Block 0911, lot 032
1920 Jefferson St
- City’s use
- Single Family Residential
- Built
- 1928
- Units
- 1
- Rooms
- 1 bedroom, 1 bathroom
- Building
- 769 sq ft
- Zoning
- RM3
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
6 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Mar 20, 2018 | Never finaled issued Mar 2018, no final | 1920 Jefferson St | Jemico Llc Dba Renewal By Andersen Of Sf | replacing (6) windows not visible from the st, bedroom emergency rescue windows to maintain replacing with fibrex wood clad material, no chnage in size or location u factor 0.32 maxDetails
replacing (6) windows not visible from the st, bedroom emergency rescue windows to maintain replacing with fibrex wood clad material, no chnage in size or location u factor 0.32 max | $15,536 |
| Oct 30, 2017 | Completed final sign-off Dec 2017 | 1920 Jefferson St | Excelsior Roofing Company | common area- reroofing, na maherDetails
common area- reroofing, na maher | $15,000 |
| Jul 24, 2017 | Completed final sign-off Sep 2017 | 1920 Jefferson St | replaced rotted wood on front of building. replace in kind with stucco.Details
replaced rotted wood on front of building. replace in kind with stucco. | $9,000 | |
| May 10, 2017 | Completed final sign-off Sep 2017 | 1920 Jefferson St | Nieto Valle Construction | revision to 201601157276 double the thickness of one shear wall to accomodate utilitiesDetails
revision to 201601157276 double the thickness of one shear wall to accomodate utilities | |
| Jan 15, 2016 | Completed final sign-off Sep 2017 | 1920 Jefferson St | soft story retrofit per sfbc chapter 34b engineering criteria: 2012 iebc appendix a-4. maher naDetails
soft story retrofit per sfbc chapter 34b engineering criteria: 2012 iebc appendix a-4. maher na | $20,000 | |
| May 24, 2010 | Completed final sign-off Jul 2010 | 1920 Jefferson St | Igor Kurikov | 2nd fl. kitchen and bathrm remodelling, opening non-load bearing wall btn kitch. and living rm. closing hallway/closet dr way, new appliances, fixtures and faucets, new econ.toilet. new vanity, drop clg in bathrm w/ recess lights, exh.fan, new cabsDetails
2nd fl. kitchen and bathrm remodelling, opening non-load bearing wall btn kitch. and living rm. closing hallway/closet dr way, new appliances, fixtures and faucets, new econ.toilet. new vanity, drop clg in bathrm w/ recess lights, exh.fan, new cabs | $50,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Excelsior Roofing Company, Igor Kurikov, Jemico Llc Dba Renewal By Andersen Of Sf, Nieto Valle Construction
- Engineers
- Dennis Fagent (2)
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.