Block 0819, lot 045
609 Hayes St
- City’s use
- Multi-Family Residential
- Built
- 1900
- Stories
- 3
- Units
- 2
- Rooms
- 2 bathrooms
- Building
- 2,750 sq ft
- Lot
- 1,513 sq ft
- Zoning
- NA
- Construction type
- NA
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
11 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Feb 25, 2025 | Completed final sign-off Apr 2025 | 609 Hayes St | add an indirect floor drain at commercial kitchenDetails
add an indirect floor drain at commercial kitchen | $4,000 | |
| Oct 8, 2024 | Completed final sign-off Oct 2024 | 609 Hayes St | replace siding at rear building not visible from the streetDetails
replace siding at rear building not visible from the street | $750 | |
| Feb 28, 2020 | Never finaled issued Feb 2020, no final | 609 Hayes St | street spaceDetails
street space | ||
| Jun 18, 2019 | Completed final sign-off Dec 2023 | 607 Hayes St | Pars Design & Construction | 2nd fl residential: add new forced air heater and ducts, upgrade restroom fixturesDetails
2nd fl residential: add new forced air heater and ducts, upgrade restroom fixtures | $8,500 |
| Jun 8, 2017 | Completed final sign-off Jul 2017 | 609 Hayes St | Integrity Air Systems Corporation | emergency repair - replace existing grease duct & fan damaged in ifre. existing 5' hood to remain. ansul existingDetails
emergency repair - replace existing grease duct & fan damaged in ifre. existing 5' hood to remain. ansul existing | $28,000 |
| Sep 28, 2007 | Completed final sign-off Dec 2007 | 609 Hayes St | Thomas Kessenich | revision to approved plans and permit# 2007.04.26.9762. minor revision to replace existing double entry door with single new entry door into an existing framed opening. replacement in kind of wood and temepered glass door.Details
revision to approved plans and permit# 2007.04.26.9762. minor revision to replace existing double entry door with single new entry door into an existing framed opening. replacement in kind of wood and temepered glass door. | $200 |
| Sep 14, 2007 | Completed final sign-off Dec 2007 | 609 Hayes St | Thomas Kessenich | revision to appl#200704269762 work includes mechanical portion of tenant improvement, hvac & hood.Details
revision to appl#200704269762 work includes mechanical portion of tenant improvement, hvac & hood. | $10,000 |
| May 16, 2007 | Never finaled issued May 2007, no final | 609 Hayes St | street space permitDetails
street space permit | ||
| Apr 26, 2007 | Completed final sign-off Dec 2007 | 609 Hayes St | Thomas Kessenich | t.i.work only. minimal demolition: front elevation bay to create ada entry,remove (e)sign, louver, remove (e) toilet room, remove (e) lath & plaster, floor repair. new work: ada entry & unisex restroom, new gyp board on (e) walls, new bar/open kitchen food prep.casework & equipment, stone floor.Details
t.i.work only. minimal demolition: front elevation bay to create ada entry,remove (e)sign, louver, remove (e) toilet room, remove (e) lath & plaster, floor repair. new work: ada entry & unisex restroom, new gyp board on (e) walls, new bar/open kitchen food prep.casework & equipment, stone floor. | $200,000 |
| Apr 25, 2007 | Completed final sign-off Dec 2007 | 609 Hayes St | Thomas Kessenich | soft demolition - plaster & lath on walls & ceiling, non-bearing partitons, exploratory concrete floor openings. disability accessibility requirement is exempted per sfbc ab-017, space will remain vacant until full accessibility compliance is provided.Details
soft demolition - plaster & lath on walls & ceiling, non-bearing partitons, exploratory concrete floor openings. disability accessibility requirement is exempted per sfbc ab-017, space will remain vacant until full accessibility compliance is provided. | $5,000 |
| Oct 19, 2005 | Never finaled issued Oct 2005, no final | 607 Hayes St | street space and sidewalkDetails
street space and sidewalk |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Thomas Kessenich (4), Integrity Air Systems Corporation, Pars Design & Construction
- Architects
- Frank Frost (2)
- Engineers
- Jeff Chow, Leonard M. Rose
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover two-family buildings like this one.