Block 0338, lot 019
375 Eddy St
- City’s use
- Multi-Family Residential
- Built
- 1916
- Stories
- 6
- Units
- 37
- Rooms
- 37 bathrooms
- Building
- 20,400 sq ft
- Lot
- 6,873 sq ft
- Zoning
- RC4
- Construction type
- C
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
3 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Apr 18, 2024 | Completed final sign-off Mar 2026 | 375 Eddy St | San Francisco Fire Protection | relace fire alarm system to comply with sffc 1103.7.6.1. replace (e) facp with a new facu. install new rps, aes radio, led annunciator, monitor modules, horn strobes, and rope tamper. replace smoke detector and manual pulls. install new lf sounders in all units potential sleeping areasDetails
relace fire alarm system to comply with sffc 1103.7.6.1. replace (e) facp with a new facu. install new rps, aes radio, led annunciator, monitor modules, horn strobes, and rope tamper. replace smoke detector and manual pulls. install new lf sounders in all units potential sleeping areas | $25,000 |
| Aug 24, 2016 | Completed final sign-off Sep 2016 | 375 Eddy St | Building Efficiency Inc | attic insulation - blown-in cellulose.Details
attic insulation - blown-in cellulose. | $3,421 |
| Jul 21, 2015 | Never finaled issued Jul 2015, no final | 375 Eddy St | Ramirez Roofing Corporation | reroof: strip all (e) roofs and install new roof consiting of one layer 28lb glass base, one layer sta membrane and 1 layer cota cap sheet. flat roof.Details
reroof: strip all (e) roofs and install new roof consiting of one layer 28lb glass base, one layer sta membrane and 1 layer cota cap sheet. flat roof. | $35,500 |
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.