Permit GraphShortlistSan Francisco building permits since 2000

Block 0521, lot 030

9 Imperial Aly

City’s use
Multi-Family Residential
Built
1906
Stories
2
Units
2
Rooms
2 bathrooms
Building
1,778 sq ft
Lot
2,056 sq ft
Zoning
RH3
Construction type
D

From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map

Permits filed here

5 permits filed for this property since 2000.

CompletedIn progressNever finaledExpired or cancelled
FiledOutcomeAddressContractorWork described on the permitDeclared cost
Jun 12, 2020Completed
final sign-off Oct 2020
9 Imperial AlClear Windows And Clear Doors Inc9 & 9-1/2 imperial alley: replace 10 front windows (4 in front bedroom & 1 at entrace) replace with marvin aluminium clad wood casement windows in(e) wood frame, title 24 equivalent. same size, same location, no strutcural work. u-factor 0.32 or i
Details
Permit
202006128659
Status
complete
Filed
Jun 12, 2020
Permit issued
Aug 5, 2020
Final sign-off
Oct 22, 2020
Declared cost
$7,800
Address
9 Imperial Al

9 & 9-1/2 imperial alley: replace 10 front windows (4 in front bedroom & 1 at entrace) replace with marvin aluminium clad wood casement windows in(e) wood frame, title 24 equivalent. same size, same location, no strutcural work. u-factor 0.32 or i

Open the permit page

$7,800
Oct 9, 2019Completed
final sign-off Oct 2020
9 Imperial AlShanta Carpentry & Constrreplace 8 windows & 2 door at rear of bldg. in kind, same size ref pa# 201910033461. not visible from street. rear deck roof repair as needed. less than 50% w/ pt wood. no structural changes - repair in kind.
Details
Permit
201910093952
Status
complete
Filed
Oct 9, 2019
Permit issued
Oct 9, 2019
Final sign-off
Oct 9, 2020
Declared cost
$18,017
Address
9 Imperial Al

replace 8 windows & 2 door at rear of bldg. in kind, same size ref pa# 201910033461. not visible from street. rear deck roof repair as needed. less than 50% w/ pt wood. no structural changes - repair in kind.

Open the permit page

$18,017
Oct 3, 2019Completed
final sign-off Oct 2020
9 Imperial AlShanta Carpentry & Constrdryrot repair at rear of building. siding and some framing. approx 800 sq ft. not visible from street. no structurals change. repair in kind
Details
Permit
201910033461
Status
complete
Filed
Oct 3, 2019
Permit issued
Oct 3, 2019
Final sign-off
Oct 9, 2020
Declared cost
$14,500
Address
9 Imperial Al

dryrot repair at rear of building. siding and some framing. approx 800 sq ft. not visible from street. no structurals change. repair in kind

Open the permit page

$14,500
Aug 24, 2009Completed
final sign-off Jan 2010
9 Imperial Alnew kitchen cabinets, retile bathroom and replace toile, sink, bathtub. upgrade electrical work. no lighting work. existing to remain.
Details
Permit
200908245432
Status
complete
Filed
Aug 24, 2009
Permit issued
Aug 24, 2009
Final sign-off
Jan 14, 2010
Declared cost
$18,000
Address
9 Imperial Al

new kitchen cabinets, retile bathroom and replace toile, sink, bathtub. upgrade electrical work. no lighting work. existing to remain.

Open the permit page

$18,000
Aug 28, 2008Never finaled
issued Aug 2008, no final
9 Imperial Alstreet space permit only.
Details
Permit
M132766
Status
issued
Filed
Aug 28, 2008
Permit issued
Aug 28, 2008
Address
9 Imperial Al

street space permit only.

Open the permit page

Find contractors for work like this

Starts from the last permit filed here; change it to describe your own project. Results cover two-family buildings like this one.