Block 0313, lot 007
23 Grant Ave
- City’s use
- Commercial Retail
- Built
- 1909
- Stories
- 6
- Units
- 1
- Rooms
- 13 bathrooms
- Building
- 22,140 sq ft
- Lot
- 3,640 sq ft
- Zoning
- C3R
- Construction type
- B
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
9 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 10, 2026 | In progress issued Sep 2026 | 23 Grant Av | Msa Framing | 6/f: demo small sections and partition wall. new partition wall with counter and cabinets. refinish existing flooring. replace sink and toilet. new outlets, new book shelfs, new office desks, new cabinets and paint the place. electrical deferred - electric sheets reference onlyDetails
6/f: demo small sections and partition wall. new partition wall with counter and cabinets. refinish existing flooring. replace sink and toilet. new outlets, new book shelfs, new office desks, new cabinets and paint the place. electrical deferred - electric sheets reference only | $50,000 |
| Jun 28, 2023 | Completed final sign-off Jun 2024 | 23 Grant Av | per ordiance 51-16 abe program to comply w/accessible entrance program. 23 grant abe#: 201902155320. share plans with 202306281072 and 202306281075 remove and reinstall lower door actuator at correct height.Details
per ordiance 51-16 abe program to comply w/accessible entrance program. 23 grant abe#: 201902155320. share plans with 202306281072 and 202306281075 remove and reinstall lower door actuator at correct height. | $250 | |
| Jun 28, 2023 | Completed final sign-off Jun 2024 | 21 Grant Av | upgrade existing commerical enties per ordiance 51-16 abe program to comply w/accessible entrance program. 21 grant abe#: 201901255318. install signare for power operator share plans with 202306281072 and 202306281075Details
upgrade existing commerical enties per ordiance 51-16 abe program to comply w/accessible entrance program. 21 grant abe#: 201901255318. install signare for power operator share plans with 202306281072 and 202306281075 | $150 | |
| Mar 21, 2016 | Completed final sign-off Jul 2016 | 23 Grant Av | San Francisco Fire Protection | like for like voluntary fire system replacment with new control unit, smoke detector and pull station at the same location. install new relay modules for modernization of extg elevator recall. install radio communicator for monitoring the system.Details
like for like voluntary fire system replacment with new control unit, smoke detector and pull station at the same location. install new relay modules for modernization of extg elevator recall. install radio communicator for monitoring the system. | $4,300 |
| Sep 10, 2015 | Never finaled issued Sep 2015, no final | 23 Grant Av | street space & mta.Details
street space & mta. | ||
| May 30, 2013 | Expired or cancelled cancelled Apr 2019 | 21 Grant Av | retail ti on 1st floor only, including front facade & 1st 10' of interior space, including installing front panel with logo over (e) light box, vinyl window graphics, replacing (e) banner on (e) flag pole, & replace (e) stone base & repainting (e) storefront. new work within 1st 10' of interior spacDetails
retail ti on 1st floor only, including front facade & 1st 10' of interior space, including installing front panel with logo over (e) light box, vinyl window graphics, replacing (e) banner on (e) flag pole, & replace (e) stone base & repainting (e) storefront. new work within 1st 10' of interior spac | $20,000 | |
| May 30, 2013 | Never finaled issued Jun 2013, no final | 21 Grant Av | Marini Construction Inc | retail ti on 1st floor only. including new wood floor over (e) new finish on (e) displays & new finish for (e) walls, base & trim. no work on exterior nor interior work within the 1st 10' of interior space is included. all exterior work including 1st 10' of interior are filed under separate permit.Details
retail ti on 1st floor only. including new wood floor over (e) new finish on (e) displays & new finish for (e) walls, base & trim. no work on exterior nor interior work within the 1st 10' of interior space is included. all exterior work including 1st 10' of interior are filed under separate permit. | $100,000 |
| Jul 3, 2008 | Expired or cancelled cancelled Jan 2026 | 23 Grant Av | to erect non-electric double faced projecting sign.Details
to erect non-electric double faced projecting sign. | $1,477 | |
| Jul 31, 2000 | Completed final sign-off Nov 2000 | 23 Grant Av | tenant impro c level 4 of building. remodel 2 bath & alter space for office changes. plumbing & elecDetails
tenant impro c level 4 of building. remodel 2 bath & alter space for office changes. plumbing & elec | $48,000 |