Block 0652, lot 016
2178 Pine St
- City’s use
- Single Family Residential
- Built
- 1900
- Stories
- 3
- Units
- 1
- Rooms
- 5 bedrooms, 4 bathrooms
- Building
- 3,990 sq ft
- Lot
- 2,809 sq ft
- Zoning
- RH2
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
26 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jun 1, 2018 | Completed final sign-off Jun 2018 | 2178 Pine St | add natural gas fire table to roof deckDetails
add natural gas fire table to roof deck | $250 | |
| Apr 19, 2018 | Completed final sign-off Apr 2018 | 2178 Pine St | Crime Watch Security Sys Llc | installation of new sprinkler monitoring system ref 201405196122 & 201707292702Details
installation of new sprinkler monitoring system ref 201405196122 & 201707292702 | $3,500 |
| Apr 18, 2018 | Completed final sign-off Jun 2018 | 2178 Pine St | revision to pa 2014-0519-6122 reconfigure of media room and bedroom at 1st floor. door modifications at 1st fl & 2nd flDetails
revision to pa 2014-0519-6122 reconfigure of media room and bedroom at 1st floor. door modifications at 1st fl & 2nd fl | ||
| Mar 27, 2018 | Never finaled issued Mar 2018, no final | 2178 Pine St | street spaceDetails
street space | ||
| Sep 6, 2017 | Never finaled issued Sep 2017, no final | 2178 Pine St | street spaceDetails
street space | ||
| Jul 24, 2017 | Completed final sign-off May 2018 | 2178 Pine St | Serrano Fire Protection Systems | install fire sprinkler underground pipe in accordance nfpa24 edition 2013. ref. pa#201402128378Details
install fire sprinkler underground pipe in accordance nfpa24 edition 2013. ref. pa#201402128378 | $3,000 |
| Jun 16, 2017 | Completed final sign-off Jun 2018 | 2178 Pine St | administrative permit to correct description of work under pa# 201405196122, ground flr garage & fourth story added, reference # 201306058758 & 201308073701 & 201308265192, 201309066134 & 201312174332Details
administrative permit to correct description of work under pa# 201405196122, ground flr garage & fourth story added, reference # 201306058758 & 201308073701 & 201308265192, 201309066134 & 201312174332 | ||
| Jan 23, 2017 | Never finaled issued Jan 2017, no final | 2178 Pine St | street spaceDetails
street space | ||
| Oct 28, 2016 | Never finaled issued Oct 2016, no final | 2178 Pine St | street spaceDetails
street space | ||
| Aug 13, 2015 | Never finaled issued Aug 2015, no final | 2178 Pine St | street spaceDetails
street space | ||
| Feb 6, 2015 | Never finaled issued Feb 2015, no final | 2178 Pine St | street space permit (renewal of permit # m477048 / 1321172)Details
street space permit (renewal of permit # m477048 / 1321172) | ||
| Jul 11, 2014 | Completed final sign-off Oct 2014 | 2178 Pine St | Ace Drilling & Excavation | revision to pa 201312174332. stabilize (e) facadeDetails
revision to pa 201312174332. stabilize (e) facade | $20,000 |
| Jun 3, 2014 | Expired or cancelled cancelled Feb 2023 | 2178 Pine St | Ace Drilling & Excavation | new 6' fence at rear yard and side property line not visible from street.Details
new 6' fence at rear yard and side property line not visible from street. | $15,000 |
| May 23, 2014 | Expired or cancelled withdrawn Nov 2014 | 2178 Pine St | revision to appl #2013.1217.4332: comply w/nov #201342661 - emergency permit to stabalize (e) condition, brace (e) facade, no deviation from pa #2014.0519.612 submitted to planning.Details
revision to appl #2013.1217.4332: comply w/nov #201342661 - emergency permit to stabalize (e) condition, brace (e) facade, no deviation from pa #2014.0519.612 submitted to planning. | $80,000 | |
| May 19, 2014 | Completed final sign-off Jun 2018 | 2178 Pine St | Cullinane Plastering, Golden State Marble & Granite Inc. | comply with nov 201470771. reconstruct building to original layout.Details
comply with nov 201470771. reconstruct building to original layout. | $500,000 |
| Apr 4, 2014 | Never finaled issued Apr 2014, no final | 2178 Pine St | street spaceDetails
street space | ||
| Feb 12, 2014 | Completed final sign-off May 2018 | 2178 Pine St | Thorpe Design Inc | installation of automatic fire sprinkler systemDetails
installation of automatic fire sprinkler system | $12,000 |
| Feb 5, 2014 | Never finaled issued Feb 2014, no final | 2178 Pine St | street spaceDetails
street space | ||
| Dec 17, 2013 | Completed final sign-off Jun 2018 | 2178 Pine St | Ace Drilling & Excavation | comply with nov#201342661. emergency permit to stabalize extg condition. temporary brace extg facade. foundation walls and mat slab to hold brace frame.Details
comply with nov#201342661. emergency permit to stabalize extg condition. temporary brace extg facade. foundation walls and mat slab to hold brace frame. | $20,000 |
| Nov 7, 2013 | Never finaled issued Nov 2013, no final | 2178 Pine St | street spaceDetails
street space | ||
| Sep 6, 2013 | Expired or cancelled expired Jun 2018 | 2178 Pine St | Ace Drilling & Excavation | structural revision to pa #2013.06.05.8758Details
structural revision to pa #2013.06.05.8758 | $80,000 |
| Aug 26, 2013 | Expired or cancelled expired Jun 2018 | 2178 Pine St | Ace Drilling & Excavation | shoring for pa# 2013-0807-3701Details
shoring for pa# 2013-0807-3701 | $210,000 |
| Aug 7, 2013 | Expired or cancelled expired Jun 2018 | 2178 Pine St | convert 1st floor from storage to habitable space-2 bathrooms & 3 bedrooms. remodel 2nd floor & add 1/2 bathroom. remodel 3rd floor-add 1 bathroom, 1 bedroom & new skylights. partial seismic upgrade of buildingDetails
convert 1st floor from storage to habitable space-2 bathrooms & 3 bedrooms. remodel 2nd floor & add 1/2 bathroom. remodel 3rd floor-add 1 bathroom, 1 bedroom & new skylights. partial seismic upgrade of building | $100,000 | |
| Jun 5, 2013 | Expired or cancelled expired Jun 2018 | 2178 Pine St | S F Garage Company Inc. | construct (n) garage door at ground level. construct (n) foundation at ground level. voluntary strucrual strenghthing. replace (e) concrete stair with (n) concrete stair.Details
construct (n) garage door at ground level. construct (n) foundation at ground level. voluntary strucrual strenghthing. replace (e) concrete stair with (n) concrete stair. | $80,000 |
| Jun 5, 2013 | Expired or cancelled withdrawn Nov 2014 | 2178 Pine St | S F Garage Company Inc. | construct (n) garage door at ground level. construct (n) foundation at ground level. convert (e) storage to (n) subfloor. voluntary strucrual strenghthing. replace (e0 concrete stair with (n) concrete stairDetails
construct (n) garage door at ground level. construct (n) foundation at ground level. convert (e) storage to (n) subfloor. voluntary strucrual strenghthing. replace (e0 concrete stair with (n) concrete stair | |
| Aug 2, 2002 | Expired or cancelled expired Apr 2003 | 2178 Pine St | Ramirez Roofing Corporation | reroofingDetails
reroofing | $10,600 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Ace Drilling & Excavation (5), S F Garage Company Inc. (2), Crime Watch Security Sys Llc, Cullinane Plastering, Golden State Marble & Granite Inc., Ramirez Roofing Corporation, Serrano Fire Protection Systems, Thorpe Design Inc
- Architects
- Santos & Urrutia
- Engineers
- Rodrigo Santos (5), Harold Howell
- Pmt consultant/expediters
- Lok Chan
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover single-family homes like this one.