Block 0763, lot 002
507 Polk St
- City’s use
- Commercial Office
- Built
- 1910
- Stories
- 3
- Rooms
- 10 bathrooms
- Lot
- 9,896 sq ft
- Zoning
- NC3
- Construction type
- C
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
34 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Nov 8, 2023 | In progress issued Nov 2023 | 507 Polk St | Rapid Fire Safety&Security Llc Dba Pafa | 1st flr. fire alarm ti: adding cellular communicator to existing notifier afp-100 fire alarm systemDetails
1st flr. fire alarm ti: adding cellular communicator to existing notifier afp-100 fire alarm system | |
| Aug 16, 2021 | Completed final sign-off Sep 2021 | 507 Polk St | Saia Plastering | patch collapsed portion of concrete plaster wall with new to match scored pattern. lath then apply two coats of cement to match existing building. secure remaining polk street facade with anchor bolts, cut bolt ends to flush and paint to match. fwc job no b21-128 (to comply with report)Details
patch collapsed portion of concrete plaster wall with new to match scored pattern. lath then apply two coats of cement to match existing building. secure remaining polk street facade with anchor bolts, cut bolt ends to flush and paint to match. fwc job no b21-128 (to comply with report) | $12,000 |
| Oct 9, 2014 | Completed final sign-off Jan 2015 | 500 Golden Gate Av | Pacific Neon Company | single faced electric signDetails
single faced electric sign | $6,800 |
| Oct 9, 2014 | Never finaled issued Oct 2014, no final | 500 Golden Gate Av | Pacific Neon Company | vinyl signDetails
vinyl sign | $6,800 |
| Aug 6, 2014 | Never finaled issued Aug 2014, no final | 507 Polk St | Haanens Building Maintenance | installation of a materials life (not for passenger use) between basement & 1/f. includes framed opening in 1/f structure.Details
installation of a materials life (not for passenger use) between basement & 1/f. includes framed opening in 1/f structure. | $75,000 |
| Jun 30, 2014 | Never finaled issued Jun 2014, no final | 505 Polk St | Ayoob & Peery Plumbing Co Inc | 1st floor add & relocate fire sprinkler per tenant improvements - 3 add, 2 relocate. ref #2014.0610.7949.Details
1st floor add & relocate fire sprinkler per tenant improvements - 3 add, 2 relocate. ref #2014.0610.7949. | $2,570 |
| Jun 10, 2014 | Completed final sign-off Aug 2014 | 507 Polk St | Haanens Building Maintenance | 1st floor - build out of interior partitions for (1) internal office & (1) networking room. no change of use.Details
1st floor - build out of interior partitions for (1) internal office & (1) networking room. no change of use. | $10,000 |
| Apr 25, 2014 | Never finaled issued Apr 2014, no final | 505 Polk St | Haanens Building Maintenance | convert extg ground floor office into a fully ada accessible unisex toilet room.Details
convert extg ground floor office into a fully ada accessible unisex toilet room. | $12,000 |
| Nov 16, 2007 | Never finaled issued Nov 2007, no final | 507 Polk St | street space permitDetails
street space permit | ||
| Nov 14, 2007 | Never finaled issued Nov 2007, no final | 507 Polk St | Anderson Roofing & Sheet Metal | reroofing.Details
reroofing. | $6,400 |
| Oct 3, 2007 | Never finaled issued Oct 2007, no final | 500 Golden Gate Av | Illuminated Creations Dba Ellis & Ellis | 2 wall signs illuminated on exposed raceway/ east and south elev.Details
2 wall signs illuminated on exposed raceway/ east and south elev. | |
| Jul 19, 2007 | Never finaled issued Jul 2007, no final | 500 Golden Gate Av | Illuminated Creations Dba Ellis & Ellis | erecta wall single faced replacement mount signDetails
erecta wall single faced replacement mount sign | |
| May 5, 2006 | Never finaled issued May 2006, no final | 507 Polk St | street space permitDetails
street space permit | ||
| May 5, 2006 | Expired or cancelled expired Feb 2007 | 507 Polk St | Zebra Awning Co Inc | fabricate and install lawning.Details
fabricate and install lawning. | $700 |
| Sep 1, 2004 | Never finaled issued Sep 2004, no final | 507 Polk St | streetspaceDetails
streetspace | ||
| Aug 18, 2004 | Completed final sign-off Oct 2004 | 507 Polk St | Haanens Building Maintenance | relocate interior walls, light fixtures, outlets and switchesDetails
relocate interior walls, light fixtures, outlets and switches | $30,000 |
| Jul 1, 2004 | Never finaled issued Jul 2004, no final | 507 Polk St | street spaceDetails
street space | ||
| Jan 12, 2004 | Expired or cancelled expired Dec 2005 | 507 Polk St | Dpw Inc. | fully sprinkler 1st & 2nd floors tie into (e) 4" riser @ stairsDetails
fully sprinkler 1st & 2nd floors tie into (e) 4" riser @ stairs | $30,000 |
| Dec 9, 2003 | Never finaled issued Dec 2003, no final | 507 Polk St | Dpw Inc. | final as-built sprinkler drawings per field inspections marked up drawingsDetails
final as-built sprinkler drawings per field inspections marked up drawings | |
| Nov 7, 2003 | Completed final sign-off Dec 2003 | 507 Polk St | Herrero Builders Incorporated | oti-2, 1st floor- el, me, sp.Details
oti-2, 1st floor- el, me, sp. | $15,000 |
| Oct 20, 2003 | Never finaled issued Oct 2003, no final | 507 Polk St | Dpw Inc. | relocate existing sprinkler heads for new wall and ceiling in bank area only 3(n) recessed & 6 1/fDetails
relocate existing sprinkler heads for new wall and ceiling in bank area only 3(n) recessed & 6 1/f | $3,000 |
| Sep 12, 2003 | Never finaled issued Oct 2003, no final | 507 Polk St | revision to app #200207020538/new 1 hour corridor in the bsmnt to provide path of travel seperationDetails
revision to app #200207020538/new 1 hour corridor in the bsmnt to provide path of travel seperation | $8,000 | |
| Sep 2, 2003 | Never finaled issued Oct 2003, no final | 500 Golden Gate Av | Illuminated Creations Dba Ellis & Ellis | sign permit - electric, wall, single-faced.Details
sign permit - electric, wall, single-faced. | |
| Jun 23, 2003 | Never finaled issued Aug 2003, no final | 507 Polk St | Herrero Builders Incorporated | rev#200207020538. this permit is for handicap work to a tenant ramp. which includes handrails, an aoDetails
rev#200207020538. this permit is for handicap work to a tenant ramp. which includes handrails, an ao | $4,100 |
| Jun 13, 2003 | Never finaled issued Jun 2003, no final | 507 Polk St | Decker Electric Co Inc Electrical Contra | install monitoring on flows and tamper, main fac10 (1) smsoke, (1) pull & (1) horn strobeDetails
install monitoring on flows and tamper, main fac10 (1) smsoke, (1) pull & (1) horn strobe | $5,500 |
| Jun 12, 2003 | Completed final sign-off Dec 2003 | 507 Polk St | Herrero Builders Incorporated | oti-1, 1st floor, el, me, spDetails
oti-1, 1st floor, el, me, sp | $52,575 |
| May 15, 2003 | Never finaled issued Aug 2003, no final | 507 Polk St | Herrero Builders Incorporated | rev. appl#200207020538 & 200212234090 change construction type 3-n to 3-n fully sprinklered, changeDetails
rev. appl#200207020538 & 200212234090 change construction type 3-n to 3-n fully sprinklered, change | |
| Jan 29, 2003 | Never finaled issued Jan 2003, no final | 507 Polk St | Dpw Inc. | fully sprinkler 3rd floor only tie in to extg riser total 208 heads 3rd floorDetails
fully sprinkler 3rd floor only tie in to extg riser total 208 heads 3rd floor | $25,000 |
| Dec 23, 2002 | Never finaled issued Jan 2003, no final | 507 Polk St | Herrero Builders Incorporated | revision to pa 200207020538r-1 interior, non structural changes to 1st floor exitingDetails
revision to pa 200207020538r-1 interior, non structural changes to 1st floor exiting | |
| Nov 13, 2002 | Never finaled issued Nov 2002, no final | 507 Polk St | Dpw Inc. | fully sprinkle basement and 4th floor only total 305 heads basement & 4th floorDetails
fully sprinkle basement and 4th floor only total 305 heads basement & 4th floor | $70,000 |
| Jul 2, 2002 | Completed final sign-off Feb 2004 | 507 Polk St | Herrero Builders Incorporated | seismic improvement of umb and accessibility upgrades w/addition of 1817 sf future tenant space onDetails
seismic improvement of umb and accessibility upgrades w/addition of 1817 sf future tenant space on | $1,500,000 |
| Oct 31, 2000 | Completed final sign-off Nov 2000 | 505 Polk St | On-Site Maintenance | delete fire rated window,put in safety glass, location less than 10' to p.l.Details
delete fire rated window,put in safety glass, location less than 10' to p.l. | |
| Oct 20, 2000 | Completed final sign-off Nov 2000 | 505 Polk St | On-Site Maintenance | provide mech planss for ti work under 917803 (200006203096)Details
provide mech planss for ti work under 917803 (200006203096) | |
| Jun 20, 2000 | Completed final sign-off Nov 2000 | 505 Polk St | tenant improvement to 1st floor/remodel restroomDetails
tenant improvement to 1st floor/remodel restroom | $90,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Herrero Builders Incorporated (6), Dpw Inc. (5), Haanens Building Maintenance (4), Illuminated Creations Dba Ellis & Ellis (3), On-Site Maintenance (2), Pacific Neon Company (2), Anderson Roofing & Sheet Metal, Ayoob & Peery Plumbing Co Inc, Decker Electric Co Inc Electrical Contra, Rapid Fire Safety&Security Llc Dba Pafa, Saia Plastering, Zebra Awning Co Inc
- Architects
- Eric Ibsen (2)
- Engineers
- Julian White
Find contractors for work like this