Block 0206, lot 025
425 Battery St
- City’s use
- Commercial Hotel
- Lot
- 14,128 sq ft
- Zoning
- C3O
- Construction type
- NA
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
58 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Dec 28, 2016 | Never finaled issued Dec 2016, no final | 425 Battery St | to obtain final inspection for work approved under pa # 200405174037. all work is complete.Details
to obtain final inspection for work approved under pa # 200405174037. all work is complete. | ||
| Sep 8, 2015 | Never finaled issued Dec 2015, no final | 425 Battery St | Kdc Construction | new wall at bar area. new floor, ceiling & wall finishes (demo (e)). remove & provide new casework, remove & provide new light fixtures, new hand sink, new keywork at restroom door, new soffit infill over bar area. new fixtures and furnishings; maher n/aDetails
new wall at bar area. new floor, ceiling & wall finishes (demo (e)). remove & provide new casework, remove & provide new light fixtures, new hand sink, new keywork at restroom door, new soffit infill over bar area. new fixtures and furnishings; maher n/a | $67,926 |
| Mar 5, 2015 | Never finaled issued Apr 2015, no final | 424 Clay St | Discount Signs & Neon Inc | ground floor: install (1) illuminated sign onto existing canopy.Details
ground floor: install (1) illuminated sign onto existing canopy. | $2,000 |
| Sep 12, 2014 | Completed final sign-off Sep 2014 | 425 Battery St | Liberty Construction | revision to (e) pa#2014-0813-3770 is the exhausted ventilation and title 24 for proposed change in use. compliance with ord 155-13 not requiredDetails
revision to (e) pa#2014-0813-3770 is the exhausted ventilation and title 24 for proposed change in use. compliance with ord 155-13 not required | $2,000 |
| Aug 18, 2014 | Never finaled issued Aug 2014, no final | 425 Battery St | street spaceDetails
street space | ||
| Aug 13, 2014 | Completed final sign-off Sep 2014 | 425 Battery St | Liberty Construction | proposed change in use from laundrymat to "new french nail", add 1 h.c. restroom, break room, facial room as shown on proposed plans. n/a ordinance#155-13.Details
proposed change in use from laundrymat to "new french nail", add 1 h.c. restroom, break room, facial room as shown on proposed plans. n/a ordinance#155-13. | $25,000 |
| May 20, 2014 | Expired or cancelled cancelled Jan 2026 | 425 Battery St | erect (2) illuminate double faced projecting sign. n/a maher ordinance 133-15Details
erect (2) illuminate double faced projecting sign. n/a maher ordinance 133-15 | $4,800 | |
| Apr 30, 2014 | Completed final sign-off Aug 2014 | 425 Battery St | Frontier Fire Protection | work on 1st floor -fire sprinkler t.i. for a new "subway" remodel - 15 relocated or added fire sprinklers. reference ti 2014.0113.6159. compliance with ordinance #155-13 not requiredDetails
work on 1st floor -fire sprinkler t.i. for a new "subway" remodel - 15 relocated or added fire sprinklers. reference ti 2014.0113.6159. compliance with ordinance #155-13 not required | $3,000 |
| Apr 1, 2014 | Completed final sign-off Aug 2014 | 425 Battery St | Johnson Controls Security Solutions Llc | ground floor f/a ti: relocating 4 extg. strobes. reference app#201401136159. n/a for the maher ordinance #155-13Details
ground floor f/a ti: relocating 4 extg. strobes. reference app#201401136159. n/a for the maher ordinance #155-13 | $3,000 |
| Jan 13, 2014 | Never finaled issued Feb 2014, no final | 425 Battery St | Jebian Construction Inc | t.i. for a new restaurant "sub-way" construction to be in full compliance with disable access requirement. no structural system is affected.Details
t.i. for a new restaurant "sub-way" construction to be in full compliance with disable access requirement. no structural system is affected. | $105,000 |
| Apr 29, 2013 | Never finaled issued Apr 2013, no final | 424 Clay St | street space permitDetails
street space permit | ||
| Dec 4, 2012 | Completed final sign-off Mar 2013 | 424 Clay St | Andes General Construction | minor interior non structural modification to a business louge. includes new raised floor, new gypsum board partition, extension of (e) acoustic ceiling, relocate light fixture and electrical outelts. no change to mech system, sprinklers and fire alarm to be submitted under separate permit.Details
minor interior non structural modification to a business louge. includes new raised floor, new gypsum board partition, extension of (e) acoustic ceiling, relocate light fixture and electrical outelts. no change to mech system, sprinklers and fire alarm to be submitted under separate permit. | $13,000 |
| Nov 6, 2012 | Never finaled issued Nov 2012, no final | 424 Clay St | street space permitDetails
street space permit | ||
| Nov 5, 2012 | Completed final sign-off Jul 2015 | 424 Clay St | E. J. Weber Elect.Co Inc | add speaker and strobes for coverage throughout. installation of 3 new gc 57vm speaker/strobes. installation of 2 new g1 vm strobesDetails
add speaker and strobes for coverage throughout. installation of 3 new gc 57vm speaker/strobes. installation of 2 new g1 vm strobes | $6,700 |
| Oct 3, 2012 | Never finaled issued Oct 2012, no final | 424 Clay St | street spaceDetails
street space | ||
| Aug 27, 2012 | Never finaled issued Aug 2012, no final | 424 Clay St | street spaceDetails
street space | ||
| Aug 15, 2012 | Never finaled issued Aug 2012, no final | 424 Clay St | Bay Cities Fire Protection | basement - new location of relocate upright to pendent sprinkler from the ruster "t" to the new "t" bar ceiling. total relocate heads 11 to center.Details
basement - new location of relocate upright to pendent sprinkler from the ruster "t" to the new "t" bar ceiling. total relocate heads 11 to center. | $2,600 |
| Jun 13, 2012 | Completed final sign-off Nov 2012 | 424 Clay St | Andes General Construction | basement remodel work to include new gypsum board and glass partitions, new carpet, ceiling, lighting and mep. 97 square foot structural infill in 1st floor slab. fire sprinklers and alarm under separate permit.Details
basement remodel work to include new gypsum board and glass partitions, new carpet, ceiling, lighting and mep. 97 square foot structural infill in 1st floor slab. fire sprinklers and alarm under separate permit. | $187,400 |
| Feb 18, 2011 | Completed final sign-off Mar 2011 | 424 Clay St | Stanton Mechanical Inc | revision to 201101131319: changes to venting, thermal wrap insteads of flamebarDetails
revision to 201101131319: changes to venting, thermal wrap insteads of flamebar | $15,000 |
| Jan 27, 2011 | Never finaled issued Jan 2011, no final | 424 Clay St | Carter Brothers Fire & Life Safety | add 1 new control module to an extg fire alarm system to release a locked extg door.Details
add 1 new control module to an extg fire alarm system to release a locked extg door. | $3,400 |
| Jan 13, 2011 | Completed final sign-off Mar 2011 | 424 Clay St | Stanton Mechanical Inc | install new dryer vent for dryers on basement level 1 penetrating to courtyard. the other going up 1 floor and penetrating to loading dockDetails
install new dryer vent for dryers on basement level 1 penetrating to courtyard. the other going up 1 floor and penetrating to loading dock | $15,000 |
| Feb 5, 2008 | Completed final sign-off Oct 2008 | 424 Clay St | R G K Construction Services | revision to structural detail for demo of (e) slab. appli. 200706012738. install new sump pumps at basement.Details
revision to structural detail for demo of (e) slab. appli. 200706012738. install new sump pumps at basement. | |
| Jun 4, 2007 | Expired or cancelled expired Apr 2009 | 424 Clay St | R L H Fire Protection Inc | ti upgrade of e fire sprinkler system, elephant and castle (3469) 4 heads to be relocated , 1 delete, street lvelDetails
ti upgrade of e fire sprinkler system, elephant and castle (3469) 4 heads to be relocated , 1 delete, street lvel | $800 |
| Jun 1, 2007 | Completed final sign-off Oct 2008 | 424 Clay St | R G K Construction Services | install 8 sump pump 3'x3' deep in the basement.Details
install 8 sump pump 3'x3' deep in the basement. | $72,000 |
| May 11, 2007 | Never finaled issued May 2007, no final | 424 Clay St | street space permitDetails
street space permit | ||
| May 4, 2007 | Expired or cancelled expired Apr 2011 | 424 Clay St | R S Mac Farlane Company Inc. | vacant space in an existing 12 story building. club room work will include new demising wall and new carpet and finishesDetails
vacant space in an existing 12 story building. club room work will include new demising wall and new carpet and finishes | $40,000 |
| May 22, 2006 | Never finaled issued May 2006, no final | 424 Clay St | street spaceDetails
street space | ||
| Jun 27, 2005 | Expired or cancelled expired Jul 2006 | 425 Battery St | Johnston Sign Company | to erect double faced electric signDetails
to erect double faced electric sign | $4,500 |
| Apr 28, 2005 | Never finaled issued Apr 2005, no final | 425 Battery St | street spaceDetails
street space | ||
| Mar 1, 2005 | Completed final sign-off Mar 2005 | 425 Battery St | Swinerton Builders | renew#200110160875,200111092774,200206219609 for finalDetails
renew#200110160875,200111092774,200206219609 for final | |
| Feb 18, 2005 | Never finaled issued Feb 2005, no final | 425 Battery St | street spaceDetails
street space | ||
| Feb 7, 2005 | Expired or cancelled expired Aug 2006 | 425 Battery St | International Commercial Awning, Inc. | install new awning over storefront (see plan)Details
install new awning over storefront (see plan) | $1,300 |
| Feb 3, 2005 | Completed final sign-off Mar 2005 | 425 Battery St | W L Electrical Co | add install two chime strobes in existing fire alarm system.Details
add install two chime strobes in existing fire alarm system. | $2,000 |
| Feb 3, 2005 | Completed final sign-off Mar 2005 | 425 Battery St | Tony Ng Plumbing Co | relocate existing sprinkler heads.Details
relocate existing sprinkler heads. | $3,500 |
| Jan 24, 2005 | Expired or cancelled expired Aug 2006 | 425 Battery St | Beacon Fire & Safety Lp/Nickell Fire Equ | lowering of 3 sprinkler headsDetails
lowering of 3 sprinkler heads | $1,800 |
| Jan 7, 2005 | Never finaled issued Jan 2005, no final | 425 Battery St | street spaceDetails
street space | ||
| Sep 20, 2004 | Completed final sign-off Oct 2004 | 424 Clay St | Zebra Awning Co Inc | fabricate and install 1 awning/15' widex 2'-10 drop x 3' projectionDetails
fabricate and install 1 awning/15' widex 2'-10 drop x 3' projection | $1,800 |
| Sep 20, 2004 | Completed final sign-off Oct 2004 | 424 Clay St | Zebra Awning Co Inc | paint club quarters logo onto front of canopy 1 typeDetails
paint club quarters logo onto front of canopy 1 type | |
| Aug 19, 2004 | Completed final sign-off Oct 2004 | 425 Battery St | Swinerton Builders | construct 9x12 ft boiler enclosure roof and walls within (e) roof-top mechanical enclosure. (per revDetails
construct 9x12 ft boiler enclosure roof and walls within (e) roof-top mechanical enclosure. (per rev | $5,000 |
| Aug 2, 2004 | Never finaled issued Aug 2004, no final | 425 Battery St | address assignmentDetails
address assignment | ||
| May 28, 2004 | Never finaled issued May 2004, no final | 425 Battery St | 3 speakers and 5 strobes to be installedDetails
3 speakers and 5 strobes to be installed | $7,000 | |
| May 28, 2004 | Expired or cancelled expired Aug 2006 | 424 Clay St | installation of (1) speaker/strobeDetails
installation of (1) speaker/strobe | $3,000 | |
| May 28, 2004 | Never finaled issued May 2004, no final | 424 Clay St | address assignmentDetails
address assignment | ||
| May 26, 2004 | Expired or cancelled expired Aug 2006 | 425 Battery St | clarify work for appl#200405174037 3 dimising wall as shown on 1/f to split space to 4 spacesDetails
clarify work for appl#200405174037 3 dimising wall as shown on 1/f to split space to 4 spaces | ||
| May 26, 2004 | Never finaled issued May 2004, no final | 425 Battery St | address assignmentDetails
address assignment | ||
| May 24, 2004 | Completed final sign-off Jul 2004 | 425 Battery St | Zebra Awning Co Inc | erect sign for non electric, projecting , double facedDetails
erect sign for non electric, projecting , double faced | |
| May 24, 2004 | Completed final sign-off Jul 2004 | 425 Battery St | Zebra Awning Co Inc | painted or other non structural sign.Details
painted or other non structural sign. | $150 |
| May 24, 2004 | Completed final sign-off Jul 2004 | 425 Battery St | Zebra Awning Co Inc | fabricate and install, 1 dome awning 76" wide x 38" protection x33" high and 1 bonner, 30" wide x4'Details
fabricate and install, 1 dome awning 76" wide x 38" protection x33" high and 1 bonner, 30" wide x4' | $1,600 |
| Apr 15, 2004 | Never finaled issued Apr 2004, no final | 425 Battery St | address assignment-suite assignmentDetails
address assignment-suite assignment | ||
| Apr 14, 2004 | Expired or cancelled expired Aug 2006 | 425 Battery St | new demizing wall in new empty space - 2-handicap bathroom reception areaDetails
new demizing wall in new empty space - 2-handicap bathroom reception area | $40,000 | |
| Sep 8, 2003 | Completed final sign-off Nov 2003 | 425 Battery St | Zebra Awning Co Inc | install 2 dome style awnings, 1 corner window and 1 window doorwyDetails
install 2 dome style awnings, 1 corner window and 1 window doorwy | $2,000 |
| Apr 8, 2003 | Completed final sign-off May 2003 | 425 Battery St | Zebra Awning Co Inc | fabricate & install 1 canopyDetails
fabricate & install 1 canopy | $1,700 |
| Jan 29, 2003 | Completed final sign-off May 2003 | 425 Battery St | signDetails
sign | ||
| Jan 29, 2003 | Completed final sign-off May 2003 | 425 Battery St | awnings for 425 battery stDetails
awnings for 425 battery st | $20,000 | |
| Jan 24, 2003 | Never finaled issued Jan 2003, no final | 425 Battery St | Dynalectric Company | fire life safety in new restaurant on 1/f and basement level in new bldg hotelDetails
fire life safety in new restaurant on 1/f and basement level in new bldg hotel | $30,000 |
| Dec 23, 2002 | Never finaled issued Dec 2002, no final | 425 Battery St | lighting only for main floor and basement architectural work under appln #200210159006Details
lighting only for main floor and basement architectural work under appln #200210159006 | $20,000 | |
| Dec 13, 2002 | Never finaled issued Mar 2003, no final | 425 Battery St | restaurant on 1st & lower level;elec & lighting on separate permitDetails
restaurant on 1st & lower level;elec & lighting on separate permit | $650,000 | |
| Oct 15, 2002 | Never finaled issued Dec 2002, no final | 425 Battery St | interior tenant buildout for rest., mep & life safety under separate permitDetails
interior tenant buildout for rest., mep & life safety under separate permit | $600,000 |
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.