Block 0818, lot 048
447 Linden St
- City’s use
- Multi-Family Residential
- Stories
- 2
- Units
- 4
- Rooms
- 5 bedrooms, 5 bathrooms
- Building
- 3,471 sq ft
- Lot
- 1,898 sq ft
- Zoning
- NA
- Construction type
- NA
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
16 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Apr 26, 2018 | Never finaled issued Apr 2018, no final | 447 Linden St | Details
| ||
| Jan 16, 2018 | Completed final sign-off Mar 2018 | 451 Linden St | San Francisco Fire Protection | relocate facu ahj request. ref#201712065688. t.i.#201506128829Details
relocate facu ahj request. ref#201712065688. t.i.#201506128829 | |
| Dec 6, 2017 | Completed final sign-off Mar 2018 | 451 Linden St | San Francisco Fire Protection | sprinkler waterflow and supervisory system. install new control panel, radio comm. smoke det and pull station in basement storage rm. 2 monitor modules to tie in flow and tamper switche nto new pane. ref 201506128829, 201508134208Details
sprinkler waterflow and supervisory system. install new control panel, radio comm. smoke det and pull station in basement storage rm. 2 monitor modules to tie in flow and tamper switche nto new pane. ref 201506128829, 201508134208 | $2,500 |
| Nov 14, 2017 | Completed final sign-off Nov 2017 | 451 Linden St | Steven Yeung Inc Dba Chung Wah Plbg&Fire | as builts to reflect piping installed per 2015-0612-8829.Details
as builts to reflect piping installed per 2015-0612-8829. | |
| Oct 19, 2016 | Completed final sign-off Mar 2018 | 447 Linden St | replace 8 windows on linden st. elevation in-kind w/ metal clad wood windows to match existing.Details
replace 8 windows on linden st. elevation in-kind w/ metal clad wood windows to match existing. | $8,000 | |
| Oct 5, 2016 | Never finaled issued Oct 2016, no final | 447 Linden St | street spaceDetails
street space | ||
| Jun 6, 2016 | Never finaled issued Jun 2016, no final | 447 Linden St | street spaceDetails
street space | ||
| Feb 8, 2016 | Never finaled issued Feb 2016, no final | 447 Linden St | steet spaceDetails
steet space | ||
| Sep 29, 2015 | Never finaled issued Sep 2015, no final | 447 Linden St | street space permit (201308134237)Details
street space permit (201308134237) | ||
| Aug 13, 2015 | Completed final sign-off Mar 2018 | 451 Linden St | convert basement area to conditioned space as a part of 451 linden to include family room, bedroom, bath, and laundry. renovate existing kitchen and bath at 1st flDetails
convert basement area to conditioned space as a part of 451 linden to include family room, bedroom, bath, and laundry. renovate existing kitchen and bath at 1st fl | $65,000 | |
| Aug 5, 2015 | Completed final sign-off Mar 2018 | 447 Linden St | renew for pa#201308134237 finald inspection only. all work is complete.Details
renew for pa#201308134237 finald inspection only. all work is complete. | ||
| Jun 12, 2015 | Completed final sign-off Mar 2018 | 451 Linden St | Steven Yeung Inc Dba Chung Wah Plbg&Fire | installation of fire sprinkler system at basement. installation of underground fire service. ref pa# 201308134208.Details
installation of fire sprinkler system at basement. installation of underground fire service. ref pa# 201308134208. | $8,500 |
| Feb 3, 2015 | Never finaled issued Feb 2015, no final | 447 Linden St | street spaceDetails
street space | ||
| Jun 17, 2014 | Never finaled issued Jun 2014, no final | 447 Linden St | street spaceDetails
street space | ||
| Aug 13, 2013 | Completed final sign-off Mar 2018 | 447 Linden St | p g & e utility meters onto the property at front of bldg with new utility cabinets with blind flush stucco door in extg basement. reconfigure side deck stair to 447 to provide access to rear yard and convert extg basement to be apart of 453 with new internal stair & add (n) windows @ basement frontDetails
p g & e utility meters onto the property at front of bldg with new utility cabinets with blind flush stucco door in extg basement. reconfigure side deck stair to 447 to provide access to rear yard and convert extg basement to be apart of 453 with new internal stair & add (n) windows @ basement front | $25,000 | |
| Jul 26, 2011 | Completed final sign-off Aug 2011 | 447 Linden St | replace kitchen cabinets, fixtures and finishes at 447 linden. no structural work, work at kitchen to comply t24 requirements for lighting cec 150(k). no change to exhaust system.Details
replace kitchen cabinets, fixtures and finishes at 447 linden. no structural work, work at kitchen to comply t24 requirements for lighting cec 150(k). no change to exhaust system. | $3,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- San Francisco Fire Protection (2), Steven Yeung Inc Dba Chung Wah Plbg&Fire (2)
- Architects
- Mark Topetcher (2)
- Engineers
- Mark Topetcher, Moon Kang
Find contractors for work like this