Block 0522, lot 015
1515 Greenwich St
- City’s use
- Multi-Family Residential
- Built
- 1906
- Stories
- 3
- Units
- 35
- Rooms
- 35 bathrooms
- Building
- 19,485 sq ft
- Lot
- 9,052 sq ft
- Zoning
- RM2
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
44 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Apr 15, 2026 | In progress issued May 2026 | 1515 Greenwich St | Elex Solutions Inc | installation of a 150amp meter main to serve (9) level 2 (20amp) ev chargers in parking garage.Details
installation of a 150amp meter main to serve (9) level 2 (20amp) ev chargers in parking garage. | $15,000 |
| Aug 5, 2024 | Completed final sign-off Sep 2024 | 1515 Greenwich St | San Francisco Fire Protection | to verify e) sound level in sleeping areas comply w/ sffc sec 1103.7.6.1 indicating the dba reading in each living & sleeping areas are of at least 75 dbaDetails
to verify e) sound level in sleeping areas comply w/ sffc sec 1103.7.6.1 indicating the dba reading in each living & sleeping areas are of at least 75 dba | |
| Mar 30, 2015 | Completed final sign-off Mar 2016 | 1515 Greenwich St | remodel unit # 5 at 1515 greenwich, no change to structure or floor plan, no change to (e) or windows, led or cfl lighting only. remodel kitchen & bathroom no walls to be moved/no structural all fir rated assembilies to be maintained /kitchen&bath pqr cml 403.7 exhaust 3'jpl maintain rated seperatioDetails
remodel unit # 5 at 1515 greenwich, no change to structure or floor plan, no change to (e) or windows, led or cfl lighting only. remodel kitchen & bathroom no walls to be moved/no structural all fir rated assembilies to be maintained /kitchen&bath pqr cml 403.7 exhaust 3'jpl maintain rated seperatio | $25,000 | |
| Oct 17, 2011 | Completed final sign-off Oct 2012 | 1515 Greenwich St | remodel unit 30 including new kitchen and 1 bath. non structuralDetails
remodel unit 30 including new kitchen and 1 bath. non structural | $20,000 | |
| Apr 8, 2010 | Completed final sign-off Apr 2010 | 1515 Greenwich St | to obtain final inspection for work approved udner pa #200706063215. all work is complete.Details
to obtain final inspection for work approved udner pa #200706063215. all work is complete. | ||
| Apr 8, 2010 | Completed final sign-off May 2010 | 1515 Greenwich St | to obtain final inspection for work approved udner pa #200507228361. all work is complete.Details
to obtain final inspection for work approved udner pa #200507228361. all work is complete. | ||
| Apr 8, 2010 | Completed final sign-off May 2010 | 1515 Greenwich St | to obtain final inspection for work approved udner pa #200506134909. all work is complete.Details
to obtain final inspection for work approved udner pa #200506134909. all work is complete. | ||
| Apr 8, 2010 | Completed final sign-off Apr 2010 | 1515 Greenwich St | to obtain final inspection for work approved under pa #200512231006. all work is complete.Details
to obtain final inspection for work approved under pa #200512231006. all work is complete. | ||
| Apr 8, 2010 | Completed final sign-off Apr 2010 | 1515 Greenwich St | to obtain final inspection for work approved udner pa #200806174676. all work is complete.Details
to obtain final inspection for work approved udner pa #200806174676. all work is complete. | ||
| Mar 1, 2010 | Completed final sign-off Mar 2010 | 1515 Greenwich St | to obtain final inspection for work approved under app #200512231008. all work is completeDetails
to obtain final inspection for work approved under app #200512231008. all work is complete | ||
| Mar 1, 2010 | Completed final sign-off Mar 2010 | 1515 Greenwich St | to obtain final inspection for work approved under app #200607065753. all work is completeDetails
to obtain final inspection for work approved under app #200607065753. all work is complete | ||
| Mar 1, 2010 | Completed final sign-off Mar 2010 | 1515 Greenwich St | to obtain final inspection for work approved under app #200705232016. all work is completeDetails
to obtain final inspection for work approved under app #200705232016. all work is complete | ||
| Jan 21, 2010 | Completed final sign-off Feb 2010 | 1515 Greenwich St | to obtain final inspection for work approved under app #200704259617. all work is complete.Details
to obtain final inspection for work approved under app #200704259617. all work is complete. | ||
| Jan 21, 2010 | Completed final sign-off Feb 2010 | 1515 Greenwich St | to obtain final inspection for work approved under app #200709072105. all work is complete.Details
to obtain final inspection for work approved under app #200709072105. all work is complete. | ||
| Jan 21, 2010 | Completed final sign-off Feb 2010 | 1515 Greenwich St | to obtain final inspection for work approved under app #200806174675. all work is complete.Details
to obtain final inspection for work approved under app #200806174675. all work is complete. | ||
| Feb 11, 2009 | Completed final sign-off Feb 2010 | 1515 Greenwich St | to obtain final inspection for work approved under pa#200604149012.Details
to obtain final inspection for work approved under pa#200604149012. | ||
| Feb 9, 2009 | Completed final sign-off Feb 2011 | 1515 Greenwich St | work on unit#2,#16,#22,#28. remodel kitchen and bath . no structural work. all existing walls to remain implace. all fluorescent lighting.Details
work on unit#2,#16,#22,#28. remodel kitchen and bath . no structural work. all existing walls to remain implace. all fluorescent lighting. | $102,000 | |
| Sep 22, 2008 | Completed final sign-off Nov 2009 | 1515 Greenwich St | San Francisco Fire Protection | install 1 fire panel, 2 annunciators, 1 pwr supply, 5 relay modules, 3 monitor modules, 8 pull stations, 26 smoke detectors, 1 heat detector, 5 strobes, 26 horn/strobes, 55 horns, and 1 door holder.Details
install 1 fire panel, 2 annunciators, 1 pwr supply, 5 relay modules, 3 monitor modules, 8 pull stations, 26 smoke detectors, 1 heat detector, 5 strobes, 26 horn/strobes, 55 horns, and 1 door holder. | $18,000 |
| Sep 5, 2008 | Never finaled issued Sep 2008, no final | 1515 Greenwich St | street space permit only.Details
street space permit only. | ||
| Jun 17, 2008 | Expired or cancelled expired Feb 2010 | 1515 Greenwich St | remodel units #6,7,14,15,18,26,27,and #33 including kitchen and bathroom. install gas line from laundry room to roof deck. (total of 8 bathrooms, 8 kitchens) non structuralwork. 5/8" type x @ common walls.Details
remodel units #6,7,14,15,18,26,27,and #33 including kitchen and bathroom. install gas line from laundry room to roof deck. (total of 8 bathrooms, 8 kitchens) non structuralwork. 5/8" type x @ common walls. | $132,000 | |
| Jun 17, 2008 | Expired or cancelled expired Dec 2008 | 1515 Greenwich St | install conduit for new fire alarm. fire alarm to be wired and installed undo seperate permit.Details
install conduit for new fire alarm. fire alarm to be wired and installed undo seperate permit. | $10,000 | |
| Jan 8, 2008 | Never finaled issued Jan 2008, no final | 1515 Greenwich St | street space permit only.Details
street space permit only. | ||
| Oct 22, 2007 | Never finaled issued Oct 2007, no final | 1515 Greenwich St | street spaceDetails
street space | ||
| Sep 7, 2007 | Expired or cancelled expired Dec 2008 | 1515 Greenwich St | W C Plumbing & Fire Protection | install fire sprinkler system only ongarage as shown on drawing.Details
install fire sprinkler system only ongarage as shown on drawing. | $25,000 |
| Aug 22, 2007 | Never finaled issued Aug 2007, no final | 1515 Greenwich St | street spaceDetails
street space | ||
| Jun 6, 2007 | Expired or cancelled expired May 2008 | 1515 Greenwich St | add new windows to #16, 17, 19, 21, 29, 31, 33 all windows do not face street, 35 windows total. bathroom doors and add new closet doors to east bedroom of unit #19 & 31 bathrooms. replace existing kitchen cabinets only to units #17, 19, 31 comply with title 24 energy codes. all non structural work.Details
add new windows to #16, 17, 19, 21, 29, 31, 33 all windows do not face street, 35 windows total. bathroom doors and add new closet doors to east bedroom of unit #19 & 31 bathrooms. replace existing kitchen cabinets only to units #17, 19, 31 comply with title 24 energy codes. all non structural work. | $15,000 | |
| Jun 6, 2007 | Expired or cancelled expired May 2008 | 1515 Greenwich St | remodel kitchen & bath of units #1,32 mvoe water and drain pipes in units #2,7 kitchen & baths so they avoid steel beams at garage below (appl#200604149012) bordering units #7,18,30,6,15,27. repair or replace plumbing to kitchen in those units when interior wal is exposed. comply with title 24 engerDetails
remodel kitchen & bath of units #1,32 mvoe water and drain pipes in units #2,7 kitchen & baths so they avoid steel beams at garage below (appl#200604149012) bordering units #7,18,30,6,15,27. repair or replace plumbing to kitchen in those units when interior wal is exposed. comply with title 24 enger | $20,000 | |
| May 23, 2007 | Expired or cancelled expired Dec 2008 | 1515 Greenwich St | add roof deck and new elevator to (e) building. remove old (e) elevator and rebuild elevator shaft and elevator penthouse per drawings to accomodate modern elevatorDetails
add roof deck and new elevator to (e) building. remove old (e) elevator and rebuild elevator shaft and elevator penthouse per drawings to accomodate modern elevator | $200,000 | |
| Apr 25, 2007 | Expired or cancelled expired May 2008 | 1515 Greenwich St | install 1.5 ft cfm ventilation system for new s1 garage (currently under construction) as required by pa# 2006/04/14/9012.Details
install 1.5 ft cfm ventilation system for new s1 garage (currently under construction) as required by pa# 2006/04/14/9012. | $8,000 | |
| Feb 20, 2007 | Never finaled issued Feb 2007, no final | 1515 Greenwich St | street space permit only.Details
street space permit only. | ||
| Jul 6, 2006 | Expired or cancelled expired May 2008 | 1515 Greenwich St | (1) kitchen & (1) bath remodel apartments #8,#20 only connect apartments #8,#20,#32,#39,#21,#33 to completed new water system. repair drain for same apartments. non structural work.Details
(1) kitchen & (1) bath remodel apartments #8,#20 only connect apartments #8,#20,#32,#39,#21,#33 to completed new water system. repair drain for same apartments. non structural work. | $30,000 | |
| Apr 14, 2006 | Expired or cancelled expired Feb 2010 | 1515 Greenwich St | remodel (e) grade level into parking garage & add steel for seismic improvement. sprinklers under separate permit. change of occupancy.Details
remodel (e) grade level into parking garage & add steel for seismic improvement. sprinklers under separate permit. change of occupancy. | $500,000 | |
| Mar 30, 2006 | Never finaled issued Mar 2006, no final | 1515 Greenwich St | street space permit only.Details
street space permit only. | ||
| Dec 23, 2005 | Expired or cancelled expired Aug 2007 | 1515 Greenwich St | remodel units 4, 12, 13, 25, 35, kitchen and bathroom, replace gold gas line, for #4, 13, 25 and install gas direct vent heater. comply w/ title 24 enerage code.Details
remodel units 4, 12, 13, 25, 35, kitchen and bathroom, replace gold gas line, for #4, 13, 25 and install gas direct vent heater. comply w/ title 24 enerage code. | $70,000 | |
| Dec 23, 2005 | Expired or cancelled expired Aug 2007 | 1515 Greenwich St | install gas line for heaters and ranges in unit 1,2,3,11,12,16,17,19,22,23,24,25,28,29,31,34,35, re-circulating water system, connect kitchen & bathrm in unit 11,22,23,35 to new water system, conncet bath only at unit 9, 33.Details
install gas line for heaters and ranges in unit 1,2,3,11,12,16,17,19,22,23,24,25,28,29,31,34,35, re-circulating water system, connect kitchen & bathrm in unit 11,22,23,35 to new water system, conncet bath only at unit 9, 33. | $20,000 | |
| Nov 15, 2005 | Expired or cancelled expired Aug 2007 | 1515 Greenwich St | remove remaining siding at east side of bldg to restore original look of bldg/total area is about 150 sq ft of wood/not visible from street/revision to app #200506134901Details
remove remaining siding at east side of bldg to restore original look of bldg/total area is about 150 sq ft of wood/not visible from street/revision to app #200506134901 | $1,000 | |
| Oct 13, 2005 | Never finaled issued Oct 2005, no final | 1515 Greenwich St | street space permitDetails
street space permit | ||
| Aug 22, 2005 | Completed final sign-off Feb 2006 | 1515 Greenwich St | install eight extra piers for vluntary protection due to the installation of shoring system by the aDetails
install eight extra piers for vluntary protection due to the installation of shoring system by the a | $10,000 | |
| Aug 4, 2005 | Never finaled issued Aug 2005, no final | 1515 Greenwich St | street spaceDetails
street space | ||
| Aug 4, 2005 | Expired or cancelled expired Aug 2007 | 1515 Greenwich St | replace windows in apartments #3,#4,#10,#13, #24,#25<#35 with with cottage style. double glazed.Details
replace windows in apartments #3,#4,#10,#13, #24,#25<#35 with with cottage style. double glazed. | $25,000 | |
| Jul 22, 2005 | Expired or cancelled expired Aug 2007 | 1515 Greenwich St | remodel 1 kitchen and 2 baths in apt 3 and apt 24 1 kitchen 1 bathDetails
remodel 1 kitchen and 2 baths in apt 3 and apt 24 1 kitchen 1 bath | $20,000 | |
| Jun 13, 2005 | Completed final sign-off Oct 2005 | 1515 Greenwich St | remove wood siding at 1st flr, exterior to expose orig plaster underneath. no struc work.to restoreDetails
remove wood siding at 1st flr, exterior to expose orig plaster underneath. no struc work.to restore | $5,000 | |
| Jun 13, 2005 | Expired or cancelled expired Aug 2007 | 1515 Greenwich St | remodel kitchen and baths in units 10, 34, and 23. add new direct vent gas heaters in each unit inDetails
remodel kitchen and baths in units 10, 34, and 23. add new direct vent gas heaters in each unit in | $30,000 | |
| Feb 7, 2005 | Completed final sign-off Jul 2006 | 1515 Greenwich St | shoring & underpinning as a result of proposed excavation & new const. at 2655 van nessDetails
shoring & underpinning as a result of proposed excavation & new const. at 2655 van ness | $115,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- San Francisco Fire Protection (2), Elex Solutions Inc, W C Plumbing & Fire Protection
- Architects
- Dominic Chu
- Engineers
- Carl Chan, Charles Breidinger, Dominic Chu
- Pmt consultant/expediters
- Source Refrigeration & Hvac
Find contractors for work like this