Block 0287, lot 003
237 Kearny St
- City’s use
- Commercial Retail
- Built
- 1907
- Stories
- 3
- Units
- 2
- Rooms
- 5 bathrooms
- Building
- 6,122 sq ft
- Lot
- 2,173 sq ft
- Zoning
- C3O
- Construction type
- C
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
13 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Oct 27, 2022 | Never finaled filed Oct 2022, never issued | 237 Kearny St | structural drawings for operable partition on the 15th floor. also knowm as wall support. permit revision to arch permit ref# 2022-0718-8654.Details
structural drawings for operable partition on the 15th floor. also knowm as wall support. permit revision to arch permit ref# 2022-0718-8654. | ||
| Apr 12, 2019 | Never finaled issued Apr 2019, no final | 239 Kearny St | Scott Kaiser Co | interior exploratory demolition of flooring and ceiling (water damage).Details
interior exploratory demolition of flooring and ceiling (water damage). | $2,000 |
| Jan 9, 2008 | Never finaled issued Jan 2008, no final | 239 Kearny St | replace (3) windows @ cladia st. alley (back) in kind @ ground floor.Details
replace (3) windows @ cladia st. alley (back) in kind @ ground floor. | $1,500 | |
| Aug 29, 2006 | Expired or cancelled cancelled Dec 2007 | 239 Kearny St | change (e) storage in the basement to a lounge for blu pointe bar. as a result, affected the (e) occupancy type, change from the (e) group 'b' to group 'a-3'.Details
change (e) storage in the basement to a lounge for blu pointe bar. as a result, affected the (e) occupancy type, change from the (e) group 'b' to group 'a-3'. | ||
| Jul 7, 2006 | Never finaled issued Jul 2006, no final | 237 Kearny St | Jackey's Roofing & Const/Dba Yip Constr | reroofing.Details
reroofing. | $22,000 |
| Mar 21, 2005 | Expired or cancelled expired Jun 2006 | 239 Kearny St | San Francisco Fire Protection | fire suppression system over hood and duct. pcl-300.Details
fire suppression system over hood and duct. pcl-300. | $2,000 |
| Feb 14, 2005 | Completed final sign-off Mar 2005 | 239 Kearny St | Mutual Seiko Construction | refer to appln #200410277788 blu points oyster bar upgrade ref space to one hour fire rating installDetails
refer to appln #200410277788 blu points oyster bar upgrade ref space to one hour fire rating install | $5,000 |
| Jan 24, 2005 | Expired or cancelled expired Jun 2006 | 237 Kearny St | Stars Awning Co Inc | install restractable awning at the back of the buildingDetails
install restractable awning at the back of the building | $2,500 |
| Dec 2, 2004 | Completed final sign-off Aug 2005 | 239 Kearny St | Yum's Mechanical Co Inc | type 1 hood exhaust fans/1 make up air/1 force fresh air system /1 type 2 hoodDetails
type 1 hood exhaust fans/1 make up air/1 force fresh air system /1 type 2 hood | $18,000 |
| Nov 29, 2004 | Never finaled issued Nov 2004, no final | 239 Kearny St | street spaceDetails
street space | ||
| Oct 27, 2004 | Completed final sign-off Aug 2005 | 239 Kearny St | renovation of (e) empty space into restaurant/bar on ground floor & level above.Details
renovation of (e) empty space into restaurant/bar on ground floor & level above. | $100,000 | |
| Aug 13, 2002 | Completed final sign-off Jul 2003 | 237 Kearny St | Mutual Seiko Const Co | build mezzanine, excavate basement, plans submitted for architectural & strucrl workDetails
build mezzanine, excavate basement, plans submitted for architectural & strucrl work | $40,000 |
| Jul 19, 2002 | Completed final sign-off Jul 2003 | 237 Kearny St | constriuct mezz, stairs to upper floor, h/c bath rooms, lower basement slabDetails
constriuct mezz, stairs to upper floor, h/c bath rooms, lower basement slab | $90,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Jackey's Roofing & Const/Dba Yip Constr, Mutual Seiko Const Co, Mutual Seiko Construction, San Francisco Fire Protection, Scott Kaiser Co, Stars Awning Co Inc, Yum's Mechanical Co Inc
- Architects
- Reuben Schwartz
- Engineers
- Alan Burr
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.