Block 0694, lot 012
1161 Post St
- City’s use
- Commercial Retail
- Built
- 1918
- Stories
- 2
- Units
- 1
- Rooms
- 2 bathrooms
- Building
- 3,705 sq ft
- Lot
- 3,300 sq ft
- Zoning
- RC4
- Construction type
- C
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
26 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jul 10, 2015 | Completed final sign-off Apr 2019 | 1161 Post St | Charles Pankow Builders Ltd | shoring tiebacks at 1161 post. related to pa 201507101184 and 201112090400Details
shoring tiebacks at 1161 post. related to pa 201507101184 and 201112090400 | $56,000 |
| Nov 25, 2013 | Never finaled issued Jul 2018, no final | 1161 Post St | Kitami | modification to (e) garage. installing new wall, new floor, and new electric outlets.Details
modification to (e) garage. installing new wall, new floor, and new electric outlets. | $8,500 |
| Nov 2, 2009 | Completed final sign-off Nov 2009 | 1161 Post St | Kitami | to obtain final inspection for work approved under pa #200704168885, all work is complete.Details
to obtain final inspection for work approved under pa #200704168885, all work is complete. | |
| Oct 14, 2009 | Completed final sign-off Dec 2009 | 1161 Post St | Kitami | to erect single faced electric wall signDetails
to erect single faced electric wall sign | $3,000 |
| Sep 16, 2009 | Completed final sign-off Nov 2009 | 1161 Post St | Universal Fire Equipment Co | 1st. floor revision the as built plans 200908064262 resize the tank pcl460.Details
1st. floor revision the as built plans 200908064262 resize the tank pcl460. | |
| Aug 26, 2009 | Completed final sign-off Nov 2009 | 1161 Post St | Kitami | revision to pa #200608098956, interior wall fr 1-hr to no rated const per sec. 1004.3.3, at employee rm at 2nd fl, no interior wall for 2nd dining area, one big dining area to remain, recale occupancy load at 2nd fl.Details
revision to pa #200608098956, interior wall fr 1-hr to no rated const per sec. 1004.3.3, at employee rm at 2nd fl, no interior wall for 2nd dining area, one big dining area to remain, recale occupancy load at 2nd fl. | |
| Aug 18, 2009 | Completed final sign-off Nov 2009 | 1161 Post St | C T Construction & Plumb | to obtain final inspection for work approved under pa #200803318349, all work is completed.Details
to obtain final inspection for work approved under pa #200803318349, all work is completed. | |
| Aug 6, 2009 | Completed final sign-off Nov 2009 | 1161 Post St | install fire suppression system to pprotect hood, duct,plenum and cooking equipments under the hood.Details
install fire suppression system to pprotect hood, duct,plenum and cooking equipments under the hood. | $4,000 | |
| Feb 2, 2009 | Completed final sign-off Nov 2009 | 1161 Post St | Kitami | renew pa# 2008/02/01/3864 to complete work & obtain final inspection.Details
renew pa# 2008/02/01/3864 to complete work & obtain final inspection. | $1,000 |
| Feb 2, 2009 | Completed final sign-off Nov 2009 | 1161 Post St | Kitami | renew pa# 2006/08/09/8956 to complete work & obtain final inspection.Details
renew pa# 2006/08/09/8956 to complete work & obtain final inspection. | $200,000 |
| Nov 12, 2008 | Expired or cancelled expired Jan 2010 | 1161 Post St | Tyco Integrated Security | install control panel in basement & fire protection devices thruout the floors, install control & relay modules for elev. control, connect waterflows, temper switch & ansul system to fire panel, nfpa 72 centrae system monitoring.Details
install control panel in basement & fire protection devices thruout the floors, install control & relay modules for elev. control, connect waterflows, temper switch & ansul system to fire panel, nfpa 72 centrae system monitoring. | $14,300 |
| Oct 16, 2008 | Never finaled issued Oct 2008, no final | 1161 Post St | Kitami | revision to extg app #200402095879/200501284296 per inspector note dated 9-18-08. submit app to complete new elevator, bathrooms and stairs under approved t.i. permit #200608098956 for new restaurantDetails
revision to extg app #200402095879/200501284296 per inspector note dated 9-18-08. submit app to complete new elevator, bathrooms and stairs under approved t.i. permit #200608098956 for new restaurant | $100 |
| Sep 29, 2008 | Completed final sign-off Feb 2009 | 1161 Post St | Kitami | revision to extg permit # 200501284296. reinforce extg as-built 2nd floor wood framing at rear section over garage area with steel channel and tube.Details
revision to extg permit # 200501284296. reinforce extg as-built 2nd floor wood framing at rear section over garage area with steel channel and tube. | |
| Sep 16, 2008 | Completed final sign-off Feb 2009 | 1161 Post St | Kitami | revision to appl #200501284296 per 8/7/08 correction notice & report; details a,b, c,d,e on sheet s-2 & detail k/s-4 per (e) site conditions floor and roof details; show (e) skylights & roof hatch on sheet s-2.Details
revision to appl #200501284296 per 8/7/08 correction notice & report; details a,b, c,d,e on sheet s-2 & detail k/s-4 per (e) site conditions floor and roof details; show (e) skylights & roof hatch on sheet s-2. | |
| Jul 23, 2008 | Completed final sign-off Feb 2009 | 1161 Post St | Kitami | revision to application 200806164524; 2005-0128-4296. detail d/55 per site condition floor jst sitting on top of steel channel in lieu of floor jst being hung on steel channel.Details
revision to application 200806164524; 2005-0128-4296. detail d/55 per site condition floor jst sitting on top of steel channel in lieu of floor jst being hung on steel channel. | |
| Jun 16, 2008 | Completed final sign-off Feb 2009 | 1161 Post St | Kitami, All Applied Construction Inc | renewal for (e) permit 2007-1113-7921, 2002-0314-1443, 2005-0128-4296 for final inspection.Details
renewal for (e) permit 2007-1113-7921, 2002-0314-1443, 2005-0128-4296 for final inspection. | |
| Mar 31, 2008 | Never finaled issued Mar 2008, no final | 1161 Post St | C T Construction & Plumb | install sprinkler heads in basement, 1st, and 2nd floors. total 99Details
install sprinkler heads in basement, 1st, and 2nd floors. total 99 | $18,000 |
| Feb 1, 2008 | Expired or cancelled expired Jan 2010 | 1161 Post St | revision to pa#2006/08/09/8956 to change front entrance layout.Details
revision to pa#2006/08/09/8956 to change front entrance layout. | ||
| Nov 13, 2007 | Expired or cancelled expired Aug 2009 | 1161 Post St | Kitami, All Applied Construction Inc | renew pa# 2002/03/14/1443 (10 special inspection req'd) & pa# 2005/01/28/4296 (2 special inspections req'd).Details
renew pa# 2002/03/14/1443 (10 special inspection req'd) & pa# 2005/01/28/4296 (2 special inspections req'd). | |
| Apr 16, 2007 | Completed final sign-off Jan 2010 | 1161 Post St | install kitchen hood & exhaust for make up fan hvac for seating area & fire sprinklers system @ basementDetails
install kitchen hood & exhaust for make up fan hvac for seating area & fire sprinklers system @ basement | $20,000 | |
| Aug 9, 2006 | Expired or cancelled expired Jan 2010 | 1161 Post St | Kitami | full service restaurant with bar, karaoke, banguet rooms.(title 24 compliance, elec, mech, pluming & sprinkler work will be under sep permits. exist permits 200501284296, 200402095879 for umb and ada and reference plans.Details
full service restaurant with bar, karaoke, banguet rooms.(title 24 compliance, elec, mech, pluming & sprinkler work will be under sep permits. exist permits 200501284296, 200402095879 for umb and ada and reference plans. | $200,000 |
| Mar 6, 2006 | Never finaled issued Mar 2006, no final | 1161 Post St | street space | ||
| Jun 6, 2005 | Never finaled issued Jun 2005, no final | 1161 Post St | street space | ||
| Jan 28, 2005 | Completed final sign-off Feb 2009 | 1161 Post St | rev.to (e)umb seismic upgrade appl#200402095879 due to reduction in scope of projectDetails
rev.to (e)umb seismic upgrade appl#200402095879 due to reduction in scope of project | ||
| Feb 9, 2004 | Completed final sign-off Oct 2008 | 1161 Post St | seismic upgrade existing umb change existing mezz floor to become 2/f cut wall for new garage drDetails
seismic upgrade existing umb change existing mezz floor to become 2/f cut wall for new garage dr | $200,000 | |
| Mar 14, 2002 | Completed final sign-off Feb 2009 | 1161 Post St | seismic retrofit of unreinforced masonry bldg as per special procedure of sfbcDetails
seismic retrofit of unreinforced masonry bldg as per special procedure of sfbc | $90,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Kitami (13), All Applied Construction Inc (2), C T Construction & Plumb (2), Charles Pankow Builders Ltd, Tyco Integrated Security, Universal Fire Equipment Co
- Architects
- Kim Ton Lew (6), Kim Lew
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.