Details
administrative permit only. to show unit count as a two (2) units building. | ||
| Jun 22, 2007 | Never finaled issued Jun 2007, no final | 924 Central Av | Maap Corp Dba Save Energy Co | replacement of windows to front of building. 8 windows first & second floor.Details
replacement of windows to front of building. 8 windows first & second floor. | $5,750 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Cas Construction, Maap Corp Dba Save Energy Co
- Engineers
- Antoine Samra (2)
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.