Block 0845, lot 061
350 Scott St
- City’s use
- Single Family Residential
- Built
- 1890
- Stories
- 2
- Rooms
- 3 bedrooms, 1 bathroom
- Building
- 1,763 sq ft
- Zoning
- NA
- Construction type
- NA
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
4 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Dec 19, 2025 | Completed final sign-off Feb 2026 | 350 Scott St | Shelter Cove Construction | siding repair north facing side of bldg, non street visible, new materials to be used. north facing side wall.Details
siding repair north facing side of bldg, non street visible, new materials to be used. north facing side wall. | $12,000 |
| Sep 29, 2025 | Completed final sign-off Feb 2026 | 350 Scott St | Shelter Cove Construction | replace in kind (2) bathrooms fixtures and finishes. replace (1) shower pan in kindDetails
replace in kind (2) bathrooms fixtures and finishes. replace (1) shower pan in kind | $85,000 |
| May 19, 2023 | Completed final sign-off Nov 2023 | 350 Scott St | Peninsula Siding Company Inc | remove all siding and trim on back of home only. install new primed james hardie lap siding and trim. home owner will paint to match like for like. - match existing siding/trim.Details
remove all siding and trim on back of home only. install new primed james hardie lap siding and trim. home owner will paint to match like for like. - match existing siding/trim. | $20,000 |
| Apr 12, 2022 | Completed final sign-off Aug 2022 | 350 Scott St | Shelter Cove Construction | replace a 208sf kitchen. demolition and removal of kitchen millwork and app. removal of (e) flooring, wainscoting, vent and lights. install new subfloor, leveling compound and cleavage membrane w/ new ceramic tile flr and threshold at door. install new millwork, appliances, lights and vent.Details
replace a 208sf kitchen. demolition and removal of kitchen millwork and app. removal of (e) flooring, wainscoting, vent and lights. install new subfloor, leveling compound and cleavage membrane w/ new ceramic tile flr and threshold at door. install new millwork, appliances, lights and vent. | $120,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Shelter Cove Construction (3), Peninsula Siding Company Inc
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.