Block 0803, lot 008
940 Hayes St
- City’s use
- Multi-Family Residential
- Built
- 1926
- Stories
- 3
- Units
- 40
- Rooms
- 40 bathrooms
- Building
- 25,294 sq ft
- Lot
- 11,688 sq ft
- Zoning
- RM2
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
36 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| May 9, 2024 | Completed final sign-off Jan 2025 | 940 Hayes St | Halyard Inc | upgrade fire alarm system to current codes, nfpa 72 (2022), to comply with sffc sec. 1103.7.6.1 to provide low frequency sounders in sleeping areas.Details
upgrade fire alarm system to current codes, nfpa 72 (2022), to comply with sffc sec. 1103.7.6.1 to provide low frequency sounders in sleeping areas. | $5,000 |
| Oct 31, 2020 | Never finaled issued Jan 2021, no final | 940 Hayes St | Brighter Bay Builders Inc | unit #2 & #8: renovation of new bedrooms and bathrooms. new kitchen cabinets & plumbing fixtures. new washer/dryers & dishwashers. new lighting at (e) j-boxes. no mechanical, exterior, fire alarm/sprinklers/structural work.Details
unit #2 & #8: renovation of new bedrooms and bathrooms. new kitchen cabinets & plumbing fixtures. new washer/dryers & dishwashers. new lighting at (e) j-boxes. no mechanical, exterior, fire alarm/sprinklers/structural work. | $130,000 |
| Sep 18, 2020 | Never finaled filed Sep 2020, never issued | 940 Hayes St | adding six (6) units on first level per ordinance 162-16. convert existing garage into new dwelling units within (e) envelope. 3 units @ 940 hayes garage and 3 units @ 942 hayes garage new bedrooms, six new bathrooms, six new dishwashers, six new washer/dryers. new windows facing the street.Details
adding six (6) units on first level per ordinance 162-16. convert existing garage into new dwelling units within (e) envelope. 3 units @ 940 hayes garage and 3 units @ 942 hayes garage new bedrooms, six new bathrooms, six new dishwashers, six new washer/dryers. new windows facing the street. | $750,000 | |
| Aug 31, 2020 | Never finaled issued Nov 2020, no final | 940 Hayes St | Brighter Bay Builders Inc | renovation of 2 apartments: unit 29 on third level and unit 15 on fourth level, new bedrooms & bathrooms. nw kitchen cabinets & plmg fixtures. nw washer/dryers & dishwashers. nw lighting at extg j boxes. no change to mech. no exterior work, fire alarm or sprnkler. structural work required.Details
renovation of 2 apartments: unit 29 on third level and unit 15 on fourth level, new bedrooms & bathrooms. nw kitchen cabinets & plmg fixtures. nw washer/dryers & dishwashers. nw lighting at extg j boxes. no change to mech. no exterior work, fire alarm or sprnkler. structural work required. | $135,000 |
| Jul 16, 2020 | Never finaled issued Jul 2020, no final | 940 Hayes St | street spaceDetails
street space | ||
| Feb 28, 2020 | Never finaled issued Feb 2020, no final | 940 Hayes St | street spaceDetails
street space | ||
| Feb 11, 2020 | Never finaled issued Feb 2020, no final | 940 Hayes St | Halyard Inc | kitchen and bath remodel in unit 29 and 15. unit 29: kitchen, 90 sq ft; unit #15: kitchen,104 sq ft - n dishwasher, replace cabinets, fixtures and appliances in kind. unit #29 bath, 25 sq ft, unit #15, bath 35 sq ft - n tiles , lighting and plumbing fixtures in kind.Details
kitchen and bath remodel in unit 29 and 15. unit 29: kitchen, 90 sq ft; unit #15: kitchen,104 sq ft - n dishwasher, replace cabinets, fixtures and appliances in kind. unit #29 bath, 25 sq ft, unit #15, bath 35 sq ft - n tiles , lighting and plumbing fixtures in kind. | $20,000 |
| Jan 22, 2020 | Never finaled issued Jan 2020, no final | 940 Hayes St | street spaceDetails
street space | ||
| Jan 22, 2020 | Never finaled issued Jan 2020, no final | 940 Hayes St | street spaceDetails
street space | ||
| Nov 6, 2019 | Never finaled issued Dec 2019, no final | 940 Hayes St | Brighter Bay Builders Inc, Halyard Inc | unit #19 4th level: renovation of one apartment. new kitchen cabinets & plumbing fixtures. new washer/dryer & dishwasher. new lighting at existing j-boxes. no change to mech. no exterior work, fire alarm, or sprinkler. no structural work.Details
unit #19 4th level: renovation of one apartment. new kitchen cabinets & plumbing fixtures. new washer/dryer & dishwasher. new lighting at existing j-boxes. no change to mech. no exterior work, fire alarm, or sprinkler. no structural work. | $65,000 |
| Oct 24, 2019 | Never finaled issued Dec 2019, no final | 940 Hayes St | Brighter Bay Builders Inc, Halyard Inc | apt 7 renovation on 3rd fl. new bedroom, new kitchen cabinets and plumbing fixtures. new washer/dryer & dishwasher. new lighting @ (e) boxes. no change to mechanical, no exterior work, fire alarm or sprinklerDetails
apt 7 renovation on 3rd fl. new bedroom, new kitchen cabinets and plumbing fixtures. new washer/dryer & dishwasher. new lighting @ (e) boxes. no change to mechanical, no exterior work, fire alarm or sprinkler | $65,000 |
| Oct 1, 2019 | Never finaled issued Dec 2019, no final | 940 Hayes St | Brighter Bay Builders Inc, Halyard Inc | renovation of 4 apartments - #04 & #27 on 2nd flr, #11 on 3rd flr, #20 on 1st flr. (n) kitchen cabinets and plumbing fixtures, (n) washers/dryers, (n) dishwashers, (n) bedrooms & bathrooms, (n) lighting at (e) j-boxes. no change to mechanical. no exterior work, fire alarm or sprinkler work.Details
renovation of 4 apartments - #04 & #27 on 2nd flr, #11 on 3rd flr, #20 on 1st flr. (n) kitchen cabinets and plumbing fixtures, (n) washers/dryers, (n) dishwashers, (n) bedrooms & bathrooms, (n) lighting at (e) j-boxes. no change to mechanical. no exterior work, fire alarm or sprinkler work. | $325,000 |
| Jan 3, 2019 | Never finaled issued Jan 2019, no final | 940 Hayes St | street spaceDetails
street space | ||
| Apr 12, 2018 | Never finaled issued Apr 2018, no final | 942 Hayes St | Hon's Construction Inc. | unit #30 - administrative permit to correct unit number from #32 to the correct unit #30 (ref 201802050378)Details
unit #30 - administrative permit to correct unit number from #32 to the correct unit #30 (ref 201802050378) | |
| Feb 5, 2018 | Never finaled issued Feb 2018, no final | 942 Hayes St | Hon's Construction Inc. | unit# 30: remodel (e) bath room like inkind, replace shower valve and slone valve toilet. add bathroom fan at ceiling. paint complete unit and refnish hardwood flooring; n/a maherDetails
unit# 30: remodel (e) bath room like inkind, replace shower valve and slone valve toilet. add bathroom fan at ceiling. paint complete unit and refnish hardwood flooring; n/a maher | $17,000 |
| Sep 1, 2017 | Completed final sign-off Jul 2018 | 940 Hayes St | S L M Development Inc. | revision to original permit 201609208281 to relocate some shearwalls with same value, add conc footing, revise collector linesDetails
revision to original permit 201609208281 to relocate some shearwalls with same value, add conc footing, revise collector lines | |
| Aug 16, 2017 | Completed final sign-off Mar 2018 | 942 Hayes St | S & H Renovations | unit c: revision to pa #201704063360 - addition of new bedroom, and new bathroom. relocate front door. unit c is on the ground fl.Details
unit c: revision to pa #201704063360 - addition of new bedroom, and new bathroom. relocate front door. unit c is on the ground fl. | $30,000 |
| Jul 11, 2017 | Never finaled issued Jul 2017, no final | 942 Hayes St | S & H Renovations | revise 201704063360. change address from 940 to 942 hayes # cDetails
revise 201704063360. change address from 940 to 942 hayes # c | |
| Apr 6, 2017 | Never finaled issued May 2017, no final | 940 Hayes St | S & H Renovations | apt c. ground floor renovation including additoin of bedroom, laundry, bathroom. renovation to existing kitchen & bath, new lighting. no exterior changes. n/a maher ordinanceDetails
apt c. ground floor renovation including additoin of bedroom, laundry, bathroom. renovation to existing kitchen & bath, new lighting. no exterior changes. n/a maher ordinance | $30,000 |
| Feb 7, 2017 | Completed final sign-off Jul 2017 | 940 Hayes St | S & H Renovations | renovation of apartment #28 including new bedroom, new laundry, revised bathroom & kitchen, new lighting, revised heating. maher naDetails
renovation of apartment #28 including new bedroom, new laundry, revised bathroom & kitchen, new lighting, revised heating. maher na | $30,000 |
| Oct 5, 2016 | Completed final sign-off Jan 2017 | 940 Hayes St | S & H Renovations | unit #6 & #17 - each unit: renovation of kitchen & bath. addition of bedroom, new partitions, doors, lightings & laundry. n/a maher ordinanceDetails
unit #6 & #17 - each unit: renovation of kitchen & bath. addition of bedroom, new partitions, doors, lightings & laundry. n/a maher ordinance | $75,000 |
| Sep 20, 2016 | Completed final sign-off Jul 2018 | 940 Hayes St | S L M Development Inc. | soft story retrofit per sfbc chapter 34b engineering critaria per 2012 iebc appendix a-4. n/a maherDetails
soft story retrofit per sfbc chapter 34b engineering critaria per 2012 iebc appendix a-4. n/a maher | $120,000 |
| May 25, 2016 | Never finaled issued May 2016, no final | 940 Hayes St | street spaceDetails
street space | ||
| May 10, 2016 | Completed final sign-off Sep 2016 | 940 Hayes St | S & H Renovations | renovation of apartment #12 and #32 on 3rd floor, #22 and #24 on 2nd floor. renovation of kitchen, bath, relocation of partition, installation of new laundry closet, lighting revisions and replacement of (e) heating. added bedrooms.Details
renovation of apartment #12 and #32 on 3rd floor, #22 and #24 on 2nd floor. renovation of kitchen, bath, relocation of partition, installation of new laundry closet, lighting revisions and replacement of (e) heating. added bedrooms. | $75,000 |
| Nov 13, 2014 | Completed final sign-off Jan 2015 | 940 Hayes St | Make Ready Maintenance Inc | unit 16: remodel bathroom and kitchen with in kind fixtures. no structural work. n/a maher ord. # 155-13Details
unit 16: remodel bathroom and kitchen with in kind fixtures. no structural work. n/a maher ord. # 155-13 | $20,000 |
| Nov 12, 2013 | Completed final sign-off Apr 2014 | 940 Hayes St | Precision Design & Drafting Inc | removal of towerstream wifi antenna site: 3 antennas & keep one otard antenna. to comply w/ pnoe 12291.compliance with ordinance no. 155-13 not required.Details
removal of towerstream wifi antenna site: 3 antennas & keep one otard antenna. to comply w/ pnoe 12291.compliance with ordinance no. 155-13 not required. | $500 |
| Mar 14, 2012 | Never finaled issued Mar 2012, no final | 940 Hayes St | street spaceDetails
street space | ||
| Feb 8, 2012 | Completed final sign-off Apr 2012 | 942 Hayes St | California Structural Restoration | #20 - bathroom dryrot repair as per item #1e & 1f of report #210859 not visable from street. same for same shower stall window.Details
#20 - bathroom dryrot repair as per item #1e & 1f of report #210859 not visable from street. same for same shower stall window. | $4,000 |
| Jan 5, 2012 | Completed final sign-off Apr 2012 | 940 Hayes St | California Structural Restoration | dryrot repair to the landing deck (termite report attacked)Details
dryrot repair to the landing deck (termite report attacked) | $15,000 |
| Mar 17, 2011 | Completed final sign-off Apr 2011 | 940 Hayes St | Eagle Ridge Construction And Roofing | repair wood exterior stairs per nov complaint #201189631. repair in kind rear stair less than 2%.Details
repair wood exterior stairs per nov complaint #201189631. repair in kind rear stair less than 2%. | $2,000 |
| Jan 16, 2008 | Completed final sign-off Aug 2008 | 942 Hayes St | On-Site Maintenance | work @ unit# 29 only. kitchen and bath remodel, no structural, cabinets, counter, tile. no work in bedrooms. no window or doors on this permit.Details
work @ unit# 29 only. kitchen and bath remodel, no structural, cabinets, counter, tile. no work in bedrooms. no window or doors on this permit. | $25,001 |
| Aug 23, 2007 | Completed final sign-off Nov 2007 | 940 Hayes St | Can Do Contractors | unit #7 - remodel kitchen: upgrade cab & plumbing fix, flooring and bathroom: upgrade plumbing fix flooring, wall tile . all flourescent lights @ bath & kithcen. no structural workDetails
unit #7 - remodel kitchen: upgrade cab & plumbing fix, flooring and bathroom: upgrade plumbing fix flooring, wall tile . all flourescent lights @ bath & kithcen. no structural work | $13,500 |
| Jun 12, 2007 | Completed final sign-off Jul 2007 | 940 Hayes St | Can Do Contractors | unit#10. kitchen: upgrade cabinets, sink, appliences & counter (in kind) . bathroom: upgrade all plumbing fixtures/wall & floor tile (in kind) . kitchen & bathroom (light fixtures to be fluorescent.Details
unit#10. kitchen: upgrade cabinets, sink, appliences & counter (in kind) . bathroom: upgrade all plumbing fixtures/wall & floor tile (in kind) . kitchen & bathroom (light fixtures to be fluorescent. | $13,500 |
| Sep 26, 2006 | Completed final sign-off Dec 2006 | 942 Hayes St | F B E And Sons General Const | apt# 34. replace kitchen cabinet, counter sink, floor tile. replace shower faucet, wall tile, vanity, sink. no change of light fixtures.Details
apt# 34. replace kitchen cabinet, counter sink, floor tile. replace shower faucet, wall tile, vanity, sink. no change of light fixtures. | $10,000 |
| Nov 7, 2002 | Never finaled issued Nov 2002, no final | 940 Hayes St | Super Roofing Company | reroofingDetails
reroofing | $19,000 |
| Apr 19, 2000 | Completed final sign-off Oct 2000 | 940 Hayes St | voluntary work to increase the extg lateral resistane of the foundationDetails
voluntary work to increase the extg lateral resistane of the foundation | $6,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- S & H Renovations (6), Brighter Bay Builders Inc (5), Halyard Inc (5), California Structural Restoration (2), Can Do Contractors (2), Hon's Construction Inc. (2), S L M Development Inc. (2), Eagle Ridge Construction And Roofing, F B E And Sons General Const, Make Ready Maintenance Inc, On-Site Maintenance, Precision Design & Drafting Inc, Super Roofing Company
- Architects
- Jacob Herczeg (5), Christopher Sullivan (4)
- Engineers
- Tyler Moser (2), Ali Afrasiabi, Christopher Sullivan
- Pmt consultant/expediters
- Bill Hung