Block 0556, lot 011
2138 Vallejo St
The city’s assessor roll has no record for this parcel.
Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
7 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 22, 2016 | Completed final sign-off Sep 2017 | 2138 Vallejo St | Pkm Builders Inc | 2/f - remove plaster in nursery, install new insulated sheetrock, mud and tape, appro. 8' x 10'Details
2/f - remove plaster in nursery, install new insulated sheetrock, mud and tape, appro. 8' x 10' | $3,500 |
| Feb 11, 2016 | Never finaled issued Feb 2016, no final | 2134 Vallejo St | street space permitDetails
street space permit | ||
| Feb 9, 2016 | Completed final sign-off Feb 2016 | 2134 Vallejo St | I & A Contractor Inc | reroofingDetails
reroofing | $13,500 |
| Jul 10, 2015 | Expired or cancelled expired Aug 2019 | 2138 Vallejo St | Marcos Leon Construction,Inc | remodel two bathrooms & one bedroom: work includes tear out dry wall finishes, upgrade electrical & plumbimg, insulate wall. replace two windows in-kind with u-factor not to exceed 0.32 at side not visible from street. no new wall and no existing wall relocation.Details
remodel two bathrooms & one bedroom: work includes tear out dry wall finishes, upgrade electrical & plumbimg, insulate wall. replace two windows in-kind with u-factor not to exceed 0.32 at side not visible from street. no new wall and no existing wall relocation. | $25,000 |
| Mar 9, 2015 | Never finaled issued Mar 2015, no final | 2134 Vallejo St | Marcos Leon Construction,Inc | to comply with physical inspections report #cc-7822 item 1 & 2 condo conversion of unit 2134 remove toilet & sink in unit 2134 - return to closetDetails
to comply with physical inspections report #cc-7822 item 1 & 2 condo conversion of unit 2134 remove toilet & sink in unit 2134 - return to closet | $800 |
| Feb 18, 2015 | Completed final sign-off Apr 2015 | 2134 Vallejo St | Marcos Leon Construction,Inc | to comply with physical inspection report #cc-7822Details
to comply with physical inspection report #cc-7822 | $15,000 |
| Aug 3, 2011 | Completed final sign-off Feb 2012 | 2138 Vallejo St | Seth Bernstein | remodel kitchen in kind - new insulation, new sheetrock, new cabinets, new flooring, new paint, new electrical and plumbing. comply with cec 150 (k)Details
remodel kitchen in kind - new insulation, new sheetrock, new cabinets, new flooring, new paint, new electrical and plumbing. comply with cec 150 (k) | $10,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Marcos Leon Construction,Inc (3), I & A Contractor Inc, Pkm Builders Inc, Seth Bernstein
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.