Block 0856, lot 013
126 Laguna St
- City’s use
- Multi-Family Residential
- Built
- 1900
- Stories
- 4
- Units
- 7
- Rooms
- 19 bedrooms, 9 bathrooms
- Building
- 9,331 sq ft
- Lot
- 3,419 sq ft
- Zoning
- RH3
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
30 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 31, 2022 | Completed final sign-off Feb 2023 | 126 Laguna St | fill-in 2 (e) p|l windows (2.5x5') at north p|l of (e) 1/f flat, not visible from street. fill in with (n) 1hr fire rated wall assembly. (e) windows to remain. no exterior envelope changes.Details
fill-in 2 (e) p|l windows (2.5x5') at north p|l of (e) 1/f flat, not visible from street. fill in with (n) 1hr fire rated wall assembly. (e) windows to remain. no exterior envelope changes. | $500 | |
| Jun 1, 2022 | Never finaled issued Jun 2022, no final | 126 Laguna St | remodel (e) kitchen (184 sf) & (e) bathroom (64 sf), add (n) bathroom (50 sf) & renew interior finishes of (e) 1st fl flat (126 laguna); no exterior envelope changesDetails
remodel (e) kitchen (184 sf) & (e) bathroom (64 sf), add (n) bathroom (50 sf) & renew interior finishes of (e) 1st fl flat (126 laguna); no exterior envelope changes | $120,000 | |
| Nov 29, 2021 | Completed final sign-off Dec 2021 | 126 Laguna St | Superior Plumbing & Fire Protection | voluntary fire sprinklers system addition; extend the (e) system from basement to 1st/2nd/3rd floors. connect to (e) basement system, design per nfpa13 (total 112 sprinkler). ref pa201806071207.Details
voluntary fire sprinklers system addition; extend the (e) system from basement to 1st/2nd/3rd floors. connect to (e) basement system, design per nfpa13 (total 112 sprinkler). ref pa201806071207. | $61,152 |
| Aug 31, 2020 | Completed final sign-off Dec 2020 | 124 Laguna St | Au Electric Corporation/Aec Alarms | upgrade the extg fire alarm system to comply with sffd 1103.7.6.1 and nfpa 72Details
upgrade the extg fire alarm system to comply with sffd 1103.7.6.1 and nfpa 72 | $20,000 |
| Oct 4, 2019 | Completed final sign-off Oct 2019 | 124 Laguna St | to comply with nov 201969422. repair less than 50% or rear stairs, item #10. relocate gutter, item #11Details
to comply with nov 201969422. repair less than 50% or rear stairs, item #10. relocate gutter, item #11 | $750 | |
| Jun 3, 2019 | Never finaled issued Jun 2019, no final | 126 Laguna St | street space w/mtaDetails
street space w/mta | ||
| Apr 9, 2019 | Never finaled issued Apr 2019, no final | 126 Laguna St | Bay Alarm Company | installation of sprinkler monitoring system and low freq sounders in sleeping area for only 2 new units 201512235842, 201805071207. full fire alarm system to be under separate permit.Details
installation of sprinkler monitoring system and low freq sounders in sleeping area for only 2 new units 201512235842, 201805071207. full fire alarm system to be under separate permit. | $3,900 |
| Apr 5, 2019 | Never finaled issued Apr 2019, no final | 130 Laguna St | street spaceDetails
street space | ||
| Mar 18, 2019 | Never finaled issued Mar 2019, no final | 126 Laguna St | sidewalk repair.Details
sidewalk repair. | ||
| Feb 25, 2019 | Never finaled issued Feb 2019, no final | 126 Laguna St | street spaceDetails
street space | ||
| Jan 23, 2019 | Never finaled issued Jan 2019, no final | 126 Laguna St | street spaceDetails
street space | ||
| Nov 30, 2018 | Never finaled issued Nov 2018, no final | 126 Laguna St | street spaceDetails
street space | ||
| Oct 16, 2018 | Never finaled issued Oct 2018, no final | 126 Laguna St | street spaceDetails
street space | ||
| Aug 20, 2018 | Completed final sign-off May 2019 | 126 Laguna St | soft story retrofit. addition of dwelling unit under permit 20151235842Details
soft story retrofit. addition of dwelling unit under permit 20151235842 | ||
| Jul 27, 2018 | Never finaled issued Jul 2018, no final | 126 Laguna St | street spaceDetails
street space | ||
| Jul 3, 2018 | Never finaled issued Jul 2018, no final | 124 Laguna St | per pa #201512235842, add address to two adu at block 0856, lot 013 as; 124 laguna streetDetails
per pa #201512235842, add address to two adu at block 0856, lot 013 as; 124 laguna street | ||
| Jun 12, 2018 | Never finaled issued Jun 2018, no final | 126 Laguna St | street spaceDetails
street space | ||
| Jun 7, 2018 | Never finaled issued Jul 2018, no final | 126 Laguna St | Superior Plumbing & Fire Protection | install new fire sprinklers at 2 new units. legalizing throughout including 2" under ground fire service (total 24)Details
install new fire sprinklers at 2 new units. legalizing throughout including 2" under ground fire service (total 24) | $6,144 |
| Apr 17, 2018 | Expired or cancelled withdrawn May 2019 | 126 Laguna St | revision to pa 2015-1223-5842 consisting of the reconstruction of a portion of the existing rear yard stairs and a change in the elevation of the rear yard gradeDetails
revision to pa 2015-1223-5842 consisting of the reconstruction of a portion of the existing rear yard stairs and a change in the elevation of the rear yard grade | ||
| Mar 30, 2018 | Never finaled issued Apr 2018, no final | 126 Laguna St | street spaceDetails
street space | ||
| Jan 16, 2018 | Never finaled issued Jan 2018, no final | 126 Laguna St | street spaceDetails
street space | ||
| Nov 7, 2017 | Never finaled issued Nov 2017, no final | 126 Laguna St | street spaceDetails
street space | ||
| Aug 25, 2017 | Never finaled issued Aug 2017, no final | 126 Laguna St | street spaceDetails
street space | ||
| Jun 9, 2017 | Never finaled issued Jun 2017, no final | 126 Laguna St | street spaceDetails
street space | ||
| Mar 31, 2017 | Never finaled issued Mar 2017, no final | 126 Laguna St | street spaceDetails
street space | ||
| Oct 12, 2016 | Never finaled issued Oct 2016, no final | 126 Laguna St | street space permitDetails
street space permit | ||
| Dec 23, 2015 | Completed final sign-off Jul 2019 | 126 Laguna St | Alward Const. Co Inc A Ca Corp, Add A Garage Inc. | add 2 dwelling units to(e) 5 units multifamily building.the units will be located within(e)bsmt thereby not expanding the overall depth or width of (e) building.no work is proposed on the 1st,2nd&3rd fls.a small expansion to bsmt level envelope only which const filling in recess bet bay windows.Details
add 2 dwelling units to(e) 5 units multifamily building.the units will be located within(e)bsmt thereby not expanding the overall depth or width of (e) building.no work is proposed on the 1st,2nd&3rd fls.a small expansion to bsmt level envelope only which const filling in recess bet bay windows. | $600,000 |
| May 13, 2009 | Never finaled issued May 2009, no final | 126 Laguna St | street space & sidewalk repair.Details
street space & sidewalk repair. | ||
| Mar 20, 2008 | Completed final sign-off Jun 2008 | 126 Laguna St | Scott Barlow Gen Cont. | repair floor, stairs @ rear of building unit 128a + common stair less than 50% repair in kind. patch ceiling in basement. no change in window or doorsDetails
repair floor, stairs @ rear of building unit 128a + common stair less than 50% repair in kind. patch ceiling in basement. no change in window or doors | $1,200 |
| Apr 12, 2002 | Completed final sign-off Jun 2002 | 126 Laguna St | Shanta Carpentry & Constr | dryrot repair of ground level deck on right side and rear. repair not to exceed 50%.no structural chDetails
dryrot repair of ground level deck on right side and rear. repair not to exceed 50%.no structural ch | $2,200 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Superior Plumbing & Fire Protection (2), Add A Garage Inc., Alward Const. Co Inc A Ca Corp, Au Electric Corporation/Aec Alarms, Bay Alarm Company, Scott Barlow Gen Cont., Shanta Carpentry & Constr
- Architects
- Mark Macy (2)
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.