Block 0322, lot 006A
400 Hyde St
- City’s use
- Multi-Family Residential
- Built
- 1926
- Stories
- 7
- Units
- 69
- Rooms
- 69 bathrooms
- Building
- 49,430 sq ft
- Lot
- 8,245 sq ft
- Zoning
- RC4
- Construction type
- C
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
9 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jul 1, 2026 | In progress filed Jul 2026, not yet issued | 400 Hyde St | a modification to an (e) verizon wireless unmanned telecommunication facility consisting of: removing (4) (e) antennas, removing (4) (e) radio 8843 units @ attennas, installing (4) (n) antennas on (e) antenna mounting pipes inside (e) frp radomes, installing (4) (n) antennas on (n) antenna...Details
a modification to an (e) verizon wireless unmanned telecommunication facility consisting of: removing (4) (e) antennas, removing (4) (e) radio 8843 units @ attennas, installing (4) (n) antennas on (e) antenna mounting pipes inside (e) frp radomes, installing (4) (n) antennas on (n) antenna... | $90,000 | |
| Jan 28, 2025 | In progress filed Jan 2025, not yet issued | 400 Hyde St | San Francisco Fire Protection | replace f/a system to comply w/ sffc 1103.7.6.1:replace facp w/ 1 (n) facu,install p/s,led annunciator,radio communicator with monitor modules, 3 relays for elevator recall, 77 low freq sounders in unit sleeping areas,replace 29 smokes, 8 pulls, replace 14 bells to horn/strobes.Details
replace f/a system to comply w/ sffc 1103.7.6.1:replace facp w/ 1 (n) facu,install p/s,led annunciator,radio communicator with monitor modules, 3 relays for elevator recall, 77 low freq sounders in unit sleeping areas,replace 29 smokes, 8 pulls, replace 14 bells to horn/strobes. | $90,000 |
| Jun 9, 2023 | Completed final sign-off Aug 2025 | 400 Hyde St | Jfc Construction Inc. | (n) verizon wireless antennas unmanned telecommuncation facility consist of: 8 (n) verizon wireless antennas inside 30" frp vents 12 (n) radio units 8 (n) surge suprerssor 4 @ equpment & 4 @ antennas. (n) veirzon wireless 392 sq ft equpment lease area located on roof. 4 (n) antenna lease areas locatDetails
(n) verizon wireless antennas unmanned telecommuncation facility consist of: 8 (n) verizon wireless antennas inside 30" frp vents 12 (n) radio units 8 (n) surge suprerssor 4 @ equpment & 4 @ antennas. (n) veirzon wireless 392 sq ft equpment lease area located on roof. 4 (n) antenna lease areas locat | $150,000 |
| Jul 28, 2021 | Completed final sign-off Oct 2021 | 400 Hyde St | Tom Lee Roofing Inc. | reroofing.to comply with coof roof requirements per 2019 california energy code 141.0(b)2bDetails
reroofing.to comply with coof roof requirements per 2019 california energy code 141.0(b)2b | $100,000 |
| Oct 5, 2017 | Never finaled issued Oct 2017, no final | 400 Hyde St | street spaceDetails
street space | ||
| Sep 1, 2017 | Never finaled issued Sep 2017, no final | 400 Hyde St | street spaceDetails
street space | ||
| Jun 19, 2014 | Never finaled issued Jun 2014, no final | 400 Hyde St | street space & sidewalk permitDetails
street space & sidewalk permit | ||
| Feb 3, 2012 | Completed final sign-off Feb 2012 | 400 Hyde St | comply with complaint#201283597 legalize the installation of barbed wire, 18" above metal gate, above the security gate.Details
comply with complaint#201283597 legalize the installation of barbed wire, 18" above metal gate, above the security gate. | $400 | |
| May 3, 2002 | Expired or cancelled expired Sep 2002 | 400 Hyde St | sidewalk repairDetails
sidewalk repair |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Jfc Construction Inc., San Francisco Fire Protection, Tom Lee Roofing Inc.
- Engineers
- James Spore, Joel Martman
- Authorized agent-otherss
- Ryan Lee, Wendy Ho
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.