Block 0839, lot 018
350 Laguna St
- City’s use
- Multi-Family Residential
- Built
- 1926
- Stories
- 3
- Units
- 21
- Rooms
- 25 bedrooms, 21 bathrooms
- Building
- 12,000 sq ft
- Lot
- 4,210 sq ft
- Zoning
- RH3
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
21 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 17, 2025 | Completed final sign-off Nov 2025 | 350 Laguna St | unit#3: remodel kitchen and bath like for like.Details
unit#3: remodel kitchen and bath like for like. | $20,000 | |
| Oct 27, 2023 | Completed final sign-off Nov 2023 | 350 Laguna St | Magnum Construction Group Inc | ugprade (e) fire alarm system to comply w/ sffd 1103.7.6.1. add (42) low sounder to (e) fire alarm panel.Details
ugprade (e) fire alarm system to comply w/ sffd 1103.7.6.1. add (42) low sounder to (e) fire alarm panel. | $30,300 |
| Sep 28, 2017 | Never finaled issued Sep 2017, no final | 350 Laguna St | street space permitDetails
street space permit | ||
| Aug 24, 2017 | Never finaled issued Aug 2017, no final | 350 Laguna St | street spaceDetails
street space | ||
| Oct 17, 2016 | Never finaled issued Oct 2016, no final | 350 Laguna St | street space permitDetails
street space permit | ||
| Jun 29, 2016 | Never finaled issued Jun 2016, no final | 350 Laguna St | street spaceDetails
street space | ||
| Jun 20, 2016 | Completed final sign-off Aug 2016 | 350 Laguna St | San Francisco Fire Protection | like foe like fire system replacement w/new panel, smoke detectors & pull stations at the same location. (e) bells will be tie-in to new panel. install monitor modules to tie-in water flow & tamper switch.Details
like foe like fire system replacement w/new panel, smoke detectors & pull stations at the same location. (e) bells will be tie-in to new panel. install monitor modules to tie-in water flow & tamper switch. | $6,400 |
| May 23, 2016 | Completed final sign-off Jun 2016 | 350 Laguna St | revision to pa #201510281086: record as built conditions - new footing east lightwell, record correct shearwall length, eliminate moment frames west side, replace w/shearwalls.Details
revision to pa #201510281086: record as built conditions - new footing east lightwell, record correct shearwall length, eliminate moment frames west side, replace w/shearwalls. | ||
| Apr 4, 2016 | Completed final sign-off Aug 2016 | 350 Laguna St | Steven Yeung Inc Dba Chung Wah Plbg&Fire | installation of fire sprinkler system throughout ground floor and underground fire service. ref. to pa# 201511051897Details
installation of fire sprinkler system throughout ground floor and underground fire service. ref. to pa# 201511051897 | $25,000 |
| Dec 21, 2015 | Never finaled issued Dec 2015, no final | 350 Laguna St | street spaceDetails
street space | ||
| Nov 5, 2015 | Completed final sign-off Sep 2016 | 350 Laguna St | 4-new residential units #22, #23, #24, #25 - at lower levels - soft story seismic upgrade approved under pa#2015-10-28-1086 & parking removal has also been approved under pa#2015-10-28-1066.Details
4-new residential units #22, #23, #24, #25 - at lower levels - soft story seismic upgrade approved under pa#2015-10-28-1086 & parking removal has also been approved under pa#2015-10-28-1066. | $100,000 | |
| Oct 28, 2015 | Never finaled issued Nov 2015, no final | 350 Laguna St | convert auto parking to storage at first floor and basement. change of occupancy from s-2 to s-1- 2 hour occupancy separtion required on ceilings and wall- spriklers under separate permit for b and part of 1st floor -Details
convert auto parking to storage at first floor and basement. change of occupancy from s-2 to s-1- 2 hour occupancy separtion required on ceilings and wall- spriklers under separate permit for b and part of 1st floor - | $15,000 | |
| Oct 28, 2015 | Completed final sign-off Jun 2016 | 350 Laguna St | soft story upgrade per sfbc chapter 34b design criteria iebc 2012 appendix a-4Details
soft story upgrade per sfbc chapter 34b design criteria iebc 2012 appendix a-4 | $50,000 | |
| Jan 7, 2008 | Completed final sign-off Mar 2008 | 350 Laguna St | remodel units 10 and 15.move kitchens to (e)storage area.convert (e) kitchen area to bedrooms. remove non bearing wall.Details
remodel units 10 and 15.move kitchens to (e)storage area.convert (e) kitchen area to bedrooms. remove non bearing wall. | $10,000 | |
| Oct 31, 2007 | Completed final sign-off Feb 2008 | 350 Laguna St | remodel to (e) unit #22. relocate kitchen and create a bedroom.Details
remodel to (e) unit #22. relocate kitchen and create a bedroom. | $15,000 | |
| Oct 11, 2007 | Completed final sign-off Feb 2008 | 350 Laguna St | interior remodel of unit #18, relocate kitchen,create new bedroom.Details
interior remodel of unit #18, relocate kitchen,create new bedroom. | $10,000 | |
| Sep 6, 2007 | Completed final sign-off Dec 2007 | 350 Laguna St | interior remodel unit 1, relocate kitchen, partition wall removal, new header, close (e) opening @ doorway into closet. create new sleeping room.Details
interior remodel unit 1, relocate kitchen, partition wall removal, new header, close (e) opening @ doorway into closet. create new sleeping room. | $10,000 | |
| Aug 3, 2007 | Completed final sign-off Dec 2007 | 350 Laguna St | remodel unit #5. relocation of kitchen and convert kitchen to a new bedroom. remodel bathroom and remove non-bearing wall per plan.Details
remodel unit #5. relocation of kitchen and convert kitchen to a new bedroom. remodel bathroom and remove non-bearing wall per plan. | $14,000 | |
| Mar 7, 2007 | Never finaled issued Mar 2007, no final | 350 Laguna St | clarification of approved permit app #200701041012. identy extg heaters as electric hydronic heaters.Details
clarification of approved permit app #200701041012. identy extg heaters as electric hydronic heaters. | ||
| Jan 4, 2007 | Completed final sign-off Mar 2007 | 350 Laguna St | remodel (e) unit#14. relocate kitchen & create bedrm. @ (e) kit. location-modify (e0 window for egress (top hinge) same profile.Details
remodel (e) unit#14. relocate kitchen & create bedrm. @ (e) kit. location-modify (e0 window for egress (top hinge) same profile. | $8,000 | |
| Jan 21, 2004 | Expired or cancelled expired Dec 2006 | 350 Laguna St | S.F.A-1 Roofing & Maintenance | reroofingDetails
reroofing | $17,800 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Magnum Construction Group Inc, S.F.A-1 Roofing & Maintenance, San Francisco Fire Protection, Steven Yeung Inc Dba Chung Wah Plbg&Fire
- Architects
- Peter Shatara (5), Shatara Arch
- Engineers
- Shaun E. Moynahan (3), Suheil Shatara
- Designers
- Jobeen Tsang
Find contractors for work like this