Block 0979, lot 031
2707 Jackson St
The city’s assessor roll has no record for this parcel.
Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
10 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 13, 2013 | Completed final sign-off Oct 2013 | 2707 Jackson St | to comply with physical inspection report #cc7278Details
to comply with physical inspection report #cc7278 | $2,500 | |
| Oct 18, 2012 | Completed final sign-off Feb 2013 | 2707 Jackson St | Bay Area Window Pros/Quality Constru | #4- replace 6 windows, wood to wood-clad, like for like in style and size, windows not visable from street.Details
#4- replace 6 windows, wood to wood-clad, like for like in style and size, windows not visable from street. | $12,200 |
| May 16, 2008 | Never finaled issued May 2008, no final | 2707 Jackson St | street space permit only.Details
street space permit only. | ||
| Feb 8, 2008 | Never finaled issued Feb 2008, no final | 2707 Jackson St | street space permitDetails
street space permit | ||
| Dec 7, 2007 | Completed final sign-off Dec 2008 | 2707 Jackson St | replace existing rear egress stair & fourth floor walkway in kind.Details
replace existing rear egress stair & fourth floor walkway in kind. | $35,000 | |
| Aug 29, 2007 | Completed final sign-off Aug 2008 | 2707 Jackson St | interior remodel@ 3rd, 4th floor to include new bedroom @3rd floor, convert 4th floor bedroom to dining area, add bathroom @4th fl. , install 4 (four) new skylights,install 2 (two) new fireplacesDetails
interior remodel@ 3rd, 4th floor to include new bedroom @3rd floor, convert 4th floor bedroom to dining area, add bathroom @4th fl. , install 4 (four) new skylights,install 2 (two) new fireplaces | $150,000 | |
| Jun 3, 2005 | Completed final sign-off Dec 2005 | 2707 Jackson St | new windows,door & local shearwall@ (e)lower level rear wall of g/f.new rear stair from g/f to rearDetails
new windows,door & local shearwall@ (e)lower level rear wall of g/f.new rear stair from g/f to rear | $8,000 | |
| Apr 20, 2005 | Completed final sign-off Jan 2006 | 2707 Jackson St | interior remodel of unit # 1 (ground floor unit) with no structural work.Details
interior remodel of unit # 1 (ground floor unit) with no structural work. | $20,000 | |
| Jan 5, 2005 | Completed final sign-off Feb 2005 | 2707 Jackson St | Mike Cahalan | install new cabinets in kitchen, install sink & medicine cabinet & toilet in bathroomDetails
install new cabinets in kitchen, install sink & medicine cabinet & toilet in bathroom | $11,500 |
| Nov 12, 2003 | Completed final sign-off Feb 2005 | 2707 Jackson St | Westco Roofing Co. Inc. | reroofingDetails
reroofing | $9,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Bay Area Window Pros/Quality Constru, Mike Cahalan, Westco Roofing Co. Inc.
- Architects
- Steven Whitney (3), Calvin Hom
- Engineers
- Rogrigo Santos
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.