Block 0196, lot 033
584 Washington St
- City’s use
- Commercial Retail
- Built
- 1900
- Stories
- 1
- Units
- 1
- Rooms
- 1 bathroom
- Building
- 1,084 sq ft
- Zoning
- NA
- Construction type
- NA
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
10 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Dec 6, 2019 | Never finaled issued Dec 2019, no final | 584 Washington St | street spaceDetails
street space | ||
| Nov 7, 2019 | Never finaled issued Nov 2019, no final | 584 Washington St | street spaceDetails
street space | ||
| Aug 29, 2019 | Never finaled issued Aug 2019, no final | 584 Washington St | street spaceDetails
street space | ||
| May 1, 2014 | Completed final sign-off May 2014 | 584 Washington St | International Fire Equip | ul300 fire system coverage for new kitchen equipment ref app#201311041034Details
ul300 fire system coverage for new kitchen equipment ref app#201311041034 | $2,000 |
| Apr 14, 2014 | Completed final sign-off Apr 2014 | 584 Washington St | O'connor Plumbing & Fire Protection | add 3 sprinkler heads, relocate 2 existing due to drop ceiling. n/a maher ord. 155-13. ref bpa#201404102901Details
add 3 sprinkler heads, relocate 2 existing due to drop ceiling. n/a maher ord. 155-13. ref bpa#201404102901 | $1,000 |
| Apr 10, 2014 | Completed final sign-off May 2014 | 584 Washington St | Schmitt Heating Co Inc | replace extg commercial kitchen exhaust fan on roof. connect to extg grease duct. n/a for the maher ordinance #155-13Details
replace extg commercial kitchen exhaust fan on roof. connect to extg grease duct. n/a for the maher ordinance #155-13 | $7,130 |
| Mar 28, 2014 | Completed final sign-off May 2014 | 584 Washington St | Shaum Mehra Construction | revision 201312063585: clarification by architect: 1. soffit framing plan; 2. locations of ada automatic door open switch. compliance with ordinance #155-13 not required.Details
revision 201312063585: clarification by architect: 1. soffit framing plan; 2. locations of ada automatic door open switch. compliance with ordinance #155-13 not required. | |
| Dec 6, 2013 | Completed final sign-off May 2014 | 584 Washington St | Shaum Mehra Construction | storefront remodelDetails
storefront remodel | $30,000 |
| Nov 26, 2013 | Completed final sign-off May 2014 | 584 Washington St | demo only: non-structural interior preperation . remove extg bar counter. built in tables., portion of non-structural interior walls. demo work only. t.i. under seperate permit #201311041034 not approved yet. demo per ab-017Details
demo only: non-structural interior preperation . remove extg bar counter. built in tables., portion of non-structural interior walls. demo work only. t.i. under seperate permit #201311041034 not approved yet. demo per ab-017 | $2,000 | |
| Nov 4, 2013 | Completed final sign-off May 2014 | 584 Washington St | Shaum Mehra Construction | replace (e) bar counter with accessible counter; reroute (e) accessible ramp; provide (n) light fixture and (n) sinks & floor sinks. ** maher: compliance with ordinance no# 155-13 not required **Details
replace (e) bar counter with accessible counter; reroute (e) accessible ramp; provide (n) light fixture and (n) sinks & floor sinks. ** maher: compliance with ordinance no# 155-13 not required ** | $38,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Shaum Mehra Construction (3), International Fire Equip, O'connor Plumbing & Fire Protection, Schmitt Heating Co Inc
- Architects
- Fumio Suda (3)
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.