Block 0212, lot 006
1025 Powell St
- City’s use
- Multi-Family Residential
- Built
- 1926
- Stories
- 3
- Units
- 18
- Rooms
- 18 bathrooms
- Building
- 9,000 sq ft
- Lot
- 3,598 sq ft
- Zoning
- RC4
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
7 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jun 20, 2025 | Completed final sign-off Jul 2025 | 1025 Powell St | Better Built Contractor Inc | existing altered windows by others approx. 4 windows. to comply with nov #202538331Details
existing altered windows by others approx. 4 windows. to comply with nov #202538331 | $1,500 |
| Apr 19, 2024 | Completed final sign-off Apr 2024 | 1025 Powell St | Curran & Associates General Contractors | to obtain final inspection for work approved under permit app# 201512084514. all work is complete.Details
to obtain final inspection for work approved under permit app# 201512084514. all work is complete. | |
| Apr 5, 2024 | Completed final sign-off Apr 2024 | 1025 Powell St | Hertz Electric | upgrade fire alarm panel with lfh in the sleeping area and a power supply unitDetails
upgrade fire alarm panel with lfh in the sleeping area and a power supply unit | $7,500 |
| Jan 24, 2022 | Never finaled issued Jan 2022, no final | 1025 Powell St | Woo Hyung Youn | reroofingDetails
reroofing | $18,000 |
| Dec 8, 2015 | Expired or cancelled expired Apr 2024 | 1025 Powell St | Curran & Associates General Contractors | soft story compliance: method 2012 iebc appendix 4a. mandatory seismic retrofit per sfbc chapter 34b bldg reinforcemetn on ground floor. add new shear wall, hold downs and structural bolts per plans. install steel regular moment frame.Details
soft story compliance: method 2012 iebc appendix 4a. mandatory seismic retrofit per sfbc chapter 34b bldg reinforcemetn on ground floor. add new shear wall, hold downs and structural bolts per plans. install steel regular moment frame. | $60,000 |
| Mar 17, 2009 | Completed final sign-off Apr 2009 | 1025 Powell St | Bethel Construction Inc Dba Aaa Construc | provide a 1 hour fire resistant surface to the ceiling (north garage) by install 5/8" type x drywall per ga file no. 5420. comply with nov 200991661, items 4,5, and 6. also, provide 1-hour fire resistant construciton @ tradesman's alley.Details
provide a 1 hour fire resistant surface to the ceiling (north garage) by install 5/8" type x drywall per ga file no. 5420. comply with nov 200991661, items 4,5, and 6. also, provide 1-hour fire resistant construciton @ tradesman's alley. | $1,500 |
| Nov 2, 2007 | Never finaled issued Nov 2007, no final | 1025 Powell St | street spaceDetails
street space |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Curran & Associates General Contractors (2), Bethel Construction Inc Dba Aaa Construc, Better Built Contractor Inc, Hertz Electric, Woo Hyung Youn
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.