Block 0495, lot 013
1655 Chestnut St
- City’s use
- Single Family Residential
- Built
- 1980
- Stories
- 1
- Units
- 1
- Rooms
- 2 bathrooms
- Building
- 975 sq ft
- Zoning
- RM2
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
8 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Dec 3, 2025 | Completed final sign-off Feb 2026 | 1655 Chestnut St | Fiedler Construction And Roofing Inc | reroofing. with hot works.Details
reroofing. with hot works. | $15,917 |
| Nov 8, 2024 | Completed final sign-off Nov 2025 | 1655 Chestnut St | San Francisco Fire Protection | replace fire alarm system to comply with sffc 1103.7.6.1 replace the exist facp with new facu. install new aes radio, rps, annuciator, smoke detector. heat detector, manual pulls, install low frequency sounders. all units potential sleeping areas to comply with sffc 1103.7.6.1Details
replace fire alarm system to comply with sffc 1103.7.6.1 replace the exist facp with new facu. install new aes radio, rps, annuciator, smoke detector. heat detector, manual pulls, install low frequency sounders. all units potential sleeping areas to comply with sffc 1103.7.6.1 | $10,000 |
| Mar 14, 2023 | Completed final sign-off Jun 2023 | 1655 Chestnut St | A -1 Roof Management & Construction, Inc | siding and trim replacement system is based on the following components 8/4 in hardic plank fiber cement plank at the building walls indicated nordic trim fiber cement. approx. 416 sq.ft.Details
siding and trim replacement system is based on the following components 8/4 in hardic plank fiber cement plank at the building walls indicated nordic trim fiber cement. approx. 416 sq.ft. | $9,082 |
| Dec 27, 2022 | Completed final sign-off Jun 2023 | 1655 Chestnut St | A -1 Roof Management & Construction, Inc | reroofingDetails
reroofing | $97,612 |
| Mar 25, 2016 | Never finaled issued Mar 2016, no final | 1655 Chestnut St | street spaceDetails
street space | ||
| Aug 12, 2011 | Completed final sign-off Sep 2011 | 1655 Chestnut St | Blackline Construction | #101 - convert existing closet to laundry closet. install drain, water supply, gas, dryer vent with fan assist and 1 110 volt recepticle. install posts and beams to increase opening between kitchen and living room.Details
#101 - convert existing closet to laundry closet. install drain, water supply, gas, dryer vent with fan assist and 1 110 volt recepticle. install posts and beams to increase opening between kitchen and living room. | $10,000 |
| Apr 4, 2007 | Completed final sign-off Jun 2007 | 1655 Chestnut St | Birkenshaw Construction | kitchen remodel new cabinets y new lights, counter tops. no structural work no wwindows work atest 50% lighting waattage must fluorescent.Details
kitchen remodel new cabinets y new lights, counter tops. no structural work no wwindows work atest 50% lighting waattage must fluorescent. | $10,000 |
| Aug 6, 2002 | Completed final sign-off Jan 2003 | 1655 Chestnut St | kitchen and bath remodelDetails
kitchen and bath remodel | $35,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- A -1 Roof Management & Construction, Inc (2), Birkenshaw Construction, Blackline Construction, Fiedler Construction And Roofing Inc, San Francisco Fire Protection
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.