Block 0493, lot 025
1849 Chestnut St
The city’s assessor roll has no record for this parcel.
Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
12 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jul 22, 2019 | Completed final sign-off Jul 2019 | 1849 Chestnut St | unit #5: to obtain final inspection for work approved under pa #201710171387 & 201807795017. all work is complete.Details
unit #5: to obtain final inspection for work approved under pa #201710171387 & 201807795017. all work is complete. | ||
| May 3, 2019 | Completed final sign-off Aug 2019 | 1849 Chestnut St | to comply with physical inspection report # cc-8174Details
to comply with physical inspection report # cc-8174 | $25,000 | |
| Aug 22, 2018 | Completed final sign-off Aug 2019 | 1849 Chestnut St | revision to bpa 2017-0920-9100 to include replace 3 window , 1 door(not visible from street) and r-15 insulation (walls) r-30 insulation ceiling. no exterior and structural work under this permit. all work in unit # 3Details
revision to bpa 2017-0920-9100 to include replace 3 window , 1 door(not visible from street) and r-15 insulation (walls) r-30 insulation ceiling. no exterior and structural work under this permit. all work in unit # 3 | $15,000 | |
| Jul 19, 2018 | Completed final sign-off Jul 2019 | 1849 Chestnut St | unit 5: maintain bedroom egress/rescue window, revision to pa#201710171387, removing of all interior finishes & replace (3) windows not visible from street, replace back door, not visible from street, remove (e) plaster/lath replace w/5/8" gyp bd type "x", r30 ceiling, r15 wallsDetails
unit 5: maintain bedroom egress/rescue window, revision to pa#201710171387, removing of all interior finishes & replace (3) windows not visible from street, replace back door, not visible from street, remove (e) plaster/lath replace w/5/8" gyp bd type "x", r30 ceiling, r15 walls | $10,000 | |
| May 8, 2018 | Completed final sign-off Oct 2020 | 1849 Chestnut St | Dba Golden Gate Termite, Diodati Inc | soft story retrofit per sfebc per sfebc chapter 4d:2016 cebc appendix a-4Details
soft story retrofit per sfebc per sfebc chapter 4d:2016 cebc appendix a-4 | $30,000 |
| Feb 23, 2018 | Completed final sign-off Mar 2018 | 1849 Chestnut St | Yong Chan Chon (Dba Ace Roofing Co.) | reroofingDetails
reroofing | $13,900 |
| Oct 17, 2017 | Completed final sign-off Jul 2019 | 1849 Chestnut St | unit #5 - cosmetic upgrades to the apartment. kitchen & bathroom upgrades, re-finish hardwood floors and paint interior.Details
unit #5 - cosmetic upgrades to the apartment. kitchen & bathroom upgrades, re-finish hardwood floors and paint interior. | $30,000 | |
| Sep 20, 2017 | Completed final sign-off Aug 2019 | 1849 Chestnut St | unit #3: electrical code compliance retrofit. bathroom remodel with relocation of extg toilet and sink work not affecting structural components. walls non-load bearing.Details
unit #3: electrical code compliance retrofit. bathroom remodel with relocation of extg toilet and sink work not affecting structural components. walls non-load bearing. | $40,000 | |
| May 4, 2017 | Completed final sign-off May 2017 | 1849 Chestnut St | to obtain a final inspection for work approved under pa#201105266918. all work is complete.Details
to obtain a final inspection for work approved under pa#201105266918. all work is complete. | ||
| Sep 9, 2014 | Never finaled issued Sep 2014, no final | 1849 Chestnut St | street space permitDetails
street space permit | ||
| Jul 11, 2012 | Completed final sign-off Jul 2012 | 1849 Chestnut St | Ideal Carpentry** See Contractor's Note* | dry rot repair on side landings, replace 1 x 4 t.6 where needed and replace 2 x 6 framing where needed, change lights in kind, less than 50% repair in kind.Details
dry rot repair on side landings, replace 1 x 4 t.6 where needed and replace 2 x 6 framing where needed, change lights in kind, less than 50% repair in kind. | $3,500 |
| May 26, 2011 | Never finaled issued Aug 2011, no final | 1849 Chestnut St | S & H Concrete Construction | lobby only - concrete slab replacement.Details
lobby only - concrete slab replacement. | $10,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Dba Golden Gate Termite, Diodati Inc, Ideal Carpentry** See Contractor's Note*, S & H Concrete Construction, Yong Chan Chon (Dba Ace Roofing Co.)
- Architects
- Chris Ridgwa, Thomas Devine
- Engineers
- Charles Kissick
Find contractors for work like this