Block 1002, lot 046
2238 Divisadero St
- City’s use
- Single Family Residential
- Built
- 1900
- Stories
- 2
- Units
- 1
- Rooms
- 3 bedrooms, 2 bathrooms
- Building
- 1,770 sq ft
- Lot
- 2,750 sq ft
- Zoning
- RH2
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
7 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jan 7, 2026 | In progress filed Jan 2026, not yet issued | 2238 Divisadero St | add new elevator serving 3 levels, with shaft add 35 sqft. shaft at 1st floor (unconditioned). remove existing side stairsDetails
add new elevator serving 3 levels, with shaft add 35 sqft. shaft at 1st floor (unconditioned). remove existing side stairs | $50,000 | |
| Jul 11, 2016 | Completed final sign-off Oct 2016 | 2238 Divisadero St | Caffrey Landscapes | in kind replacement of exit stair, wood deck less than 3' above gradeDetails
in kind replacement of exit stair, wood deck less than 3' above grade | $2,500 |
| Sep 15, 2014 | Completed final sign-off Sep 2014 | 2238 Divisadero St | American Roofing Co **Pls See 432216*** | reroofingDetails
reroofing | $17,500 |
| Aug 27, 2014 | Completed final sign-off Jan 2015 | 2238 Divisadero St | Hawke Construction | revision to app no. 201406138293; revise front bay material to painted cedar siding; simplified stucco trim pattern on other elevations; change structural support of roof eave overhang per plan.Details
revision to app no. 201406138293; revise front bay material to painted cedar siding; simplified stucco trim pattern on other elevations; change structural support of roof eave overhang per plan. | |
| Jun 13, 2014 | Completed final sign-off Jan 2015 | 2238 Divisadero St | Hawke Construction | replace front facade from aluminum siding to stucco and cemebtitious board and batten panels per plan. replace front asphalt single roof to metal roof. replace south wall from wood siding to stucco finish per plan. replace front windows, garage door and gate. retile the frontDetails
replace front facade from aluminum siding to stucco and cemebtitious board and batten panels per plan. replace front asphalt single roof to metal roof. replace south wall from wood siding to stucco finish per plan. replace front windows, garage door and gate. retile the front | $130,000 |
| Apr 16, 2013 | Completed final sign-off Jun 2013 | 2238 Divisadero St | A B C Window Contractors | install 3 vinyl windows in kind into existing frames, no change in size or location. windows do not face the street, windows will comply with section cbc1026 for rescue. all windows will be double pane and have a u-factor of .30Details
install 3 vinyl windows in kind into existing frames, no change in size or location. windows do not face the street, windows will comply with section cbc1026 for rescue. all windows will be double pane and have a u-factor of .30 | $1,300 |
| Nov 16, 2007 | Completed final sign-off Mar 2008 | 2238 Divisadero St | G M M Construction Co | replalce cabinets & countertop in kitchen. (e) lighting to remain. no structural. no plumbing, no electrical, appliances, same location.Details
replalce cabinets & countertop in kitchen. (e) lighting to remain. no structural. no plumbing, no electrical, appliances, same location. | $8,170 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Hawke Construction (2), A B C Window Contractors, American Roofing Co **Pls See 432216***, Caffrey Landscapes, G M M Construction Co
- Architects
- Shervin Tajbaksh (2), Pete Retondo, Troy Kashanipour