Block 0793, lot 014
458 Grove St
- City’s use
- Commercial Office
- Built
- 1940
- Stories
- 1
- Units
- 2
- Building
- 1,593 sq ft
- Lot
- 1,891 sq ft
- Zoning
- NC1
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
15 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 29, 2018 | Never finaled issued Aug 2018, no final | 458 Grove St | streetspaceDetails
streetspace | ||
| Jul 16, 2018 | Completed final sign-off Oct 2018 | 458 Grove St | Buhler Construction | establish an outdoor patio establishment per commission motion no 19969 & case no 2017-000655cvaDetails
establish an outdoor patio establishment per commission motion no 19969 & case no 2017-000655cva | $75,000 |
| Sep 29, 2016 | Never finaled issued Oct 2016, no final | 458 Grove St | Astorga Construction Inc | to erect electrical sign with projected box and illuminated vinyl lettering with a led tube light.Details
to erect electrical sign with projected box and illuminated vinyl lettering with a led tube light. | $500 |
| Feb 20, 2015 | Never finaled issued Feb 2015, no final | 458 Grove St | street space permitDetails
street space permit | ||
| Dec 11, 2014 | Never finaled issued Dec 2014, no final | 458 Grove St | street space permitDetails
street space permit | ||
| Nov 25, 2014 | Completed final sign-off Mar 2015 | 458 Grove St | interior work to (e) space: remove 2 doors, (n) paint, (n) built-in bar rail, seal (e) concrete floor and 2 (n) sinks. new kitchen equipment.Details
interior work to (e) space: remove 2 doors, (n) paint, (n) built-in bar rail, seal (e) concrete floor and 2 (n) sinks. new kitchen equipment. | $20,000 | |
| Sep 24, 2014 | Completed final sign-off Dec 2014 | 460 Grove St | relocate (e) gas meter into (n) closet.Details
relocate (e) gas meter into (n) closet. | $1,000 | |
| Mar 25, 2014 | Never finaled issued Nov 2014, no final | 458 Grove St | change of use from retail to wine bar/restaurant. tenant improvement under separate permit.Details
change of use from retail to wine bar/restaurant. tenant improvement under separate permit. | $25,000 | |
| Mar 10, 2014 | Never finaled issued Mar 2014, no final | 460 Grove St | 2nd floor: remove extg interior walls, relocate kitchenette and remodel extg non-compliant bathroom. all new lighting shall be high efficacy.Details
2nd floor: remove extg interior walls, relocate kitchenette and remodel extg non-compliant bathroom. all new lighting shall be high efficacy. | $20,000 | |
| Dec 5, 2013 | Never finaled issued Dec 2013, no final | 458 Grove St | per pa #201301097589, add address as 458 grove st to block 0793, lot 014 as 458 grove st.Details
per pa #201301097589, add address as 458 grove st to block 0793, lot 014 as 458 grove st. | ||
| Jan 9, 2013 | Completed final sign-off Apr 2013 | 460 Grove St | remodel of extg office space fro retail use including new entry from sidewalk. remodel includes ada upgrades and relocating mechanical equipment.Details
remodel of extg office space fro retail use including new entry from sidewalk. remodel includes ada upgrades and relocating mechanical equipment. | $12,500 | |
| Apr 15, 2008 | Completed final sign-off Jul 2008 | 460 Grove St | renew permit application # 200705151341 for final inspectionDetails
renew permit application # 200705151341 for final inspection | ||
| Sep 24, 2007 | Completed final sign-off Oct 2007 | 460 Grove St | Nabi Construction & Engineering Inc | remove fence supporting dirt. provide 3 foot high retaining wall to support dirt and provide new fence 6 foot high.Details
remove fence supporting dirt. provide 3 foot high retaining wall to support dirt and provide new fence 6 foot high. | $5,000 |
| May 15, 2007 | Completed final sign-off Jul 2008 | 460 Grove St | Nabi Construction & Engineering Inc | barrier removal access to rear yard replace (e) fence,prefab gas fire, grade rear yardDetails
barrier removal access to rear yard replace (e) fence,prefab gas fire, grade rear yard | $3,000 |
| Feb 14, 2006 | Completed final sign-off Apr 2006 | 460 Grove St | Nabi Construction & Engineering Inc | replace (e) stairs in back in kind. ref app#9400627s.Details
replace (e) stairs in back in kind. ref app#9400627s. | $5,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Nabi Construction & Engineering Inc (3), Astorga Construction Inc, Buhler Construction
- Architects
- John T. Hood (4)
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.