Block 0302, lot 030
907 Post St
- City’s use
- Commercial Retail
- Built
- 1919
- Stories
- 1
- Rooms
- 2 bathrooms
- Building
- 1,602 sq ft
- Lot
- 1,224 sq ft
- Zoning
- RC4
- Construction type
- C
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
15 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Nov 19, 2015 | Never finaled issued Nov 2015, no final | 907 Post St | street spaceDetails
street space | ||
| Oct 16, 2015 | Completed final sign-off Oct 2015 | 907 Post St | Pyro-Comm Systems, Inc. | fire alarm as-builts. revision to app# 2015-0724-2428Details
fire alarm as-builts. revision to app# 2015-0724-2428 | |
| Oct 15, 2015 | Never finaled issued Oct 2015, no final | 907 Post St | Plant Construction Co, Lp | street spaceDetails
street space | |
| Oct 14, 2015 | Completed final sign-off Oct 2015 | 907 Post St | Plant Construction Co, Lp | revision to approved permit 2014-0729-2465 omit duct detectorsDetails
revision to approved permit 2014-0729-2465 omit duct detectors | |
| Jul 24, 2015 | Completed final sign-off Oct 2015 | 907 Post St | Pyro-Comm Systems, Inc. | fire alarm include 1 facu, 1 annunciator, 3 pull stations, 8 smoke detectors, 3 duct detectors, 3 relay modules, 3 monitor modules, 3 horn/strobes and 2 strobes. ref. appl. 2014.0729.2465 & 2011.1219.0971.Details
fire alarm include 1 facu, 1 annunciator, 3 pull stations, 8 smoke detectors, 3 duct detectors, 3 relay modules, 3 monitor modules, 3 horn/strobes and 2 strobes. ref. appl. 2014.0729.2465 & 2011.1219.0971. | $13,430 |
| Jun 12, 2015 | Never finaled issued Jun 2015, no final | 907 Post St | street spaceDetails
street space | ||
| Jan 23, 2015 | Completed final sign-off Jul 2015 | 907 Post St | Plant Construction Co, Lp | proposed soild grouting per geotech report, see approved app# 201407292465Details
proposed soild grouting per geotech report, see approved app# 201407292465 | $50,000 |
| Jan 8, 2015 | Never finaled issued Jan 2015, no final | 907 Post St | street space permitDetails
street space permit | ||
| Jul 29, 2014 | Completed final sign-off Oct 2015 | 907 Post St | Plant Construction Co, Lp | revision to appl #2011.1219.0971 to incl mech, lighting , plumbing. structural scope to include (n) basement floor & new roof replacement, no dwellings, add'l stories, or change of use proposed.Details
revision to appl #2011.1219.0971 to incl mech, lighting , plumbing. structural scope to include (n) basement floor & new roof replacement, no dwellings, add'l stories, or change of use proposed. | |
| May 5, 2014 | Never finaled issued May 2014, no final | 907 Post St | street space permit (renewal of permit # 1313259/m454207)Details
street space permit (renewal of permit # 1313259/m454207) | ||
| Dec 27, 2013 | Never finaled issued Dec 2013, no final | 907 Post St | streetspace with mtaDetails
streetspace with mta | ||
| Dec 19, 2011 | Never finaled issued May 2013, no final | 907 Post St | Johnstone - Mc Auliffe Const. Inc. | interior & structural improvements to (e) 2 story commercial bldg. structural improvements include required structural & seismic strengthening. interiors include new 2nd story, stairs, hc accessibile restrooms & finishes. replace glass in (e) doors, windows. new entry door. no change in useDetails
interior & structural improvements to (e) 2 story commercial bldg. structural improvements include required structural & seismic strengthening. interiors include new 2nd story, stairs, hc accessibile restrooms & finishes. replace glass in (e) doors, windows. new entry door. no change in use | $250,000 |
| Jul 19, 2011 | Never finaled issued Jul 2011, no final | 907 Post St | street spaceDetails
street space | ||
| May 2, 2011 | Never finaled issued May 2011, no final | 907 Post St | Johnstone - Mc Auliffe Const. Inc. | demolition of (e) non bearing partitions, (e) finishes & (e) plumbing. no improvements proposed. application comply w/ab-017. utilities to be capped for later, no work at storefront proposes.Details
demolition of (e) non bearing partitions, (e) finishes & (e) plumbing. no improvements proposed. application comply w/ab-017. utilities to be capped for later, no work at storefront proposes. | $1,500 |
| Aug 18, 2005 | Expired or cancelled withdrawn Oct 2007 | 907 Post St | remodel 2 story bldg-add 6 stories,6 residential units.commercial space will be provided on 1/fl.Details
remodel 2 story bldg-add 6 stories,6 residential units.commercial space will be provided on 1/fl. | $1,400,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Plant Construction Co, Lp (4), Johnstone - Mc Auliffe Const. Inc. (2), Pyro-Comm Systems, Inc. (2)
- Architects
- Elmer Lin (3), Kotas/Pantaleoni Arch
- Engineers
- Meng Hsiu Chen
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.