Block 0931, lot 034
2429 Francisco St
- City’s use
- Single Family Residential
- Built
- 1926
- Stories
- 2
- Units
- 1
- Rooms
- 3 bedrooms, 2 bathrooms
- Building
- 2,282 sq ft
- Lot
- 2,731 sq ft
- Zoning
- RH3
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
7 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Feb 24, 2015 | Completed final sign-off Jul 2015 | 2429 Francisco St | to obtain final inspection for work approved uner pa # 201312134122. all work is complete. n/a maher ordinance 155.13Details
to obtain final inspection for work approved uner pa # 201312134122. all work is complete. n/a maher ordinance 155.13 | $6,000 | |
| Jul 7, 2014 | Completed final sign-off Jul 2015 | 2429 Francisco St | repair landing on sairwell & replace post.Details
repair landing on sairwell & replace post. | $250 | |
| Jul 7, 2014 | Completed final sign-off Jul 2015 | 2429 Francisco St | replace windows in rear bedrooms (2), in bathroom (2), in stairwell (2), in master closet (1) - 7 windows total; not visible from street.Details
replace windows in rear bedrooms (2), in bathroom (2), in stairwell (2), in master closet (1) - 7 windows total; not visible from street. | $3,500 | |
| Jan 30, 2014 | Completed final sign-off Feb 2015 | 2429 Francisco St | Schmitt Heating Co Inc | replace existing ductwork in garage with all new 26 gauge steel ducting per cbc 406.1. replace existing furnace with new in same location (under separate permit). compliance of maher ordinance # 155-13 is not required.Details
replace existing ductwork in garage with all new 26 gauge steel ducting per cbc 406.1. replace existing furnace with new in same location (under separate permit). compliance of maher ordinance # 155-13 is not required. | $9,520 |
| Dec 13, 2013 | Expired or cancelled expired Jul 2015 | 2429 Francisco St | street-facing - 2nd fl: replace all 5 windows with wood clad. street-facing - 3rd fl: replace window/door with mahagony french doors. replace 2 master bedroom windows each with its own double door. street-facing - 3rd fl: replace 1 window with wood clad. u-factor shall be 0.4 or lessDetails
street-facing - 2nd fl: replace all 5 windows with wood clad. street-facing - 3rd fl: replace window/door with mahagony french doors. replace 2 master bedroom windows each with its own double door. street-facing - 3rd fl: replace 1 window with wood clad. u-factor shall be 0.4 or less | $6,000 | |
| Aug 14, 2013 | Never finaled issued Aug 2013, no final | 2429 Francisco St | Hawk N Lee Co | interior remodeling g/f: remodel existing bathroom. 2/f: remodel kitchen and bathroom. 3/f: remodel master bathroom, add roof deck. legalize g/f family room & bathroomDetails
interior remodeling g/f: remodel existing bathroom. 2/f: remodel kitchen and bathroom. 3/f: remodel master bathroom, add roof deck. legalize g/f family room & bathroom | $50,000 |
| Mar 7, 2013 | Never finaled issued Mar 2013, no final | 2429 Francisco St | street spaceDetails
street space |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Hawk N Lee Co, Schmitt Heating Co Inc
- Engineers
- Hawk Lee
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover single-family homes like this one.