Block 0336, lot 002
225 Hyde St
- City’s use
- Commercial Hotel
- Built
- 1928
- Stories
- 6
- Units
- 120
- Rooms
- 128 bathrooms
- Building
- 52,661 sq ft
- Lot
- 9,552 sq ft
- Zoning
- RC4
- Construction type
- C
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
12 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Apr 4, 2024 | In progress issued Apr 2024 | 225 Hyde St | Fire & Security & Alarm Co/ F.S.A.C. | as built to pa# 202305308805. remove relay module for recall. there are existing stand alone 120 vac smoke detectors for existing primary recall only and not part of the fire alarm system.Details
as built to pa# 202305308805. remove relay module for recall. there are existing stand alone 120 vac smoke detectors for existing primary recall only and not part of the fire alarm system. | |
| May 30, 2023 | Never finaled issued May 2023, no final | 225 Hyde St | Fire & Security & Alarm Co/ F.S.A.C. | like for like fire alarm system replacement with new facu, smoke dtectors,pull stations at the same locations. install radio comm. monitor modules for flow & tamper. low freq inside all studios,r eplacce (e) bell w/ new horn/strobes. install new relay module for primary elev. recall only.Details
like for like fire alarm system replacement with new facu, smoke dtectors,pull stations at the same locations. install radio comm. monitor modules for flow & tamper. low freq inside all studios,r eplacce (e) bell w/ new horn/strobes. install new relay module for primary elev. recall only. | $50,000 |
| Nov 15, 2019 | Never finaled issued Nov 2019, no final | 227 Hyde St | add 227 hyde st to 225 hyde st, 0336/002.Details
add 227 hyde st to 225 hyde st, 0336/002. | ||
| Nov 15, 2019 | Never finaled issued Nov 2019, no final | 229 Hyde St | remove 229 hyde st from 0336/002.Details
remove 229 hyde st from 0336/002. | ||
| Oct 7, 2014 | Completed final sign-off Dec 2014 | 225 Hyde St | S H C Construction | apt#208 sheet rock, patching primer & paint bathroom sheetrock, patching, primer & paint.Details
apt#208 sheet rock, patching primer & paint bathroom sheetrock, patching, primer & paint. | $3,700 |
| Jul 3, 2014 | Completed final sign-off Sep 2014 | 225 Hyde St | Murphy Construction | to obtain final inspection for work approved under pa#200011034910. all work is complete.Details
to obtain final inspection for work approved under pa#200011034910. all work is complete. | |
| Jun 9, 2014 | Never finaled issued Jun 2014, no final | 225 Hyde St | Mark Scott Construction Inc | fire damaged repairs to unit 208, to include electrical, plumbing and new drywall to entire unit, repair in kind.Details
fire damaged repairs to unit 208, to include electrical, plumbing and new drywall to entire unit, repair in kind. | $15,000 |
| Apr 4, 2011 | Completed final sign-off Jun 2011 | 225 Hyde St | Murphy Construction | #602- restoring one apartment unit approx. 225 sq.ft. that was damaged by fire - replace walls, flooring, cabinets & countertop. no structural damaged, no lighting work. as per field inspection on 4/1/11.Details
#602- restoring one apartment unit approx. 225 sq.ft. that was damaged by fire - replace walls, flooring, cabinets & countertop. no structural damaged, no lighting work. as per field inspection on 4/1/11. | $15,000 |
| Jun 19, 2008 | Never finaled issued Jun 2008, no final | 225 Hyde St | same street space & sidewalkDetails
same street space & sidewalk | ||
| Feb 23, 2006 | Never finaled issued Feb 2006, no final | 225 Hyde St | street spaceDetails
street space | ||
| Dec 1, 2005 | Completed final sign-off Mar 2006 | 225 Hyde St | Saarman Construction,Ltd. | install scaffold remove spalling concrete on 3 corners of bldg inspect rebar and coat install approved modified polymer modified mortar and apply a finish coat of elastomeric wall waterproofing all work to follow icri guide linesDetails
install scaffold remove spalling concrete on 3 corners of bldg inspect rebar and coat install approved modified polymer modified mortar and apply a finish coat of elastomeric wall waterproofing all work to follow icri guide lines | $96,000 |
| Nov 3, 2000 | Expired or cancelled expired Oct 2001 | 225 Hyde St | signDetails
sign | $1,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Fire & Security & Alarm Co/ F.S.A.C. (2), Murphy Construction (2), Mark Scott Construction Inc, S H C Construction, Saarman Construction,Ltd.