Block 0779, lot 013A
988 Fulton St
The city’s assessor roll has no record for this parcel.
Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
9 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Oct 2, 2024 | Completed final sign-off Oct 2024 | 988 Fulton St | Universe Alliance Inc Dba Universe Cons | install missing vent openings where previously covered by new siding installation facing patio/ courtyard front building- (not facing the street) 3 vents openings total.Details
install missing vent openings where previously covered by new siding installation facing patio/ courtyard front building- (not facing the street) 3 vents openings total. | $1,000 |
| Aug 19, 2013 | Completed final sign-off Aug 2013 | 988 Fulton St | Connor Daly Corporation | to comply with complian 201308203 - repair and replace damaged z-vent grills (35 no.) at exterior of the front building (street side)Details
to comply with complian 201308203 - repair and replace damaged z-vent grills (35 no.) at exterior of the front building (street side) | $1,000 |
| Mar 13, 2013 | Completed final sign-off Aug 2013 | 988 Fulton St | Connor Daly Corporation | remove and replace 70 windows 3"x5" single hung white milgard vinyl in like kind. remove and replace 35 windows 5"x5", currently fixed, replace with double single hung, both existing and new are white vinyl / milgard.Details
remove and replace 70 windows 3"x5" single hung white milgard vinyl in like kind. remove and replace 35 windows 5"x5", currently fixed, replace with double single hung, both existing and new are white vinyl / milgard. | $50,000 |
| Jan 31, 2013 | Completed final sign-off Aug 2013 | 988 Fulton St | remove &replace siding, repair uncovered dry rot as needes, paint, touch up roof (less than 25% repair per 106a#13) remove and replace milgard with vinyl windows in like kind.Details
remove &replace siding, repair uncovered dry rot as needes, paint, touch up roof (less than 25% repair per 106a#13) remove and replace milgard with vinyl windows in like kind. | $400,000 | |
| Jan 18, 2013 | Completed final sign-off Aug 2013 | 988 Fulton St | Connor Daly Corporation | remove and replace siding at rear building for entire exterior.not visible from street. paint, recoat podium, touch up roof less than 25% of roof repair per 106a.2 #13, remove and replace windows.Details
remove and replace siding at rear building for entire exterior.not visible from street. paint, recoat podium, touch up roof less than 25% of roof repair per 106a.2 #13, remove and replace windows. | $330,000 |
| Feb 10, 2012 | Completed final sign-off Aug 2013 | 988 Fulton St | Connor Daly Corporation | remove siding, approx 100 sq ft. repair dryrot. replace with like paint to match existing.Details
remove siding, approx 100 sq ft. repair dryrot. replace with like paint to match existing. | $5,000 |
| Nov 4, 2011 | Completed final sign-off Feb 2012 | 988 Fulton St | Doorman Property Management | restoration of drywall and painting, carpet and door restoration on 4 doors. work in common area onlyDetails
restoration of drywall and painting, carpet and door restoration on 4 doors. work in common area only | $3,500 |
| Aug 27, 2002 | Expired or cancelled cancelled Aug 2002 | 988 Fulton St | to erect non-electrical signDetails
to erect non-electrical sign | $500 | |
| Apr 11, 2001 | Completed final sign-off May 2001 | 988 Fulton St | erect single faced non-electric signDetails
erect single faced non-electric sign |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Connor Daly Corporation (4), Doorman Property Management, Universe Alliance Inc Dba Universe Cons
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.