Block 0590, lot 001
2101 Pacific Ave
- City’s use
- Multi-Family Residential
- Built
- 1930
- Stories
- 6
- Units
- 31
- Rooms
- 36 bathrooms
- Building
- 48,298 sq ft
- Lot
- 14,387 sq ft
- Zoning
- RM2
- Construction type
- C
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
8 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 16, 2025 | Completed final sign-off Sep 2025 | 2101 Pacific Av | Commercial Fire Protection Llc | as built fire alarm to 202508203510. correct the unit design of unit 206 to match on site details, removed horn in the bedroom area since its an open bedroom.Details
as built fire alarm to 202508203510. correct the unit design of unit 206 to match on site details, removed horn in the bedroom area since its an open bedroom. | |
| Aug 20, 2025 | Completed final sign-off Sep 2025 | 2101 Pacific Av | Commercial Fire Protection Llc | as built to pa #202405162261.annunciator model update to match as built and 2nd annunciator installed. horn strobes model update. per inspector's request intall new smoke detector above facu on 1st level.Details
as built to pa #202405162261.annunciator model update to match as built and 2nd annunciator installed. horn strobes model update. per inspector's request intall new smoke detector above facu on 1st level. | |
| Jul 9, 2024 | Completed final sign-off Jan 2025 | 2101 Pacific Av | Gogreen Roofing Corporation | reroofingDetails
reroofing | $194,260 |
| Jun 3, 2024 | Completed final sign-off Sep 2025 | 2101 Pacific Av | Commercial Fire Protection Llc | upgrade fire alarm system to comply with 2022 sffc 1103.7.6.1,ab#3.08 & 2.01, and 2022 cfbc,cbc and nfpa 72-022. system will be automatic and manual system with pull stations at req exists since bldg has partial f/s sys.facp shall be moniitor with a new cellular sole path communiation.Details
upgrade fire alarm system to comply with 2022 sffc 1103.7.6.1,ab#3.08 & 2.01, and 2022 cfbc,cbc and nfpa 72-022. system will be automatic and manual system with pull stations at req exists since bldg has partial f/s sys.facp shall be moniitor with a new cellular sole path communiation. | $99,000 |
| Jul 24, 2018 | Never finaled issued Jul 2018, no final | 2101 Pacific Av | Tri-Signal Integration Inc. | emerg panel replace. remove failed farabay 1522d panel. installnew firewarden 100-2 panel w/ipgsm-4v dialer & interface addressable module to (e) devices listed in ul cert. #fa45454932 fa system shall be 100% functionally revised plus 10% test of (e) devcs. fa control unit csfu listing 730000280237Details
emerg panel replace. remove failed farabay 1522d panel. installnew firewarden 100-2 panel w/ipgsm-4v dialer & interface addressable module to (e) devices listed in ul cert. #fa45454932 fa system shall be 100% functionally revised plus 10% test of (e) devcs. fa control unit csfu listing 730000280237 | $4,000 |
| Jul 6, 2007 | Never finaled issued Jul 2007, no final | 2101 Pacific Av | street space & sidewalkDetails
street space & sidewalk | ||
| Dec 14, 2004 | Completed final sign-off Dec 2004 | 2101 Pacific Av | The Window Specialist | 5 windows on rear building, in kindDetails
5 windows on rear building, in kind | $22,000 |
| Sep 2, 2004 | Never finaled issued Sep 2004, no final | 2101 Pacific Av | street spaceDetails
street space |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Commercial Fire Protection Llc (3), Gogreen Roofing Corporation, The Window Specialist, Tri-Signal Integration Inc.
- Authorized agent-otherss
- Thomas Courtney
- Designers
- David B. Edwards
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.